1395 E Washington – Demo & Abatement
Closed · MITN · Last reported Feb 2026
Source: MITN Purchasing Group
a . Security : Provide site security for duration of project after notice to proceed is received . b . Mobilization : Includes all labor , equipment , materials , and incidentals to mobilize to the project site to perform the work . It includes all supervision of successful Respondent ’ s personnel , and office support .
- Status
- Closed
- Sector
- Water Supply and Storage, Energy Storage, Waste Processing and Treatment, Commercial, Residential
- Location
- MITN, United States of America
- Updated
- 3 Nov 2026
- Source
- MITN Purchasing Group
ConstructChat
Ask ConstructChat about 1395 E Washington – Demo & Abatement
Pick a question to edit it, or write your own.
First answer free · no account
Tender Information FAQ
Tender Information
Participants
| Not available for this record. |
Status
Original status | closed |
Taiyo status | Closed |
Taiyo last update | 2026-11-03 |
Contact
| Not available for this record. |
Description
Description | a . Security : Provide site security for duration of project after notice to proceed is received . b . Mobilization : Includes all labor , equipment , materials , and incidentals to mobilize to the project site to perform the work . It includes all supervision of successful Respondent ’ s personnel , and office support . It includes project meetings , surveying , site security , temporary controls and utilities , pre - work submittals , preparation of all submittals including , the successful Respondent ’ s Site - Specific Work Plan and Health and Safety Plan ( HASP ), personal protective equipment , permits , disposal approvals , erosion controls , barricades , traffic control , trash disposal , cleaning , and demobilization . c . Utilities : The successful Respondent will be responsible for confirming the status of all utilities and to have all utilities cut and removed from the site as required by regulation , local ordinance or , at a minimum , generally accepted methods . This may include well capping and proper closure of any on - site sewer systems or drainage systems as found by successful Respondent . d . Asbestos Containing Materials : Includes all labor , equipment , materials , incidentals , transportation , and disposal fees for the pre - demolition abatement of asbestos containing materials . Successful Respondent is to submit Notification of Intent to Renovate / Demolish to EGLE and the MIOSHA Asbestos Program at the Michigan Department of Licensing and Regulatory Affairs (“ LARA ”), provide the LCLBA with copy of notification and any subsequent revisions to notification . • The Pre - demolition survey reports in Attachment C , identified all materials found on site . All must be addressed as part of abatement . e . Universal Waste : Include all labor , equipment , materials , and incidentals , transportation and disposal fees needed to manage Universal Waste and its disposal prior to demolition . Universal wastes include , but are not limited to , bulbs ; ballasts ; batteries ; mercury containing / equipment ; and electronic equipment . The Pre - demolition survey reports in Attachment C , identified all materials found on site . All must be addressed as part of abatement . |
Location
Country | United States of America (USA) |
State | MITN |
Source
Source | MITN Purchasing Group |
URL |
More Details
Record type | Tender |
Sector | Water Supply and Storage, Energy Storage, Waste Processing and Treatment, Commercial, Residential |
Article published date | 2026-04-29 |
Research
Free account
View all details
You are reading the public part. A free account opens the rest:
- Every detail on this tender
- News and media coverage
- Technical research
Free account · no card · lands you back on this tender
More Water Supply and Storage tenders in United States of America
- RFP - Thurston County Lake Management Districts Submerged Aquatic Vegetation Control
- Coatings for Wet Well and Manholes
- Sole Source for Wedeco UV BulbsBallets
- Security Hardware Services
- Chambers Creek Regional Wastewater Treatment Plant BNR Aeration Basin Airflow Meters
- Se Dixie Highway County Road A1A Utility Relocation Project
- UNPAINTED SNOW FENCE AND DUNE GRASS NO II
- PreQualification of Bidders for Chaboya Improvements
