Zollinger Road Revamp Project
Sector: Road • Location: Upper Arlington, Ohio, United States
Source: The Columbus Dispatch
Upper Arlington plans to revamp Zollinger Road, a major collector street, with potential changes including lane reductions, addition of bike lanes, and streetlights installation between Tremont Road and Riverside Drive. The project aims to address speeding concerns and improve multi-modal transportation. Construction is expected to start in 2027, with over $3.3 million in federal grant funding sec
- Status
- Prospective
- Sector
- Road, Government
- Location
- Upper Arlington, Ohio, United States of America
- Updated
- 22 Jul 2026
- Source
- The Columbus Dispatch
ConstructChat
Ask ConstructChat about Zollinger Road Revamp Project
Pick a question to edit it, or write your own.
First answer free · no account
Project Information FAQ
Project Information
Participants
Sponsoring Agency |
Status
Original status | planned |
Taiyo status | Prospective |
Taiyo last update | 2026-07-22 |
Contact
| Not available for this record. |
Description
Description | Upper Arlington plans to revamp Zollinger Road, a major collector street, with potential changes including lane reductions, addition of bike lanes, and streetlights installation between Tremont Road and Riverside Drive. The project aims to address speeding concerns and improve multi-modal transportation. Construction is expected to start in 2027, with over $3.3 million in federal grant funding secured, requiring a 20% city match. |
Original sector | Transportation |
Budget |
Location
Country | United States of America (USA) |
State | Ohio |
City | Upper Arlington |
Source
Source | The Columbus Dispatch |
URL |
More Details
Record type | Project |
Sector | Road, Government |
Article published date | 2025-09-15 |
Research
Free account
View all details
You are reading the public part. A free account opens the rest:
- Every detail on this project
- News and media coverage
- Technical research
Free account · no card · lands you back on this project
