0358 Nursery Bridge Structural Bearing Replacement Scheme 2026
One of 10,000+ tenders Taiyo tracks in United Kingdom.
Source: Find a Tender Service (UK)
Nursery Bridge is a single span simply supported steel composite structure, which carries Atherleigh Way (A579), over Pennington Brook, in Leigh. The deck consists of a reinforced concrete deck slab, which is composite with 11 914x419x343 UB’s, spaced at 1.350m centres. The steel beams are supported on bearings and reinforced concrete plinths, on top of brick faced, reinforced concrete full height
- Status
- Bidding
- Sector
- Bridge, Water Supply and Storage, Cement, Hydro, Steel, Road, Power Generation (CCGT)
- Location
- United Kingdom
- Updated
- 3 Nov 2026
- Source
- Find a Tender Service (UK)
ConstructChat
Ask ConstructChat about 0358 Nursery Bridge Structural Bearing Replacement Scheme 2026
Pick a question to edit it, or write your own.
First answer free · no account
Tender Information FAQ
Tender Information
Participants
| Not available for this record. |
Status
Original status | active |
Taiyo status | Bidding |
Taiyo last update | 2026-11-03 |
Contact
| Not available for this record. |
Description
Description | Nursery Bridge is a single span simply supported steel composite structure, which carries Atherleigh Way (A579), over Pennington Brook, in Leigh. The deck consists of a reinforced concrete deck slab, which is composite with 11 914x419x343 UB’s, spaced at 1.350m centres. The steel beams are supported on bearings and reinforced concrete plinths, on top of brick faced, reinforced concrete full height abutments. The bearings at the north end of the structure are rocker bearings which are to be replaced under this contract. Records suggest there is an existing United Utilities 160mm mains water supply pipe in the East verge and a 33kV electricity northwest cable in the west verge and northbound carriageway although this is noted to be out of commission. The reconstruction works briefly comprise: - Excavation to topsoil above abutment toe - Sequenced propping of the structure during overnight road closure - Hydro-demolition of existing bearing plinths - Re-casting of bearing plinths - Installation of new bearings - Installation of new asphaltic plug joint - Installation and removal of traffic management The Contractor to provide all necessary transport, tools, access equipment, appropriate welfare, water disposal and clearance on completion in order to carry out the works effectively. We require full risk assessments and method statements (RAMS) before commencement. The sites will be under control of CDM 2015. |
Budget |
Location
Country | United Kingdom (UK) |
Source
Source | Find a Tender Service (UK) |
URL |
More Details
Record type | Tender |
Sector | Bridge, Water Supply and Storage, Cement, Hydro, Steel, Road, Power Generation (CCGT) |
Article published date | 2026-09-21 |
Research
Free account
View all details
You are reading the public part. A free account opens the rest:
- Every detail on this tender
- News and media coverage
- Technical research
Free account · no card · lands you back on this tender
More Bridge tenders in United Kingdom
- Customer Information Screens (CIS) LOT 4 SQIP
- Customer Information Screens (CIS) LOT 4 SQIP
- Mansafe System Installation
- Film Scanner and Digitisation System
- Customer Relationship Management (CRM) Solution
- Community Pain Management Service
- Preliminary Market Engagement - ERP System
- Gomeldon Recreation Ground project
