logo

Zimbabwe - Emergency Power Infrastructure Rehabilitation Project

Sector: Water Supply and Storage • Location: Zimbabwe

Source: African Development Bank (AfDB)

Project

The Emergency Power Infrastructure Rehabilitation Project is a segment of an ongoing power sector infrastructure rehabilitation program identified by ZPC and ZETDC, subsidiaries of ZESA mandated to operate and maintain the Hwange Power Station and T&D networks respectively. It is in response to the mandate given by the Donor community to the Bank, to play a lead role in the infrastructure sector i

Project Information FAQ

Project Information

4 Q
The project “Zimbabwe - Emergency Power Infrastructure Rehabilitation Project” is an infrastructure initiative in the Water Supply and Storage sector, located in Zimbabwe. Taiyo aggregates data on it from African Development Bank (AfDB).

Want to explore the full details? View the full report

Participants

Sponsoring Agency

Obfuscated Data

Company

Obfuscated Data

Status

Original status

Obfuscated Data

Taiyo status

Obfuscated Data

Taiyo last update

00-00-0000

Available timestamps

00-00-0000

Available timestamp type

Obfuscated Data

Contact

Contact name

Obfuscated Data

Phone

0000000000

Email

ObfuscatedData@email.com

Address

Obfuscated Data, Obfuscated data, obfuscated data, Obfuscated data

Description

Description

The Emergency Power Infrastructure Rehabilitation Project is a segment of an ongoing power sector infrastructure rehabilitation program identified by ZPC and ZETDC, subsidiaries of ZESA mandated to operate and maintain the Hwange Power Station and T&D networks respectively. It is in response to the mandate given by the Donor community to the Bank, to play a lead role in the infrastructure sector in Zimbabwe. The project comprises the refurbishment of the Ash Plant and replacement of SubTransmission and Distribution level infrastructure throughout the country. It will also generate a comprehensive environmental and social management plan ESMP for the HPS that will help reduce the negative environmental effects of the coal fired power station when implemented. Its implementation will also help to improve the reliability of electricity supply to the treatment plant of the Harare city water supply and other urban water supply systems and thereby help prevent another cholera outbreak in the country. The project creates synergies with the “Emergency Water Supply and Sanitation Rehabilitation Project” also financed by the ZimFund. The total cost is estimated at USD 35.00 million (UA 22.727 million). The works will be implemented over a period of 21 months.

Original sub-sector

Obfuscated

Original Currency

USD

Original budget

000000000000000

Procurement method

Obfuscated Data

Budget

000000000000000

Location

Region

Obfuscated

Country

Obfuscated

State

Obfuscated Data

County

Obfuscated

Location

Obfuscated Data, Obfuscated data, obfuscated data, Obfuscated data

Source

Source reliability

High

Data quality score

100%

Source

Obfuscated Data

URL

obfuscated_data,obfuscateddata.com

More Details

Project Type

Obfuscated Data

Article Published Date

Obfuscated Data