Zipaquira- Palenque (Bucaramanga) highway
Sector: Bridge • Location: Colombia
Source: World Bank Group
The Colombian consortium Union Temporal Concesion Vial Los Comuneros signed with the Colombian government a 10 year concession for the repair and operation of highway connecting Zipaquira to the Palenque bridge (by way of Bucaramanga) in December 2001. The consortium won the contract by presenting the lowest income from tolls - US$33.5 million. The concession is valid for a minimum six years and c
Project Information FAQ
Project Information
Want to explore the full details? View the full report
Participants
Sponsoring Agency | Obfuscated Data |
Company | Obfuscated Data |
Status
Original status | Concluded |
Taiyo status | Obfuscated Data |
Taiyo last update | 00-00-0000 |
Available timestamps | 00-00-0000 |
Available timestamp type | Obfuscated Data |
Contact
Contact name | Obfuscated Data |
Phone | 0000000000 |
ObfuscatedData@email.com | |
Address | Obfuscated Data, Obfuscated data, obfuscated data, Obfuscated data |
Description
Description | The Colombian consortium Union Temporal Concesion Vial Los Comuneros signed with the Colombian government a 10 year concession for the repair and operation of highway connecting Zipaquira to the Palenque bridge (by way of Bucaramanga) in December 2001. The consortium won the contract by presenting the lowest income from tolls - US$33.5 million. The concession is valid for a minimum six years and can be extended until the concessionaire recoups the US$33.5 million from tolls. The project reached financial closure in August 2002. The concession was expected to expired in July 2008. The 370 kilometer highway concession is the first part of the total upgrade fo the Zipaquira-Bucaramanga-Ye de Cienaga highway. This highway is expected to link Botota with the Carribean coast of Colombia. The remaining sections of the Bucaramanga-Ye de Cienaga project were expected to be offered in separate concessions. The consortium comprises Consorcio Vial de Cargagena SA, Alvarez y Collins SA, and Valores y Contratos SA. The estimated project cost was US$10.8 million of which the government contributed with around 10%. It was planned to be concessioned again in 2013. Draft tender documents are already available in July 2013: http://www.ani.gov.co/proceso-de-contratacion/contrato-de-concesion-app-corredor-zipaquira-bucaramanga-palenque-4020 http://www.inco.gov.co/concesiones/filtros/ficharesumen/frm_ficha_resumen.asp?concesion=221 |
Original sub-sector | Obfuscated |
Original Currency | USD |
Original budget | 000000000000000 |
Procurement method | Obfuscated Data |
Budget | 000000000000000 |
Location
Region | Obfuscated |
Country | Obfuscated |
State | Obfuscated Data |
County | Obfuscated |
Location | Obfuscated Data, Obfuscated data, obfuscated data, Obfuscated data |
Source
Source reliability | High |
Data quality score | 100% |
Source | Obfuscated Data |
URL | obfuscated_data,obfuscateddata.com |
More Details
Project Type | Obfuscated Data |
Article Published Date | Obfuscated Data |
