2025-061 Technical Auditing for Engineering

Sector: Power Generation (CCGT) • Location: United Kingdom

Source: Open Contracting Data Standard (OCDS)

Tender
Planned

Auditors to be employed to carry out Engineering asset assurance surveys and inspections at gas and electricity sites. The scope of work, for a period would be typically as follows for electricity assets:

  • Primary assets (transformers, circuit breakers > 25 years old) at ~ 20 substations supplying strategically important demand (possibly generation), including those designated Critical National
Status
Closed
Sector
Power Generation (CCGT)
Location
United Kingdom
Updated
3 Nov 2026
Source
Open Contracting Data Standard (OCDS)

ConstructChat

Ask ConstructChat about 2025-061 Technical Auditing for Engineering

Pick a question to edit it, or write your own.

First answer free · no account

I am a

Tender Information FAQ

Tender Information

3 Q
The tender “2025-061 Technical Auditing for Engineering” is a tender record in Taiyo, linked to the Power Generation (CCGT) sector. It is issued for works, goods, or services related to United Kingdom.

Participants

Not available for this record.

Status

Original status

planned

Taiyo status

Closed

Taiyo last update

2026-11-03

Contact

Not available for this record.

Description

Description

Auditors to be employed to carry out Engineering asset assurance surveys and inspections at gas and electricity sites. The scope of work, for a period would be typically as follows for electricity assets: * Primary assets (transformers, circuit breakers > 25 years old) at ~ 20 substations supplying strategically important demand (possibly generation), including those designated Critical National Infrastructure (CNI). Estimated Time – 3 months assumed reasonable. Sites to be agreed with National Grid Electricity Transmission (NGET). DESNZ want input to this too. The auditor would provide their expert view on whether NGET’s asset management policies and procedures are fit for purpose and consistent with international best practice. Whether they are following these policies and procedures correctly, in terms of the monitoring, maintenance and repair/replacement of these assets. Whether they are accurately recording these activities and making appropriate/timely interventions where issues are identified. And whether they are reporting accurately to Ofgem through Network Asset Resilience Measures (NARMs). 2. Expanding 1 to cover 30 substations (>10% of all NGET substations as a representative sample), 4-5 months. 3. Expanding 1 to cover a wider set of substation assets (Protection & Control, Connections / Busbars, Civil Structures, Cables, Auxiliary Systems, disconnectors/earth switches etc), ~ 6 months. 4. Expanding 3 to cover 30 substations, say 9 months. 5. Expanding 3 to include 10% of Overhead Lines and Cables (~800km) on heavily loaded strategic transmission boundaries. 1-2 years at a guess. A similar programme would likely be developed for Gas.

Location

Country

United Kingdom (UK)

Source

Source

Open Contracting Data Standard (OCDS)

URL

More Details

Record type

Tender

Sector

Power Generation (CCGT)

Article published date

2026-03-16

More on this tender

Research

Free account

View all details

You are reading the public part. A free account opens the rest:

  • Every detail on this tender
  • News and media coverage
  • Technical research
View all details

Free account · no card · lands you back on this tender