2 Salt Conveyors Towable Radial Stacker Self Co
One of 10,000+ tenders Taiyo tracks in Pennsylvania.
This Purpose Of These Specifications Is To Describe A Stainless Steel Portable 24 Inch By 70 Foot Self Contained Diesel Engine With Hydraulic Drive Radial Stacking Salt Conveyor And Hopper Shall Be Capable Of Being Loaded With A Department Owned 3 Cu Yd Front End Loader Conveyor Shall Be Used To Fill Various Department Salt Stockpile Structures The Unit Shall Meet This Specification Be A Current P
- Status
- Bidding
- Sector
- Steel
- Location
- Pennsylvania, United States of America
- Updated
- 3 Nov 2026
- Source
- Pennsylvania State eMarketplace
ConstructChat
Ask ConstructChat about 2 Salt Conveyors Towable Radial Stacker Self Co
Pick a question to edit it, or write your own.
First answer free · no account
Tender Information FAQ
Tender Information
Participants
| Not available for this record. |
Status
Original status | open |
Taiyo status | Bidding |
Taiyo last update | 2026-11-03 |
Contact
| Not available for this record. |
Description
Description | This Purpose Of These Specifications Is To Describe A Stainless Steel Portable 24 Inch By 70 Foot Self Contained Diesel Engine With Hydraulic Drive Radial Stacking Salt Conveyor And Hopper Shall Be Capable Of Being Loaded With A Department Owned 3 Cu Yd Front End Loader Conveyor Shall Be Used To Fill Various Department Salt Stockpile Structures The Unit Shall Meet This Specification Be A Current Production Model New And Complete Ready To Use Ref Kimco 2470Ss The Unit Shall Be Complete With All Equipment Required For Immediate Operation To Function As Listed In The Specification And The Unit Must Meet All Applicable Codes And Standards |
Original sector | IFB |
Location
Country | United States of America (USA) |
State | Pennsylvania |
Source
Source | Pennsylvania State eMarketplace |
URL |
More Details
Record type | Tender |
Sector | Steel |
Article published date | 2026-10-01 |
Research
Free account
View all details
You are reading the public part. A free account opens the rest:
- Every detail on this tender
- News and media coverage
- Technical research
Free account · no card · lands you back on this tender
More Steel tenders in United States
- Mill and overlay, replacement of 1 structure; Involving stripping, storing, and placing topsoil, excavation, reinforcing subgrade, placing road base, asphalt pavement, structural steel, riprap, and structural concrete, and installing fence on WYO 59
- Bridge rehabilitation and electrical upgrades; Involving removing concrete, excavation, replacing concrete slabs, placing structural steel, installing bridge railing and sheet piles, placing approach slabs, riprap, bridge deck overlay, and structural
- Bridge rehabilitation and electrical upgrades; Involving removing concrete, excavation, replacing concrete slabs, placing structural steel, installing bridge railing and sheet piles, placing approach slabs, riprap, bridge deck overlay, and structural
- Bridge replacement (1 concrete bridge); Involving installing cofferdams, removing one concrete bridge, placing structural steel, installing bridge railing, pedestrian railing, and steel piling, placing riprap, and installing reinforcing steel and pla
- Bridge replacement (1 Structure); Involving removing one steel bridge, excavation, grading, placing road base and prestressed precast concrete girders, installing bridge railing and steel piling, placing riprap, installing reinforcing steel, and plac
- DR19309, DR19004 & DR19622 combined Bridge repairs (3 structures); Involving installing controls for lead paint removal, removing concrete, placing structural steel, installing bridge railing, paint removal and repair, and repairing structural concre
- Slide Repair; Involving excavation; stripping, storing, and placing topsoil; placing erosion control measures, asphalt pavement, slide stabilization rock, and shotcrete; and installing reinforcing steel and timber lagging on US 26/89 beginning at RM
- Slide Repair; Involving excavation; stripping, storing, and placing topsoil; placing erosion control measures, asphalt pavement, slide stabilization rock, and shotcrete; and installing reinforcing steel and timber lagging on US 26/89 beginning at RM
