logo

ZUR3 Data Center / Gruner&Friends

Sector: Airport • Location: Switzerland

Source: ArchDaily

Project
Closed

Text description provided by the architects.The Data Center ZUR3 is designed and planned in an integrated BIM system for Digital Realty. The building is strategically located next to the Zurich Airport, connecting the existing Data Centers which are all important keystones for the expansion and future development of the new innovative campus. Adjacent to ZUR3, the 26,000 sqm mixed-use development

Project Information FAQ

Project Information

3 Q
The project “ZUR3 Data Center / Gruner&Friends” is an infrastructure initiative in the Airport sector, located in Switzerland. Taiyo aggregates data on it from ArchDaily.

Want to explore the full details? View the full report

Participants

Sponsoring Agency

Obfuscated Data

Company

Obfuscated Data

Status

Original status

closed

Taiyo status

Obfuscated Data

Taiyo last update

00-00-0000

Available timestamps

00-00-0000

Available timestamp type

Obfuscated Data

Contact

Contact name

Obfuscated Data

Phone

0000000000

Email

ObfuscatedData@email.com

Address

Obfuscated Data, Obfuscated data, obfuscated data, Obfuscated data

Description

Description

Text description provided by the architects.The Data Center ZUR3 is designed and planned in an integrated BIM system for Digital Realty. The building is strategically located next to the Zurich Airport, connecting the existing Data Centers which are all important keystones for the expansion and future development of the new innovative campus. Adjacent to ZUR3, the 26,000 sqm mixed-use development “Meet“ project, designed by the Japanese architect Sou Fujimoto, will house retail, recreational, and commercial/working spaces.The courtyard mirrors the design of the external panels, ensuring continuity with the exterior walls. The loading bays, bridge, and secondary exits are highlighted with black PPC aluminum panels, interrupting the silver facade. The reception entrance is designed to appear as if the facade is being cut and lifted, creating sheltered canopies and exposing the glass interior. Gruner&Friends led the design and construction of the building which with 31,000 m² of space is the largest data center in Switzerland to date. It includes 11,400 m² for customer use, all powered by 100% renewable energy. The project took 2.5 years, a relatively short time given its size and complex coordination. ZUR3 emphasizes security, sustainability, and renewable energy use.Inspired by the movie “Interstellar“ by Christopher Nolan, we have developed a new design typology for a Data Centre by re-studying the cladding design for such building type and covering it with a ‘data curtain’. The curtain itself is built upon layers that make the inner technical world visible to the outside with variant optical effects including lights, chromed facade elements, and curved stretched metal panels. We introduced a facade that presents a fourth-dimensional aspect to the building’s design by updating Interstellar’s classic bookshelf with a more contemporary manifestation by creating openings within the data curtain at certain locations, where the main entrance, staircases, and loading bays become visible.The facade was meticulously planned to reduce the visual impact of the 143m x 57m structure. Modular anodized aluminum panels, in six shapes and two chrome tones, create a curtain effect, countering the monolithic appearance. The panel perforations allow efficient cooling for the entire building, heavily heated by the transformers. The façade panels hang from a concealed aluminum substructure, creating a ventilated cavity that improves insulation. The building’s interior layout is also structured in a layering system organized through rings. This multi-layer security architecture makes ZUR3 one of the safest data centers in the world. The office workspace opens up around an inner courtyard that acts as a green oasis, endlessly extended by the courtyard’s mirror facade panels. The building is designed with a focus on sustainability, high-quality design, and construction. Therefore, the integral 3D BIM planning runs across all specialists and is implemented in construction at the highest speed and quality performance.

Original sub-sector

Obfuscated

Original Currency

USD

Original budget

000000000000000

Procurement method

Obfuscated Data

Budget

000000000000000

Location

Region

Obfuscated

Country

Obfuscated

State

Obfuscated Data

County

Obfuscated

Location

Obfuscated Data, Obfuscated data, obfuscated data, Obfuscated data

Source

Source reliability

High

Data quality score

100%

Source

Obfuscated Data

URL

obfuscated_data,obfuscateddata.com

More Details

Project Type

Obfuscated Data

Article Published Date

Obfuscated Data