1383 E Washington – Demo
The scope, dates and status of this tender. A free account opens every field.
Source: MITN Purchasing Group
Demolition of Structure : The Scope of Work (“ Work ”) for this RFP may include , but is not necessarily limited to : a . Security : Provide site security for duration of project after notice to proceed is received . b . Mobilization : Includes all labor , equipment , materials , and incidentals to mobilize to the pro
- Status
- Closed
- Sector
- Road, Water Supply and Storage, Energy Storage, Power Transmission, Waste Processing and Treatment, Power Generation (CCGT), Car parking, Commercial, Cement, Automotive, Residential
- Location
- MITN, United States of America
- Updated
- 3 Nov 2026
- Source
- MITN Purchasing Group
ConstructChat
Ask ConstructChat about 1383 E Washington – Demo
Pick a question to edit it, or write your own.
First answer free · no account
Tender Information FAQ
Tender Information
Participants
| Not available for this record. |
Status
Original status | closed |
Taiyo status | Closed |
Taiyo last update | 2026-11-03 |
Contact
| Not available for this record. |
Description
Description | Demolition of Structure : The Scope of Work (“ Work ”) for this RFP may include , but is not necessarily limited to : a . Security : Provide site security for duration of project after notice to proceed is received . b . Mobilization : Includes all labor , equipment , materials , and incidentals to mobilize to the project site to perform the work . It includes all supervision of successful Respondent ’ s personnel , and office support . It includes project meetings , surveying , site security , temporary controls and utilities , pre - work submittals , preparation of all submittals including , the successful Respondent ’ s Site - Specific Work Plan and Health and Safety Plan ( HASP ), personal protective equipment , permits , disposal approvals , erosion controls , barricades , traffic control , trash disposal , cleaning , and demobilization . c . Utilities : The successful Respondent will be responsible for confirming the status of all utilities and to have all utilities cut and removed from the site as required by regulation , local ordinance or , at a minimum , generally accepted methods . This may include well capping and proper closure of any on - site sewer systems or drainage systems as found by successful Respondent . d . Universal Waste : Include all labor , equipment , materials , and incidentals , transportation and disposal fees needed to manage Universal Waste and its disposal prior to demolition . Universal wastes include , but are not limited to , bulbs ; ballasts ; batteries ; mercury containing / equipment ; and electronic equipment . The Pre - demolition survey reports in Attachment C , identified all materials found on site . All must be addressed as part of abatement . e . Clearances : Coordinate visual and / or air clearance examinations through the LCLBA and their environmental consultant . Any costs for failed examinations shall be deducted from the final payment to the successful Respondent ’ s final invoice . f . Demolition : Includes all labor , equipment , materials , fees , permits and incidentals needed : to demolish building , flatwork , and below grade structures associated with the building ( including basement , foundations , footings , sumps , pits , vaults etc .); transportation and disposal of all demolition debris ; removal of all concrete and asphalt drives and parking areas on site ; and utility disconnects , removal , abandonment , or protection of buried underground utilities ( including public underground sprinkling systems ) as specified . Use of explosives is strictly prohibited . Do not burn demolished materials . Except for items or materials indicated to be reused , salvaged , or otherwise indicated to remain property of LCLBA , demolished materials shall become the successful Respondent ' s property and shall be removed , recycled , or disposed from Project site in an appropriate and legal manner . Successful Respondent will be required to provide water , application equipment and personnel for dust suppression during demolition activities . g . Site Restoration : Site restoration shall include general backfilling , leveling and compaction and the installation of topsoil , grass seed and straw . Procedures , methods , materials , and other information regarding excavation and backfill shall be included in the Project Work Plan developed by the successful Respondent . |
Location
Country | United States of America (USA) |
State | MITN |
Source
Source | MITN Purchasing Group |
URL |
More Details
Record type | Tender |
Sector | Road, Water Supply and Storage, Energy Storage, Power Transmission, Waste Processing and Treatment, Power Generation (CCGT), Car parking, Commercial, Cement, Automotive, Residential |
Article published date | 2026-04-29 |
Research
Free account
View all details
You are reading the public part. A free account opens the rest:
- Every detail on this tender
- News and media coverage
- Technical research
Free account · no card · lands you back on this tender
More Road tenders in United States of America
- RFP - Pro-Tem Hearing Examiner
- NEW TIRES RETREADS AND TIRE SERVICES
- Professional Construction Engineering and Inspection CEI Services for the Williamson Boulevard Widening
- Lincoln Avenue Wascher to Killarney Preliminary Engineering Section 220065800PV
- KilleenFort Hood Regional Airport KFHRA Terminal Apron Rehabilitation Phase II
- IFB 947902022JM Screening 10 Asphalt Filter Stone 8 Granite Double Washed
- IFB 914202022AM Street Sweeper Parts and Brooms
- IFB 843402021AB Hay Alfalfa and Wheat Straw for Norfolk Zoo
