Zimbabwe - Railways Project I
One of 1,535 projects Taiyo tracks in Zimbabwe.
Source: African Development Bank (AfDB)
The Project is part of an investment Programme formulated in 1989 for the rehabilitation and modernization of the railways. The Programme will help to reduce the economic cost of rail transport in Zimbabwe and stem the cost of diversion of traffic from rail to road. It will help to relax the current transport constraint on production in sectors where road transport of inputs or outputs are not fea
- Sector
- Rail, Mass Transit, Road, Government
- Location
- Zimbabwe
- Updated
- 22 Jul 2026
- Source
- African Development Bank (AfDB)
ConstructChat
Ask ConstructChat about Zimbabwe - Railways Project I
Pick a question to edit it, or write your own.
First answer free · no account
Project Information FAQ
Project Information
Participants
Sponsoring Agency |
Status
Taiyo last update | 2026-07-22 |
Contact
| Not available for this record. |
Description
Description | The Project is part of an investment Programme formulated in 1989 for the rehabilitation and modernization of the railways. The Programme will help to reduce the economic cost of rail transport in Zimbabwe and stem the cost of diversion of traffic from rail to road. It will help to relax the current transport constraint on production in sectors where road transport of inputs or outputs are not feasible, improve the level of cost recovery in NRZ and reduce its claims on Government resources. The Project Outputs will be: (i) Replacement of Centralized Traffic Control (CTC) supervision equipment on the Harare-Mutare line including a flew telecommunications carrier; (ii) New passenger coaches (56 units); and iii) Portable radios for train crew communications (311 units). The estimated cost of the Project is UA 46.38 million net of taxes. |
Original sector | Transport & Storage |
Budget |
Location
Country | Zimbabwe |
Source
Source | African Development Bank (AfDB) |
URL |
More Details
Record type | Project |
Sector | Rail, Mass Transit, Road, Government |
Article published date | 2025-12-15 |
Research
Free account
View all details
You are reading the public part. A free account opens the rest:
- Every detail on this project
- News and media coverage
- Technical research
Free account · no card · lands you back on this project
More Rail projects in Zimbabwe
- Zimbabwe - Urgent Water Supply and Sanitation Rehabilitation Project - Phase 2
- Limpopo Toll Bridge
- Beitbridge - Bulawayo Railway
- Harare - Beitbridge Road Link 4 (Turn Off to Beitbridge Border Post)
- Harare - Beitbridge Road Link 2 (Chivhu to Masvingo)
- Chirundu - Harare Road Link 3 (Karoi to Chinhoyi)
- Chirundu - Harare Road Link 4 (Chinhoyi to Harare)
- Harare - Beitbridge Road Link 3 (Masvingo to Turn Off)
