Zimbabwe - Second Resettlement Project (ADF)
Sector: Water Supply and Storage • Location: Zimbabwe
Source: African Development Bank (AfDB)
The project falls within the Governments Intensive Resettlement Programme designed to meet needs of the war displaced people and to ease land pressure on heavily populated communal areas. The provision under the project aim at improving health and general well being of the settler population through resettlement activities. The project aims at settling 2979 families in an area covering about 107,0
- Sector
- Water Supply and Storage, Consumer Products, Government, Residential, Power Generation (CCGT), Automotive, Road, Raw Materials, Commercial
- Location
- Zimbabwe
- Updated
- 22 Jul 2026
- Source
- African Development Bank (AfDB)
ConstructChat
Ask ConstructChat about Zimbabwe - Second Resettlement Project (ADF)
Pick a question to edit it, or write your own.
First answer free · no account
Project Information FAQ
Project Information
Participants
Sponsoring Agency |
Status
Taiyo last update | 2026-07-22 |
Contact
| Not available for this record. |
Description
Description | The project falls within the Governments Intensive Resettlement Programme designed to meet needs of the war displaced people and to ease land pressure on heavily populated communal areas. The provision under the project aim at improving health and general well being of the settler population through resettlement activities. The project aims at settling 2979 families in an area covering about 107,000 ha. The families will be resettled in 93 villages each with about 32 households. The total area for agricultural development will increase to about 8360 ha at full development. Crops to be grown will include maize, sunflower, beans, groundnuts, cotton, wheat, soya beans, oriental tobacco, vegetables and sorghum. Most of the remaining area (about 99,000 ha) will be used for livestock. The total number of livestock it estimated to increase to 6548 and these will be used for draught-power, meat and milk production. The project will provide the necessary agricultural support (land development, credit, extension, dips, woodlot plantation, irrigation development and management); social infrastructure: Rural Service Centres (RSC) with clinics and co-operative storage depots classrooms, roads and water supply points for each village. The project will also provide office, vehicles and housing for staff in five RSCs and will be implemented over a five-year period. |
Original sector | Agriculture, Forestry, Fishing |
Budget |
Location
Country | Zimbabwe |
Source
Source | African Development Bank (AfDB) |
URL |
More Details
Record type | Project |
Sector | Water Supply and Storage, Consumer Products, Government, Residential, Power Generation (CCGT), Automotive, Road, Raw Materials, Commercial |
Article published date | 2026-03-01 |
Research
Free account
View all details
You are reading the public part. A free account opens the rest:
- Every detail on this project
- News and media coverage
- Technical research
Free account · no card · lands you back on this project
More Water Supply and Storage projects in Zimbabwe
- Pomona Waste Management
- Zimbabwe - Urgent Water Supply and Sanitation Rehabilitation Project - Phase 2
- Zimbabwe - ZIM-FUND - Emergency Power Infrastructure Rehabilitation Project – Consolidation Works
- HARARE WATER SUPPLY
- Zimbabwe - Emergency Power Infrastructure Rehabilitation Project – Phase II
- Zimbabwe - Urgent Water Supply and Sanitation Rehabilitation Project – Consolidation Works
- HARARE SEWERAGE PROJECT
- Batoka Gorge Hydro Electric Power Scheme
