18513 452nd St . Onamia Shower
One of 9,043 tenders Taiyo tracks in Minnesota.
Source: Minnesota Purchasing Group
The Mille Lacs Band of Ojibwe , Community Development office will be accepting sealed lump sum bids for a residential bathroom renovation located at 18513 452nd Street , Onamia , MN . Unless otherwise noted all work shall be completed according to the 2025 MLB Spec Book . Exterior : 1 . Cut open wall and add
- Status
- Closed
- Sector
- Commercial, Residential, Road
- Location
- Minnesota, United States of America
- Updated
- 3 Nov 2026
- Source
- Minnesota Purchasing Group
ConstructChat
Ask ConstructChat about 18513 452nd St . Onamia Shower
Pick a question to edit it, or write your own.
First answer free · no account
Tender Information FAQ
Tender Information
Participants
| Not available for this record. |
Status
Original status | closed |
Taiyo status | Closed |
Taiyo last update | 2026-11-03 |
Contact
| Not available for this record. |
Description
Description | The Mille Lacs Band of Ojibwe , Community Development office will be accepting sealed lump sum bids for a residential bathroom renovation located at 18513 452nd Street , Onamia , MN . Unless otherwise noted all work shall be completed according to the 2025 MLB Spec Book . Exterior : 1 . Cut open wall and add framing for a 24 ” x36 ” window . 2 . Supply and install a 24 ” x36 ” Thermo - tech single hung window with tempered glass . Frame to be Sandlewood in color . Install so that the top of window and trim match the height of the kitchen window . Include proper flashing during install . 3 . Provide and install wood trim around the perimeter painted green to match the other windows . Interior : 1 . Demo existing tub / shower and shower trim kit . 2 . Supply and install Flexstone Royale Alcove Shower Surround Kit for openings up to 60 ” W x 32 ” D x 80 ” H . Include supply and install of two ( 2 ) 15 “ corner shelves . Supply and install Flexstone single threshold shower base with correct sided drain opening . All components to be Mocha Travetine in color . Contractor shall include all materials and labor necessary for installation per manufacturer ’ s instructions , including but not limited to the shower drain and backer boards for walls . Contractor is responsible for field measuring to ensure that the selected shower kit size is the best fit for the opening . 3 . Modify surround to accommodate for window which will be centered width - wise in the shower surround . Supply and install a Flexstone window sill trim kit in Mocha Travertine . Ensure that spray foam of rough opening is completed . Thoroughly silicone the installed window . 4 . Contractor shall supply and install plywood backer for the shower surround . 5 . Contractor shall include all costs associated with moving plumbing to align with the new shower . Note : there is no access panel and the kitchen cabinets abut the shower . 6 . Contractor shall include all costs associated with trimming the shower walls to fit the opening . Shower shall fit without leaving a gap in the flooring at shower edge . Material trimmed from shower walls may be used as a small curb to be installed in front of the tub if needed . 7 . Supply and install grab bars in shower per MN Accessibility Code . 8 . Modify existing shower valve assembly to eliminate tub spout ( shower function only ) Supply and install a new Moen Brantford posi - temp eco - performance shower faucet model # T2252EPORB . Contractor shall include installation of a shower divertor valve and install Moen handheld showerhead combo with slide bar ( Moen 3667EPORB ) old rubbed bronze finish . 9 . Contractor shall include a $ 1500 allowance for drywall and paint repairs . Any necessary drywall or painting work to be completed as described in the following . Patch , tape and texture drywall around the new tub as needed ; prime and paint all affected drywall surfaces in the bathroom . All ( new and existing ) texturing to match as closely as possible . Prime drywall with Zinsser mold killing primer . Paint to match existing . When complete , the expectation is that the paint and texturing surrounding the shower looks as uniform as possible . In the event that no drywall or painting work is needed , the allowance will be credited back . 10 . If existing detectors are not code compliant , demo and replace smoke detectors with spec combo smoke c / o detectors , as needed . 11 . Remove shower curtain rod . Homeowner will replace the rod and curtain himself . 12 . The expectation is to complete this shower installation without needing to move the homeowner out . They will be told that they cannot use their shower for a couple of days but will need to have continued access to use their toilet . 13 . Contractor shall include 0 . 5 % TERO tax fee in base bid if cost exceeds $ 25 , 000 . 00 . Submission of receipt for paid TERO fee is required with application for final payment . |
Location
Country | United States of America (USA) |
State | Minnesota |
Source
Source | Minnesota Purchasing Group |
URL |
More Details
Record type | Tender |
Sector | Commercial, Residential, Road |
Article published date | 2026-05-02 |
Research
Free account
View all details
You are reading the public part. A free account opens the rest:
- Every detail on this tender
- News and media coverage
- Technical research
Free account · no card · lands you back on this tender
More Commercial tenders in United States of America
- Sanitary Sewer Lateral Lining Pilot Program Section 230067500SA
- Trophies Plaques Awards ETC
- Painting Services for Building Exteriors Infrastructure Systems and Pressure Washing
- OAM Learning Management System
- CYBER SECURITY PENETRATION TESTING
- PROMOTIONAL ITEMS SOUVENIRS
- Proposed Services at Former Ingleside Recreation Center
- Towing Services CityOwned Vehicles Light and Heavy Duty
