logo

0358 Nursery Bridge Structural Bearing Replacement Scheme 2026

Active · United Kingdom

Source: Open Contracting Data Standard (OCDS)

Tender
Active

Nursery Bridge is a single span simply supported steel composite structure, which carries Atherleigh Way (A579), over Pennington Brook, in Leigh. The deck consists of a reinforced concrete deck slab, which is composite with 11 914x419x343 UB’s, spaced at 1.350m centres. The steel beams are supported on bearings and reinforced concrete plinths, on top of brick faced, reinforced concrete full height

Status
Bidding
Sector
Bridge, Hydro, Steel, Power Generation (CCGT), Water Supply and Storage, Cement, Road
Location
United Kingdom
Updated
3 Nov 2026
Source
Open Contracting Data Standard (OCDS)

ConstructChat

Ask ConstructChat about 0358 Nursery Bridge Structural Bearing Replacement Scheme 2026

Pick a question to edit it, or write your own.

First answer free · no account

I am a

Tender Information FAQ

Tender Information

3 Q
The tender “0358 Nursery Bridge Structural Bearing Replacement Scheme 2026” is a tender record in Taiyo, linked to the Bridge sector. It is issued for works, goods, or services related to United Kingdom.

Participants

Not available for this record.

Status

Original status

active

Taiyo status

Bidding

Taiyo last update

2026-11-03

Contact

Not available for this record.

Description

Description

Nursery Bridge is a single span simply supported steel composite structure, which carries Atherleigh Way (A579), over Pennington Brook, in Leigh. The deck consists of a reinforced concrete deck slab, which is composite with 11 914x419x343 UB’s, spaced at 1.350m centres. The steel beams are supported on bearings and reinforced concrete plinths, on top of brick faced, reinforced concrete full height abutments. The bearings at the north end of the structure are rocker bearings which are to be replaced under this contract. Records suggest there is an existing United Utilities 160mm mains water supply pipe in the East verge and a 33kV electricity northwest cable in the west verge and northbound carriageway although this is noted to be out of commission. The reconstruction works briefly comprise: - Excavation to topsoil above abutment toe - Sequenced propping of the structure during overnight road closure - Hydro-demolition of existing bearing plinths - Re-casting of bearing plinths - Installation of new bearings - Installation of new asphaltic plug joint - Installation and removal of traffic management The Contractor to provide all necessary transport, tools, access equipment, appropriate welfare, water disposal and clearance on completion in order to carry out the works effectively. We require full risk assessments and method statements (RAMS) before commencement. The sites will be under control of CDM 2015.

Location

Country

United Kingdom (UK)

Source

Source

Open Contracting Data Standard (OCDS)

URL

More Details

Record type

Tender

Sector

Bridge, Hydro, Steel, Power Generation (CCGT), Water Supply and Storage, Cement, Road

Article published date

2026-09-02

More on this tender

Research

Free account

View all details

You are reading the public part. A free account opens the rest:

  • Every detail on this tender
  • News and media coverage
  • Technical research
View all details

Free account · no card · lands you back on this tender