logo

104 BUILDING BOILER REPLACEMENTS

The scope, dates and status of this tender. A free account opens every field.

Source: MITN Purchasing Group

Tender
Closed

1 . Contractor shall remove and dispose of one ( 1 ) Mod Con 399 , 000 BTU boiler and one ( 1 ) Munchkin 399 , 000 BTU boiler . Currently these boilers have been valved and isolated from the variable primary piping system . 2 . Contractor shall install two ( 2 ) 399 , 000 BTU Viessman Vitocrossal 200 CI2 floor st

Status
Closed
Sector
Water Supply and Storage, Chemical (Industrial), Manufacturing (Industrial), Commercial
Location
MITN, United States of America
Updated
3 Nov 2026
Source
MITN Purchasing Group

ConstructChat

Ask ConstructChat about 104 BUILDING BOILER REPLACEMENTS

Pick a question to edit it, or write your own.

First answer free · no account

I am a

Tender Information FAQ

Tender Information

3 Q
The tender “104 BUILDING BOILER REPLACEMENTS” is a tender record in Taiyo, linked to the Water Supply and Storage sector. It is issued for works, goods, or services related to MITN, United States of America.

Participants

Not available for this record.

Status

Original status

closed

Taiyo status

Closed

Taiyo last update

2026-11-03

Contact

Not available for this record.

Description

Description

1 . Contractor shall remove and dispose of one ( 1 ) Mod Con 399 , 000 BTU boiler and one ( 1 ) Munchkin 399 , 000 BTU boiler . Currently these boilers have been valved and isolated from the variable primary piping system . 2 . Contractor shall install two ( 2 ) 399 , 000 BTU Viessman Vitocrossal 200 CI2 floor standing condensing boilers or equivalent . Include an ECM boiler circulator for each boiler . 3 . Contractor to reuse existing 4 ” PVC for combustion and exhaust air . 4 . Contractor to reuse the existing header and air separator , and install the necessary valving to isolate each individual boiler . 5 . Contractor to install a floor mounted chemical pot feeder for chemical additions as needed . 6 . Contractor to install low water cut - offs in accordance with manufacturer specifications . 2 7 . Contractor to install an emergency stop switch at the Boiler Room entrance . 8 . Contractor to include outside air temperature transmitters to enable and modulate boilers . 9 . Contractor to include magnetic filters for both boilers on the inlet side . 10 . Contractor to install a CO monitor in the Boiler Room .

Location

Country

United States of America (USA)

State

MITN

Source

Source

MITN Purchasing Group

URL

More Details

Record type

Tender

Sector

Water Supply and Storage, Chemical (Industrial), Manufacturing (Industrial), Commercial

Article published date

2026-04-29

More on this tender

Research

Free account

View all details

You are reading the public part. A free account opens the rest:

  • Every detail on this tender
  • News and media coverage
  • Technical research
View all details

Free account · no card · lands you back on this tender