2025-061 Technical Auditing for Engineering
Sector: Power Generation (CCGT) • Location: United Kingdom
Source: Open Contracting Data Standard (OCDS)
Auditors to be employed to carry out Engineering asset assurance surveys and inspections at gas and electricity sites. The scope of work, for a period would be typically as follows for electricity assets:
- Primary assets (transformers, circuit breakers > 25 years old) at ~ 20 substations supplying strategically important demand (possibly generation), including those designated Critical National
- Status
- Closed
- Sector
- Power Generation (CCGT)
- Location
- United Kingdom
- Updated
- 3 Nov 2026
- Source
- Open Contracting Data Standard (OCDS)
ConstructChat
Ask ConstructChat about 2025-061 Technical Auditing for Engineering
Pick a question to edit it, or write your own.
First answer free · no account
Tender Information FAQ
Tender Information
Participants
| Not available for this record. |
Status
Original status | planned |
Taiyo status | Closed |
Taiyo last update | 2026-11-03 |
Contact
| Not available for this record. |
Description
Description | Auditors to be employed to carry out Engineering asset assurance surveys and inspections at gas and electricity sites. The scope of work, for a period would be typically as follows for electricity assets: * Primary assets (transformers, circuit breakers > 25 years old) at ~ 20 substations supplying strategically important demand (possibly generation), including those designated Critical National Infrastructure (CNI). Estimated Time – 3 months assumed reasonable. Sites to be agreed with National Grid Electricity Transmission (NGET). DESNZ want input to this too. The auditor would provide their expert view on whether NGET’s asset management policies and procedures are fit for purpose and consistent with international best practice. Whether they are following these policies and procedures correctly, in terms of the monitoring, maintenance and repair/replacement of these assets. Whether they are accurately recording these activities and making appropriate/timely interventions where issues are identified. And whether they are reporting accurately to Ofgem through Network Asset Resilience Measures (NARMs). 2. Expanding 1 to cover 30 substations (>10% of all NGET substations as a representative sample), 4-5 months. 3. Expanding 1 to cover a wider set of substation assets (Protection & Control, Connections / Busbars, Civil Structures, Cables, Auxiliary Systems, disconnectors/earth switches etc), ~ 6 months. 4. Expanding 3 to cover 30 substations, say 9 months. 5. Expanding 3 to include 10% of Overhead Lines and Cables (~800km) on heavily loaded strategic transmission boundaries. 1-2 years at a guess. A similar programme would likely be developed for Gas. |
Location
Country | United Kingdom (UK) |
Source
Source | Open Contracting Data Standard (OCDS) |
URL |
More Details
Record type | Tender |
Sector | Power Generation (CCGT) |
Article published date | 2026-03-16 |
Research
Free account
View all details
You are reading the public part. A free account opens the rest:
- Every detail on this tender
- News and media coverage
- Technical research
Free account · no card · lands you back on this tender
More Power Generation (CCGT) tenders in United Kingdom
- Kettlethorpe High School ~ Cleaning Tender
- Civils, Buildings, OHL and UGC Framework – Multi Site
- ALL WALES SPINAL IMPLANTS & CONSUMABLES
- Purchase of CBtect Portable Circuit Breaker Monitoring
- Pay and Display Machine Maintenance and Associated Back-office System, Hardware Upgrades, and PSP Service
- NEPO303 Meter Operator Services
- Provision of Northside School Fire Alarm Renewal
- 357 Fleet Refurbishment and Systems Upgrade