logo

Zojila Tunnel Project

Sector: Road • Location: Between Ganderbal and Drass, Jammu and Kashmir and Ladakh, India

Source: The New Indian Express

Project
Under Construction

The Zojila Tunnel is a strategically important 13.150-kilometre-long highway tunnel, Asia's longest at high altitude, providing all-weather connectivity between Jammu and Kashmir and Ladakh. It is a 7.57-metre-high, horseshoe-shaped, single-tube, two-lane tunnel passing under the Zojila Pass in the Himalayas. The project aims to eliminate seasonal isolation of Ladakh caused by winter closure of th

Project Information FAQ

Project Information

5 Q
The project “Zojila Tunnel Project” is an infrastructure initiative in the Road sector, located in Between Ganderbal and Drass, Jammu and Kashmir and Ladakh, India. Taiyo aggregates data on it from The New Indian Express.

Want to explore the full details? View the full report

Participants

Sponsoring Agency

Obfuscated Data

Company

Obfuscated Data

Status

Original status

under construction

Taiyo status

Obfuscated Data

Taiyo last update

00-00-0000

Available timestamps

00-00-0000

Available timestamp type

Obfuscated Data

Contact

Contact name

Obfuscated Data

Phone

0000000000

Email

ObfuscatedData@email.com

Address

Obfuscated Data, Obfuscated data, obfuscated data, Obfuscated data

Description

Description

The Zojila Tunnel is a strategically important 13.150-kilometre-long highway tunnel, Asia's longest at high altitude, providing all-weather connectivity between Jammu and Kashmir and Ladakh. It is a 7.57-metre-high, horseshoe-shaped, single-tube, two-lane tunnel passing under the Zojila Pass in the Himalayas. The project aims to eliminate seasonal isolation of Ladakh caused by winter closure of the Zojila Pass, ensuring uninterrupted movement of civilian and military personnel and facilitating movement of heavy military hardware. The tunnel incorporates advanced safety and snow protection features and is expected to reduce travel time between Srinagar and Leh by about three-and-a-half hours.

Original sub-sector

Obfuscated

Original Currency

USD

Original budget

000000000000000

Procurement method

Obfuscated Data

Budget

000000000000000

Location

Region

Obfuscated

Country

Obfuscated

State

Obfuscated Data

County

Obfuscated

Location

Obfuscated Data, Obfuscated data, obfuscated data, Obfuscated data

Source

Source reliability

High

Data quality score

100%

Source

Obfuscated Data

URL

obfuscated_data,obfuscateddata.com

More Details

Project Type

Obfuscated Data

Article Published Date

Obfuscated Data