Zimbabwe - Emergency Power Infrastructure Rehabilitation Project
Sector: Water Supply and Storage • Location: Zimbabwe
Source: African Development Bank (AfDB)
The Emergency Power Infrastructure Rehabilitation Project is a segment of an ongoing power sector infrastructure rehabilitation program identified by ZPC and ZETDC, subsidiaries of ZESA mandated to operate and maintain the Hwange Power Station and T&D networks respectively. It is in response to the mandate given by the Donor community to the Bank, to play a lead role in the infrastructure sector i
Project Information FAQ
Project Information
Want to explore the full details? View the full report
Participants
Sponsoring Agency | Obfuscated Data |
Company | Obfuscated Data |
Status
Original status | Obfuscated Data |
Taiyo status | Obfuscated Data |
Taiyo last update | 00-00-0000 |
Available timestamps | 00-00-0000 |
Available timestamp type | Obfuscated Data |
Contact
Contact name | Obfuscated Data |
Phone | 0000000000 |
ObfuscatedData@email.com | |
Address | Obfuscated Data, Obfuscated data, obfuscated data, Obfuscated data |
Description
Description | The Emergency Power Infrastructure Rehabilitation Project is a segment of an ongoing power sector infrastructure rehabilitation program identified by ZPC and ZETDC, subsidiaries of ZESA mandated to operate and maintain the Hwange Power Station and T&D networks respectively. It is in response to the mandate given by the Donor community to the Bank, to play a lead role in the infrastructure sector in Zimbabwe. The project comprises the refurbishment of the Ash Plant and replacement of SubTransmission and Distribution level infrastructure throughout the country. It will also generate a comprehensive environmental and social management plan ESMP for the HPS that will help reduce the negative environmental effects of the coal fired power station when implemented. Its implementation will also help to improve the reliability of electricity supply to the treatment plant of the Harare city water supply and other urban water supply systems and thereby help prevent another cholera outbreak in the country. The project creates synergies with the “Emergency Water Supply and Sanitation Rehabilitation Project” also financed by the ZimFund. The total cost is estimated at USD 35.00 million (UA 22.727 million). The works will be implemented over a period of 21 months. |
Original sub-sector | Obfuscated |
Original Currency | USD |
Original budget | 000000000000000 |
Procurement method | Obfuscated Data |
Budget | 000000000000000 |
Location
Region | Obfuscated |
Country | Obfuscated |
State | Obfuscated Data |
County | Obfuscated |
Location | Obfuscated Data, Obfuscated data, obfuscated data, Obfuscated data |
Source
Source reliability | High |
Data quality score | 100% |
Source | Obfuscated Data |
URL | obfuscated_data,obfuscateddata.com |
More Details
Project Type | Obfuscated Data |
Article Published Date | Obfuscated Data |
