Zuni Sewer Main Rehabilitation
One of 10,000+ projects Taiyo tracks in New Mexico.
Source: Dodge USA
The scope of work for this project is listed in step-wise fashion below. Work must be completed in this order for minimal time where sewage flow will be restricted. Install five (5) angle iron braces at each of the five (5) main bridge supports though welded connections such that the braces are positioned directly under the existing 8 steel pipe. Install twenty-four (24) new pipe hangers, with fou
- Status
- Closed
- Sector
- Metal, Bridge, Government, Steel, Water Supply and Storage, Waste Processing and Treatment, Commercial
- Location
- Zuni, New Mexico, United States of America
- Updated
- 22 Jul 2026
- Source
- Dodge USA
ConstructChat
Ask ConstructChat about Zuni Sewer Main Rehabilitation
Pick a question to edit it, or write your own.
First answer free · no account
Project Information FAQ
Project Information
Participants
| Not available for this record. |
Status
Original status | closed |
Taiyo status | Closed |
Taiyo last update | 2026-07-22 |
Contact
| Not available for this record. |
Description
Description | The scope of work for this project is listed in step-wise fashion below. Work must be completed in this order for minimal time where sewage flow will be restricted. Install five (5) angle iron braces at each of the five (5) main bridge supports though welded connections such that the braces are positioned directly under the existing 8 steel pipe. Install twenty-four (24) new pipe hangers, with four (4) hangers located at intervals of 10 feet between each of the five (5) bridge supports and be... |
Procurement method | |
Budget |
Location
Country | United States of America (USA) |
State | New Mexico |
City | Zuni |
Source
Source | Dodge USA |
URL |
More Details
Record type | Project |
Sector | Metal, Bridge, Government, Steel, Water Supply and Storage, Waste Processing and Treatment, Commercial |
Article published date | 2024-10-08 |
Research
Free account
View all details
You are reading the public part. A free account opens the rest:
- Every detail on this project
- News and media coverage
- Technical research
Free account · no card · lands you back on this project
More Metal projects in United States of America
- STRUCTURAL STEEL FABRICATION AND ERECTION
- SR 7; SR 91 & SR 520 @ 4 LOCS - BRIDGE PRESERVATION
- SR 83 @ SHOAL CREEK
- Annenberg Science Complex - James M. Rosser Hall [027B-ASCR]
- ADD NEW PRE-FAB STEEL GARAGE 780SQ FT SHARES PLANS WITH 202104289 & 202104326
- NEW 3200 SF PREFAB METAL BUILDING CONSISTING OF A CUSTOMER INTERFACE, OFFICES, RESTROOM/BREAK ROOM, DISASSEMBLY & STOR.
- PHASED APPROVAL FOR 1) METAL FRAMING & SHEETROCK & 2) 3 UNDE R SLAB DRAINS. REFER TO MAIN PERMIT 202205223
- REPLACE DAMAGED STEEL COLUMN
