logo
Project

Zimbabwe - Telecommunication II

One of 1,535 projects Taiyo tracks in Zimbabwe.

Source: African Development Bank (AfDB)

The proposed project is an integral part of the Telecommunications Sector Investment Program (TSIP), which aims to ensure optimal use of installed capacity; increase network efficiency; improve service quality; reduce the number of potential subscribers on waiting lists by equipping the project area with 30,000 pairs of main distributors (MDF); and assist the PTC in achieving the objectives of the

Sector
Government, Telecommunications, Residential, Commercial
Location
Zimbabwe
Updated
22 Jul 2026
Source
African Development Bank (AfDB)

ConstructChat

Ask ConstructChat about Zimbabwe - Telecommunication II

Pick a question to edit it, or write your own.

First answer free · no account

I am a

Project Information FAQ

Project Information

4 Q
The project “Zimbabwe - Telecommunication II” is an infrastructure initiative in the Government sector, located in Zimbabwe. Taiyo aggregates data on it from African Development Bank (AfDB).

Participants

Sponsoring Agency

Status

Taiyo last update

2026-07-22

Contact

Not available for this record.

Description

Description

The proposed project is an integral part of the Telecommunications Sector Investment Program (TSIP), which aims to ensure optimal use of installed capacity; increase network efficiency; improve service quality; reduce the number of potential subscribers on waiting lists by equipping the project area with 30,000 pairs of main distributors (MDF); and assist the PTC in achieving the objectives of the TSIP. The TSIP for the period 1992-1997 was prepared by the PTC as part of the Structural and Economic Adjustment Programme (ESAP), with a view to rehabilitating and developing the national telecommunications network. The project will provide the TPC with 248,000 line protection units, 131,200 km of cable pairs, a digital microwave system, a cellular radio link network, a frequency management system and a sound distribution network, in order to increase the efficiency of the national network and further reduce costs incurred by the Government and commercial and residential subscribers. The total cost of the project is estimated at UA 52.64 million.

Original sector

Communications

Budget

Location

Country

Zimbabwe

Source

Source

African Development Bank (AfDB)

URL

More Details

Record type

Project

Sector

Government, Telecommunications, Residential, Commercial

Article published date

2026-03-01

More on this project

Research

Free account

View all details

You are reading the public part. A free account opens the rest:

  • Every detail on this project
  • News and media coverage
  • Technical research
View all details

Free account · no card · lands you back on this project