004 Kiowa Bennett Road Reconstruction Design
Sector: Road • Location: Bennett, Colorado, United States of America
Source: Town of Bennett - Colorado
The total length of Town - owned Kiowa - Bennett Road is approximately 3 . 45 miles , excluding Interstate 70 bridge , ramp , and approaches . The Town length of Kiowa - Bennett Road features 85 percent two - lane roadway , with some auxiliary lanes present to serve the Town ’ s Antelope Hills Subdivision development
- Status
- Closed
- Sector
- Road, Bridge
- Location
- Bennett, Colorado, United States of America
- Updated
- 3 Nov 2026
- Source
- Town of Bennett - Colorado
ConstructChat
Ask ConstructChat about 004 Kiowa Bennett Road Reconstruction Design
Pick a question to edit it, or write your own.
First answer free · no account
Tender Information FAQ
Tender Information
Participants
| Not available for this record. |
Status
Original status | open |
Taiyo status | Closed |
Taiyo last update | 2026-11-03 |
Contact
| Not available for this record. |
Description
Description | The total length of Town - owned Kiowa - Bennett Road is approximately 3 . 45 miles , excluding Interstate 70 bridge , ramp , and approaches . The Town length of Kiowa - Bennett Road features 85 percent two - lane roadway , with some auxiliary lanes present to serve the Town ’ s Antelope Hills Subdivision development . The Kiowa - Bennett Road roadway structure sees significant traffic loading , including freight , and is showing distress via lateral and longitudinal cracking , rutting , edge ravelling , heaving and settlement areas through 28 years of Town ownership and maintenance . This reconstruction project is intended to improve the roadway condition for smoothness , pavement and shoulder integrity and strength , visibility , and safety . This Project is locally funded by the Town of Bennett . All work is confined to Town - owned right - of - way . No CDOT or County - owned facilities are included . No right - of - way acquisition is required . Lane configurations for this reconstruction are expected to remain the same as current conditions . The intent is to develop complete , bid - ready construction documents . Construction phase services will be procured under a separate contract and are not included in this RFP nor required for this proposal . See more |
Location
Country | United States of America (USA) |
State | Colorado |
City | Bennett |
Source
Source | Town of Bennett - Colorado |
URL |
More Details
Record type | Tender |
Sector | Road, Bridge |
Article published date | 2026-02-26 |
Research
Free account
View all details
You are reading the public part. A free account opens the rest:
- Every detail on this tender
- News and media coverage
- Technical research
Free account · no card · lands you back on this tender
More Road tenders in United States of America
- RFP - Pro-Tem Hearing Examiner
- NEW TIRES RETREADS AND TIRE SERVICES
- Professional Construction Engineering and Inspection CEI Services for the Williamson Boulevard Widening
- Lincoln Avenue Wascher to Killarney Preliminary Engineering Section 220065800PV
- KilleenFort Hood Regional Airport KFHRA Terminal Apron Rehabilitation Phase II
- IFB 947902022JM Screening 10 Asphalt Filter Stone 8 Granite Double Washed
- IFB 914202022AM Street Sweeper Parts and Brooms
- IFB 843402021AB Hay Alfalfa and Wheat Straw for Norfolk Zoo
