2025 Drainage System Improvements - Phase 1
Sector: Road • Location: Georgia, United States
Sealed Bids for construction of 2025 Drainage System Improvements - Phase 1 will be received until December 11, 2025 at 2:00 PM. Bids must be submitted electronically through QuestCDN.com. No paper submissions will be accepted. Base Cost of all Bids shall be published to the QuestCDN website approximately 30 minutes after the closing time. Any Bid received after said time and date will not be cons
- Status
- Closed
- Sector
- Road, Cement, Forest Products and Packaging, Consumer Products, Water Supply and Storage, Waste Processing and Treatment
- Location
- Georgia, United States of America
- Updated
- 3 Nov 2026
- Source
- Georgia Procurement Registry
ConstructChat
Ask ConstructChat about 2025 Drainage System Improvements - Phase 1
Pick a question to edit it, or write your own.
First answer free · no account
Tender Information FAQ
Tender Information
Participants
| Not available for this record. |
Status
Original status | under evaluation |
Taiyo status | Closed |
Taiyo last update | 2026-11-03 |
Contact
| Not available for this record. |
Description
Description | Sealed Bids for construction of 2025 Drainage System Improvements - Phase 1 will be received until December 11, 2025 at 2:00 PM. Bids must be submitted electronically through QuestCDN.com. No paper submissions will be accepted. Base Cost of all Bids shall be published to the QuestCDN website approximately 30 minutes after the closing time. Any Bid received after said time and date will not be considered by the Owner. No Bid may be withdrawn after the closing time for the receipt of Bids for a period of sixty (60) days except as specifically provided in the Instructions to Bidders and/or by State Law. The Work shall consist of furnishing all labor, equipment, and materials necessary to remove and replace approximately six (6) stormwater culverts, remove sediment and debris from approximately thirty-six (36) driveway culverts, and perform approximately 1,300 linear-feet of ditch grading, including, but not limited to, pavement replacement, earthwork, grassing, soil erosion and sedimentation control measures, and all appurtenances necessary to provide a complete installation. Time allotted for completion of work is 90 calendar days. All Work shall be completed in accordance with the plans and specifications. The Work will be awarded in one (1) Contract. See additional information on Supporting Document Section. |
Original sector | Construction / Public Works |
Location
Country | United States of America (USA) |
State | Georgia |
Source
Source | Georgia Procurement Registry |
URL |
More Details
Record type | Tender |
Sector | Road, Cement, Forest Products and Packaging, Consumer Products, Water Supply and Storage, Waste Processing and Treatment |
Article published date | 2026-10-22 |
Research
Free account
View all details
You are reading the public part. A free account opens the rest:
- Every detail on this tender
- News and media coverage
- Technical research
Free account · no card · lands you back on this tender
More Road tenders in United States
- Network Rail Commercial Property Maintenance Framework PSQ
- RFP - 2026-08-001
- SB011-27 822 Leonard Court Sinkhole Repair
- FREEDMAN GROVE ROAD ROADWAY IMPROVEMENTS
- RFP 26-20, On-Paving - Annual Contract
- SB013-26 Raised Intersections for Crogan Street at Perry Street and Clayton Street at Pike Street
- Road Work Bids- Resurface Macgruder Road
- Woodlawn Dr & Claxton Dairy Rd Roundabout
