10 OFFICE CUBICLES
Sector: Mass Transit • Location: Nebraska, United States of America
Source: Nebraska Purchasing Group
Workstation System Requirements • Provide a total of ten ( 10 ) modular office cubicle workstations configured by Metro ’ s floor plan and installation layout . • Include a modular wall system that defines and separates individual workspaces , allowing both privacy and visual continuity . • All workstation components must
- Status
- Closed
- Sector
- Mass Transit, Commercial, Residential
- Location
- Nebraska, United States of America
- Updated
- 3 Nov 2026
- Source
- Nebraska Purchasing Group
ConstructChat
Ask ConstructChat about 10 OFFICE CUBICLES
Pick a question to edit it, or write your own.
First answer free · no account
Tender Information FAQ
Tender Information
Participants
| Not available for this record. |
Status
Original status | closed |
Taiyo status | Closed |
Taiyo last update | 2026-11-03 |
Contact
| Not available for this record. |
Description
Description | Workstation System Requirements • Provide a total of ten ( 10 ) modular office cubicle workstations configured by Metro ’ s floor plan and installation layout . • Include a modular wall system that defines and separates individual workspaces , allowing both privacy and visual continuity . • All workstation components must be interchangeable and compatible with future modifications , expansions , or reconfigurations without requiring major reconstruction . • All systems and materials must comply with applicable local , state , and federal regulations , including ADA accessibility standards , OSHA requirements , and fire and electrical safety codes . • Each workstation shall incorporate integrated electrical and data routing through internal wall cavities , raceways , or base channels to provide safe , concealed connectivity . • Electrical and data provisions must allow for future technology upgrades and support current Metro IT standards for network integration . • Visible surfaces of walls and worksurfaces should be neutral grey , blue grey , or grey stone coloring . Installation Requirements • Install six ( 6 ) cubicles on the main floor and four ( 4 ) cubicles on the lower level . • Provide all labor , materials , mounting hardware , fasteners , and structural supports necessary for a complete and stable installation . • Ensure that all electrical and data systems are fully connected , tested , and verified operational before the project closes out . • Always maintain a clean and safe work environment , with minimal disruption to Metro operations during installation activities . • Coordinate with Metro ’ s facility management staff for site access , scheduling , and staging to avoid interference with normal business operations • Minimize disruption to Metro operations during installation . • Perform a final walk - through with Metro representatives to verify compliance , functionality , and workmanship before acceptance . |
Location
Country | United States of America (USA) |
State | Nebraska |
Source
Source | Nebraska Purchasing Group |
URL |
More Details
Record type | Tender |
Sector | Mass Transit, Commercial, Residential |
Article published date | 2026-04-29 |
Research
Free account
View all details
You are reading the public part. A free account opens the rest:
- Every detail on this tender
- News and media coverage
- Technical research
Free account · no card · lands you back on this tender
More Mass Transit tenders in United States of America
- Regional Parks Fire Fuel Reduction Work
- Van Ness Avenue Auxiliary Water Supply System Upgredes
- RFQ for Biosolids Digester Facilities - Southeast Treatment ...
- Request/Notice for Qualifications for Biosolids Digester Fac...
- REJECTED: Bay Corridor Transmission and Distribution - Phase...
- Mission Street, 16th to Cesar Chavez, Brick Sewer Rehabilita...
- Green Infrastructure (Bio Retention) on The Van Ness Improve...
- 8-Inch DIP and 12-Inch ERDIP Water Main Installation on 22nd...
