logo

18513 452nd St . Onamia Shower

One of 9,043 tenders Taiyo tracks in Minnesota.

Source: Minnesota Purchasing Group

Tender
Closed

The Mille Lacs Band of Ojibwe , Community Development office will be accepting sealed lump sum bids for a residential bathroom renovation located at 18513 452nd Street , Onamia , MN . Unless otherwise noted all work shall be completed according to the 2025 MLB Spec Book . Exterior : 1 . Cut open wall and add

Status
Closed
Sector
Commercial, Residential, Road
Location
Minnesota, United States of America
Updated
3 Nov 2026
Source
Minnesota Purchasing Group

ConstructChat

Ask ConstructChat about 18513 452nd St . Onamia Shower

Pick a question to edit it, or write your own.

First answer free · no account

I am a

Tender Information FAQ

Tender Information

3 Q
The tender “18513 452nd St . Onamia Shower” is a tender record in Taiyo, linked to the Commercial sector. It is issued for works, goods, or services related to Minnesota, United States of America.

Participants

Not available for this record.

Status

Original status

closed

Taiyo status

Closed

Taiyo last update

2026-11-03

Contact

Not available for this record.

Description

Description

The Mille Lacs Band of Ojibwe , Community Development office will be accepting sealed lump sum bids for a residential bathroom renovation located at 18513 452nd Street , Onamia , MN . Unless otherwise noted all work shall be completed according to the 2025 MLB Spec Book . Exterior : 1 . Cut open wall and add framing for a 24 ” x36 ” window . 2 . Supply and install a 24 ” x36 ” Thermo - tech single hung window with tempered glass . Frame to be Sandlewood in color . Install so that the top of window and trim match the height of the kitchen window . Include proper flashing during install . 3 . Provide and install wood trim around the perimeter painted green to match the other windows . Interior : 1 . Demo existing tub / shower and shower trim kit . 2 . Supply and install Flexstone Royale Alcove Shower Surround Kit for openings up to 60 ” W x 32 ” D x 80 ” H . Include supply and install of two ( 2 ) 15 “ corner shelves . Supply and install Flexstone single threshold shower base with correct sided drain opening . All components to be Mocha Travetine in color . Contractor shall include all materials and labor necessary for installation per manufacturer ’ s instructions , including but not limited to the shower drain and backer boards for walls . Contractor is responsible for field measuring to ensure that the selected shower kit size is the best fit for the opening . 3 . Modify surround to accommodate for window which will be centered width - wise in the shower surround . Supply and install a Flexstone window sill trim kit in Mocha Travertine . Ensure that spray foam of rough opening is completed . Thoroughly silicone the installed window . 4 . Contractor shall supply and install plywood backer for the shower surround . 5 . Contractor shall include all costs associated with moving plumbing to align with the new shower . Note : there is no access panel and the kitchen cabinets abut the shower . 6 . Contractor shall include all costs associated with trimming the shower walls to fit the opening . Shower shall fit without leaving a gap in the flooring at shower edge . Material trimmed from shower walls may be used as a small curb to be installed in front of the tub if needed . 7 . Supply and install grab bars in shower per MN Accessibility Code . 8 . Modify existing shower valve assembly to eliminate tub spout ( shower function only ) Supply and install a new Moen Brantford posi - temp eco - performance shower faucet model # T2252EPORB . Contractor shall include installation of a shower divertor valve and install Moen handheld showerhead combo with slide bar ( Moen 3667EPORB ) old rubbed bronze finish . 9 . Contractor shall include a $ 1500 allowance for drywall and paint repairs . Any necessary drywall or painting work to be completed as described in the following . Patch , tape and texture drywall around the new tub as needed ; prime and paint all affected drywall surfaces in the bathroom . All ( new and existing ) texturing to match as closely as possible . Prime drywall with Zinsser mold killing primer . Paint to match existing . When complete , the expectation is that the paint and texturing surrounding the shower looks as uniform as possible . In the event that no drywall or painting work is needed , the allowance will be credited back . 10 . If existing detectors are not code compliant , demo and replace smoke detectors with spec combo smoke c / o detectors , as needed . 11 . Remove shower curtain rod . Homeowner will replace the rod and curtain himself . 12 . The expectation is to complete this shower installation without needing to move the homeowner out . They will be told that they cannot use their shower for a couple of days but will need to have continued access to use their toilet . 13 . Contractor shall include 0 . 5 % TERO tax fee in base bid if cost exceeds $ 25 , 000 . 00 . Submission of receipt for paid TERO fee is required with application for final payment .

Location

Country

United States of America (USA)

State

Minnesota

Source

Source

Minnesota Purchasing Group

URL

More Details

Record type

Tender

Sector

Commercial, Residential, Road

Article published date

2026-05-02

More on this tender

Research

Free account

View all details

You are reading the public part. A free account opens the rest:

  • Every detail on this tender
  • News and media coverage
  • Technical research
View all details

Free account · no card · lands you back on this tender