Zurich Airport Runway 28 Extension
The owner, status and timeline of this project. A free account opens every field.
Source: Safari India
Extension of Runway 28 at Zurich Airport involving major earthworks, relocation of the Glatt River, and infrastructure modifications. The project aims to improve flight safety, operational reliability, and airport efficiency, with an estimated construction period of seven to eight years including preparatory work. The extension will provide longer braking distances for aircraft and support greater
- Status
- Prospective
- Sector
- Aerospace & Defense, Airport
- Location
- Zurich, Switzerland
- Updated
- 22 Jul 2026
- Source
- Safari India
ConstructChat
Ask ConstructChat about Zurich Airport Runway 28 Extension
Pick a question to edit it, or write your own.
First answer free · no account
Project Information FAQ
Project Information
Participants
| Not available for this record. |
Status
Original status | planned |
Taiyo status | Prospective |
Taiyo last update | 2026-07-22 |
Contact
| Not available for this record. |
Description
Description | Extension of Runway 28 at Zurich Airport involving major earthworks, relocation of the Glatt River, and infrastructure modifications. The project aims to improve flight safety, operational reliability, and airport efficiency, with an estimated construction period of seven to eight years including preparatory work. The extension will provide longer braking distances for aircraft and support greater operational stability. |
Original sector | Transportation |
Location
Country | Switzerland |
State | Zurich |
City | Zurich |
Source
Source | Safari India |
URL |
More Details
Record type | Project |
Sector | Aerospace & Defense, Airport |
Article published date | 2026-07-11 |
Research
Free account
View all details
You are reading the public part. A free account opens the rest:
- Every detail on this project
- News and media coverage
- Technical research
Free account · no card · lands you back on this project
More Aerospace & Defense projects in Switzerland
- Flood estimation in complex orographic area for risk mitigation in alpine space
- On the Tresa River: common emergency prevention and management
- New materials and solutions for vibration damping
- Integration of volatile cues and plant peptide signals for enhanced herbivore resistance in tomato
- EuroAirport Basel Mulhouse Freiburg (BSL)
- Automated super-resolution polarimetric nonlinear microscope 'PolarNon'
- AI-based autonomous flight control for the aircraft of today and electric VTOLs of tomorrow
- Pilot Eye Gaze and Gesture tracking for Avionics Systems using Unobtrusive Solutions
