Zimbabwe - National Transport Sector Master Plan Study
Sector: Road • Location: Zimbabwe
Source: African Development Bank (AfDB)
The study of the national transport sector master plan was designed as part of the new national transport policy and consistent with Zimbabwe's medium-term plan and its socio-economic transformation agenda. This study aims to analyze the characteristics and specificities of transport demand generated by the envisaged national development, which includes natural resource development, community acce
- Sector
- Road, Government
- Location
- Zimbabwe
- Updated
- 22 Jul 2026
- Source
- African Development Bank (AfDB)
ConstructChat
Ask ConstructChat about Zimbabwe - National Transport Sector Master Plan Study
Pick a question to edit it, or write your own.
First answer free · no account
Project Information FAQ
Project Information
Participants
Sponsoring Agency |
Status
Taiyo last update | 2026-07-22 |
Contact
| Not available for this record. |
Description
Description | The study of the national transport sector master plan was designed as part of the new national transport policy and consistent with Zimbabwe's medium-term plan and its socio-economic transformation agenda. This study aims to analyze the characteristics and specificities of transport demand generated by the envisaged national development, which includes natural resource development, community access, regional and national connectivity, and scenario projections. the most plausible for the next twenty years. The study includes: a) consultancy services for the development of the master plan and audit activities, as well as b) support and coordination of the study. The total estimated cost of this study is UA 0.97 million. It is co-financed by ADF with a grant of UA 0.88 million (90% of the total allocation) and counterpart funding of UA 0.09 million (10% of the total). by the Government of Zimbabwe (GoZ). The outcome of the intervention will lay the foundation for sustainable development of the transport sector to boost economic growth and reduce poverty. It will be implemented over a period of 28 months. |
Original sector | Transport & Storage |
Budget |
Location
Country | Zimbabwe |
Source
Source | African Development Bank (AfDB) |
URL |
More Details
Record type | Project |
Sector | Road, Government |
Article published date | 2025-12-15 |
Research
Free account
View all details
You are reading the public part. A free account opens the rest:
- Every detail on this project
- News and media coverage
- Technical research
Free account · no card · lands you back on this project
More Road projects in Zimbabwe
- Zimbabwe - Alaska – Karoi Power Transmission Reinforcement Project
- Limpopo Toll Bridge
- Harare - Beitbridge Road Link 4 (Turn Off to Beitbridge Border Post)
- Harare - Beitbridge Road Link 2 (Chivhu to Masvingo)
- Chirundu - Harare Road Link 3 (Karoi to Chinhoyi)
- Chirundu - Harare Road Link 4 (Chinhoyi to Harare)
- Harare - Beitbridge Road Link 3 (Masvingo to Turn Off)
- Chirundu - Harare Road Link 2 (Makuti to Karoi)