1082635 - DK WATER SOFTENER - SPECS
One of 10,000+ tenders Taiyo tracks in California.
Source: California Purchasing Group
The County of Los Angeles is looking for a company that can provide the complete installation , decommissioning , and removal of a new dual ( 2 ) softeners system within Dorothy Kirby ’ s Boiler plant . It is essential to meet or exceed the facilities demand and current softener system capacity . This will be
- Status
- Closed
- Sector
- Water Supply and Storage, Power Generation (CCGT), Manufacturing (Industrial), Cement
- Location
- California, United States of America
- Updated
- 3 Nov 2026
- Source
- California Purchasing Group
ConstructChat
Ask ConstructChat about 1082635 - DK WATER SOFTENER - SPECS
Pick a question to edit it, or write your own.
First answer free · no account
Tender Information FAQ
Tender Information
Participants
| Not available for this record. |
Status
Original status | closed |
Taiyo status | Closed |
Taiyo last update | 2026-11-03 |
Contact
| Not available for this record. |
Description
Description | The County of Los Angeles is looking for a company that can provide the complete installation , decommissioning , and removal of a new dual ( 2 ) softeners system within Dorothy Kirby ’ s Boiler plant . It is essential to meet or exceed the facilities demand and current softener system capacity . This will be a turnkey project and requires the awarded bidder to have licensed personnel , experience , resources with the ability to procure , deliver , install , and set up softeners in its entirety for a completed project . After completing the project , the company must have the resources to remove and haul away all parts , material , equipment , and recycle waste according to local policies . TASKS : Awarded Contractor shall be responsible for the following tasks The Awarded Contractor shall be responsible for the procurement , removal , installation , and transportation of all parts . All materials , labor , work verification , and testing of equipment necessary for a completed project . Providing equipment to and from work locations and transportation for the removal , haul , and disposal of the existing softeners and their respective equipment . Suitable transportation for the job and providing safe handling of equipment . I 1 . INSTALLATION / LABOR : The Awarded Contractor shall perform and be responsible for the following task : New system pipping connections will begin and end at existing isolation valves . Dual Softener System and Brine Tank a . Provide Electrical Warning signs , Caution signs , Barriers , Gates , and any additional safety equipment b . Delivery , rigging , and setting up new equipment onto its predetermined location . As needed , leveling equipment utilizing high strength permanent parts c . Anchoring and securing ALL new equipment . This includes but not limited to , cable installation , concrete core drilling , adding junction boxes , cables and conduit d . Provide any cranes services , forklifts , or any required equipment necessary to safely set the new equipment onto its predetermined location e . Using a licensed electrician , the awarded bidder must also provide power to the equipment utilizing the 120 Volt Power sources provided for system and controls . After completing the project , the company must have the resources to decommission , disconnect and remove all rental equipment . f . Once installation is complete , perform an initial startup test and ensure all new equipment works according to the manufacture ’ s recommendations , and verify the new equipment meets the operational requirements of the facility g . The Awarded Contractor shall grant a one - year warranty from the date of work completion . The warranty shall cover any defective parts and workmanship and shall be repaired or replaced within 30 days at no additional cost to the County . 2 . MATERIAL / EQUIPMENT : All parts and equipment must be new . New would be defined as a product that has never been used or previously owned . Equipment and parts must be easily accessible and allow for the County to procure parts from various vendors as needed . N ( O sole source products or parts will be accepted on this proposal . New installations must be installed using the existing utilities e . g ., power supply ( 120 VAC / 10 Amps ), and drains . B . Control Valve ( 2 ) Control value will be rated with the following specifications : • Cycles up to 9 • Inlet / Outlet 2 ” Female NPT • Valve Material Lead free brass • Regeneration Downflow • Service at 15 psi 1 bar drop includes meter 165 gpm • Backwash at 25 psi 1 . 7 bar drop 175 gpm • Epoxy coated brass body • Fully programable regeneration cycles • Programable system single , alternating progressive flow • Day override feature 7 day • Diagnostic and historical viewing • Supply Voltage 120 VAC • Supply frequency 60 Hz • Minimum temperature 40 deg F • Maximum temperature 110 deg F |
Location
Country | United States of America (USA) |
State | California |
Source
Source | California Purchasing Group |
URL |
More Details
Record type | Tender |
Sector | Water Supply and Storage, Power Generation (CCGT), Manufacturing (Industrial), Cement |
Article published date | 2026-05-10 |
Research
Free account
View all details
You are reading the public part. A free account opens the rest:
- Every detail on this tender
- News and media coverage
- Technical research
Free account · no card · lands you back on this tender
More Water Supply and Storage tenders in United States of America
- RFP - Thurston County Lake Management Districts Submerged Aquatic Vegetation Control
- Coatings for Wet Well and Manholes
- Sole Source for Wedeco UV BulbsBallets
- Security Hardware Services
- Chambers Creek Regional Wastewater Treatment Plant BNR Aeration Basin Airflow Meters
- Se Dixie Highway County Road A1A Utility Relocation Project
- UNPAINTED SNOW FENCE AND DUNE GRASS NO II
- PreQualification of Bidders for Chaboya Improvements
