Zimbabwe - Telecommunication II
Sector: Residential • Location: Zimbabwe
Source: African Development Bank (AfDB)
The proposed project is an integral part of the Telecommunications Sector Investment Program (TSIP), which aims to ensure optimal use of installed capacity; increase network efficiency; improve service quality; reduce the number of potential subscribers on waiting lists by equipping the project area with 30,000 pairs of main distributors (MDF); and assist the PTC in achieving the objectives of the
- Sector
- Residential, Commercial, Telecommunications, Government
- Location
- Zimbabwe
- Updated
- 22 Jul 2026
- Source
- African Development Bank (AfDB)
ConstructChat
Ask ConstructChat about Zimbabwe - Telecommunication II
Pick a question to edit it, or write your own.
First answer free · no account
Project Information FAQ
Project Information
Participants
Sponsoring Agency |
Status
Taiyo last update | 2026-07-22 |
Contact
| Not available for this record. |
Description
Description | The proposed project is an integral part of the Telecommunications Sector Investment Program (TSIP), which aims to ensure optimal use of installed capacity; increase network efficiency; improve service quality; reduce the number of potential subscribers on waiting lists by equipping the project area with 30,000 pairs of main distributors (MDF); and assist the PTC in achieving the objectives of the TSIP. The TSIP for the period 1992-1997 was prepared by the PTC as part of the Structural and Economic Adjustment Programme (ESAP), with a view to rehabilitating and developing the national telecommunications network. The project will provide the TPC with 248,000 line protection units, 131,200 km of cable pairs, a digital microwave system, a cellular radio link network, a frequency management system and a sound distribution network, in order to increase the efficiency of the national network and further reduce costs incurred by the Government and commercial and residential subscribers. The total cost of the project is estimated at UA 52.64 million. |
Original sector | Communications |
Budget |
Location
Country | Zimbabwe |
Source
Source | African Development Bank (AfDB) |
URL |
More Details
Record type | Project |
Sector | Residential, Commercial, Telecommunications, Government |
Article published date | 2025-12-15 |
Research
Free account
View all details
You are reading the public part. A free account opens the rest:
- Every detail on this project
- News and media coverage
- Technical research
Free account · no card · lands you back on this project
More Residential projects in Zimbabwe
- Zimbabwe - Alaska – Karoi Power Transmission Reinforcement Project
- Batoka Gorge Hydro Electric Power Scheme
- MATTER Career Readiness Institute / Joel Daniel Pringle + Architectural & Planning Studio
- Zimbabwe - Tax and Accountability Enhancement Project (TAEP)
- Zimbabwe - Mid-Zambezi Valley Rural Development project
- Zimbabwe - Support for Arrears Clearance and Governance Enhancement
- Institutional Capacity Development to Zimbabwe Aid and Debt Management Office (ZADMO)
- Rainwater Harvesting Jar Tanks in Mabale Community
