Demolition of Structure : The Scope of Work (“ Work ”) for this RFP may include , but is not necessarily limited to : a . Security : Provide site security for duration of project after notice to proceed is received . b . Mobilization : Includes all labor , equipment , materials , and incidentals to mobilize to the pro

Status
Closed
Sector
Road, Water Supply and Storage, Energy Storage, Power Transmission, Waste Processing and Treatment, Power Generation (CCGT), Car parking, Commercial, Cement, Automotive, Residential
Location
MITN, United States of America
Updated
3 Nov 2026
Source
MITN Purchasing Group

ConstructChat

Ask ConstructChat about 1383 E Washington – Demo

Pick a question to edit it, or write your own.

First answer free · no account

I am a

Tender Information FAQ

Tender Information

3 Q
The tender “1383 E Washington – Demo” is a tender record in Taiyo, linked to the Road sector. It is issued for works, goods, or services related to MITN, United States of America.

Participants

Not available for this record.

Status

Original status

closed

Taiyo status

Closed

Taiyo last update

2026-11-03

Contact

Not available for this record.

Description

Description

Demolition of Structure : The Scope of Work (“ Work ”) for this RFP may include , but is not necessarily limited to : a . Security : Provide site security for duration of project after notice to proceed is received . b . Mobilization : Includes all labor , equipment , materials , and incidentals to mobilize to the project site to perform the work . It includes all supervision of successful Respondent ’ s personnel , and office support . It includes project meetings , surveying , site security , temporary controls and utilities , pre - work submittals , preparation of all submittals including , the successful Respondent ’ s Site - Specific Work Plan and Health and Safety Plan ( HASP ), personal protective equipment , permits , disposal approvals , erosion controls , barricades , traffic control , trash disposal , cleaning , and demobilization . c . Utilities : The successful Respondent will be responsible for confirming the status of all utilities and to have all utilities cut and removed from the site as required by regulation , local ordinance or , at a minimum , generally accepted methods . This may include well capping and proper closure of any on - site sewer systems or drainage systems as found by successful Respondent . d . Universal Waste : Include all labor , equipment , materials , and incidentals , transportation and disposal fees needed to manage Universal Waste and its disposal prior to demolition . Universal wastes include , but are not limited to , bulbs ; ballasts ; batteries ; mercury containing / equipment ; and electronic equipment .  The Pre - demolition survey reports in Attachment C , identified all materials found on site . All must be addressed as part of abatement . e . Clearances : Coordinate visual and / or air clearance examinations through the LCLBA and their environmental consultant . Any costs for failed examinations shall be deducted from the final payment to the successful Respondent ’ s final invoice . f . Demolition : Includes all labor , equipment , materials , fees , permits and incidentals needed : to demolish building , flatwork , and below grade structures associated with the building ( including basement , foundations , footings , sumps , pits , vaults etc .); transportation and disposal of all demolition debris ; removal of all concrete and asphalt drives and parking areas on site ; and utility disconnects , removal , abandonment , or protection of buried underground utilities ( including public underground sprinkling systems ) as specified . Use of explosives is strictly prohibited . Do not burn demolished materials . Except for items or materials indicated to be reused , salvaged , or otherwise indicated to remain property of LCLBA , demolished materials shall become the successful Respondent ' s property and shall be removed , recycled , or disposed from Project site in an appropriate and legal manner . Successful Respondent will be required to provide water , application equipment and personnel for dust suppression during demolition activities . g . Site Restoration : Site restoration shall include general backfilling , leveling and compaction and the installation of topsoil , grass seed and straw . Procedures , methods , materials , and other information regarding excavation and backfill shall be included in the Project Work Plan developed by the successful Respondent .

Location

Country

United States of America (USA)

State

MITN

Source

Source

MITN Purchasing Group

URL

More Details

Record type

Tender

Sector

Road, Water Supply and Storage, Energy Storage, Power Transmission, Waste Processing and Treatment, Power Generation (CCGT), Car parking, Commercial, Cement, Automotive, Residential

Article published date

2026-04-29

More on this tender

Research

Free account

View all details

You are reading the public part. A free account opens the rest:

  • Every detail on this tender
  • News and media coverage
  • Technical research
View all details

Free account · no card · lands you back on this tender