logo

Zojila Tunnel Project

Sector: Tunnel • Location: Sonamarg and Drass, Jammu and Kashmir and Ladakh, India

Source: The Hans India

Project
Under Construction

A horseshoe-shaped, single-tube, two-lane road tunnel is being constructed beneath the Zojila Pass, connecting Sonamarg in Ganderbal district of Jammu and Kashmir with Drass in Kargil district of Ladakh. The tunnel measures 9.5 metres in width, 7.57 metres in height, and 14.2 km in length, at an altitude of around 12,000 feet above sea level. It aims to provide all-weather, safe connectivity betwe

Project Information FAQ

Project Information

4 Q
The project “Zojila Tunnel Project” is an infrastructure initiative in the Tunnel sector, located in Sonamarg and Drass, Jammu and Kashmir and Ladakh, India. Taiyo aggregates data on it from The Hans India.

Want to explore the full details? View the full report

Participants

Sponsoring Agency

Obfuscated Data

Company

Obfuscated Data

Status

Original status

under construction

Taiyo status

Obfuscated Data

Taiyo last update

00-00-0000

Available timestamps

00-00-0000

Available timestamp type

Obfuscated Data

Contact

Contact name

Obfuscated Data

Phone

0000000000

Email

ObfuscatedData@email.com

Address

Obfuscated Data, Obfuscated data, obfuscated data, Obfuscated data

Description

Description

A horseshoe-shaped, single-tube, two-lane road tunnel is being constructed beneath the Zojila Pass, connecting Sonamarg in Ganderbal district of Jammu and Kashmir with Drass in Kargil district of Ladakh. The tunnel measures 9.5 metres in width, 7.57 metres in height, and 14.2 km in length, at an altitude of around 12,000 feet above sea level. It aims to provide all-weather, safe connectivity between Ladakh and the rest of the country, boost tourism and economy, and enhance logistics for the Indian Armed Forces. It is part of 31 road tunnels being constructed at a combined cost of Rs 1.4 lakh crore (approx. $17.5 billion). Upon completion, it will become the longest tunnel in Asia.

Original sub-sector

Obfuscated

Original Currency

USD

Original budget

000000000000000

Procurement method

Obfuscated Data

Budget

000000000000000

Location

Region

Obfuscated

Country

Obfuscated

State

Obfuscated Data

County

Obfuscated

Location

Obfuscated Data, Obfuscated data, obfuscated data, Obfuscated data

Source

Source reliability

High

Data quality score

100%

Source

Obfuscated Data

URL

obfuscated_data,obfuscateddata.com

More Details

Project Type

Obfuscated Data

Article Published Date

Obfuscated Data