logo

2025 S THIRD AVENUE DEMOLITION

One of 3,321 tenders Taiyo tracks in MITN.

Source: MITN Purchasing Group

Tender
Closed

2 . 1 Demolition of Structure : The Scope of Work (“ Work ”) for this RFP may include , but is not necessarily limited to : 2 . 1 . 1 Security : Provide site security for duration of project after notice to proceed is received and project work has begun . Coordination with the City of Alpena for planned Right

Status
Closed
Sector
Road, Water Supply and Storage, Energy Storage, Power Transmission, Power Generation (CCGT), Car parking, Commercial, Cement, Automotive, Residential
Location
MITN, United States of America
Updated
3 Nov 2026
Source
MITN Purchasing Group

ConstructChat

Ask ConstructChat about 2025 S THIRD AVENUE DEMOLITION

Pick a question to edit it, or write your own.

First answer free · no account

I am a

Tender Information FAQ

Tender Information

3 Q
The tender “2025 S THIRD AVENUE DEMOLITION” is a tender record in Taiyo, linked to the Road sector. It is issued for works, goods, or services related to MITN, United States of America.

Participants

Not available for this record.

Status

Original status

closed

Taiyo status

Closed

Taiyo last update

2026-11-03

Contact

Not available for this record.

Description

Description

2 . 1 Demolition of Structure : The Scope of Work (“ Work ”) for this RFP may include , but is not necessarily limited to : 2 . 1 . 1 Security : Provide site security for duration of project after notice to proceed is received and project work has begun . Coordination with the City of Alpena for planned Right - of - Way closures is required . City of Alpena Department of Public Works may be able to assist with barricades if needed with 72 - hour advanced notice . 2 . 1 . 2 Mobilization : Includes all labor , equipment , materials , and incidentals to mobilize to the project site to perform the work , including but not limited to contractor office support , project meetings , site visits , site security , temporary controls and utilities , pre - work submittals , required permitting , personal protective equipment , disposal approvals , erosion controls , barricades , traffic control , trash disposal , cleaning , and demobilization . 2 . 1 . 3 Utilities : The City of Alpena has completed the following : 1 ) Confirmed with Alpena Power Company that power has been shut off and has requested equipment removal ; 2 ) Confirmed with Veolia that water has been shut off ; 3 ) confirmed with DTE that the gas line at the main has been cut and capped . 2 . 1 . 3 . 1 No onsite sources of water will be available during abatement activities . The contractor is responsible for providing water for dust suppression and showers , if needed . Arrangements may be made with Veolia to utilize a nearby hydrant for water ; water usage fees must be included in RFP submissions . 2 . 1 . 3 . 2 Contractor should arrange for alternate sources of power to operate needed equipment . Contractor has responsibility for confirming the disconnection of utilities prior to the start of site activities . 2 . 1 . 3 . 3 There are no restroom facilities at the project sites . The contractor is responsible for providing access to restroom facilities for its workers . 2 . 1 . 4 Asbestos : Environmental testing samples did not contain asbestos . See Appendix D . 2 . 1 . 5 Universal Waste : Include all labor , equipment , materials and incidentals , transportation and disposal fees needed to manage Universal Waste and its disposal prior to demolition . Universal wastes include , but are not limited to , bulbs ; ballasts ; batteries ; items containing mercury ; and electronic equipment . 2 . 1 . 5 . 1 The Pre - demolition survey reports from Otwell - Mawby , contained in Appendix D , identified all materials found on site . All must be addressed as part of abatement . 2 . 1 . 5 . 2 The contractor is responsible for determining all means and methods for removal of ACMs , including determining appropriate PPE ( respiratory protection , protective clothing , etc .), air filtration needed , the appropriate method of decontamination ( e . g ., shower ), and proper disposal requirements . 2 . 1 . 5 . 3 The contractor shall submit , in a timely manner , copies of all signed landfill weight tickets and waste manifests or similar documentation demonstrating that universal waste was deposited in a type II landfill or other appropriate manner approved for receipt of such materials . 2 . 1 . 6 Soil Erosion : Contractor shall comply with the Natural Resources and Environmental Protection Act ; Soil Erosion and Sediment Control , 1994 PA 451 Part 91 as amended , if applicable . 2 . 1 . 6 . 1 Includes all application fees and obtaining a soil erosion and sedimentation control permit from Alpena County 2 . 1 . 6 . 2 Includes furnishing , installing , and maintaining as long as necessary and remove when no longer required , all necessary engineering controls to prevent erosion and control sedimentation of onsite soils . 2 . 1 . 7 Demolition : Includes all labor , equipment , materials , fees , permits , and incidentals needed to : demolish building , flatwork , and below grade structures associated with the building ( including basement , foundations , footings , sumps , pits , vaults , etc .); transportation and disposal of all demolition debris ; removal of all concrete and asphalt drives and parking areas on site , private sidewalks , patios or any other slabs located on the site ; and utility disconnects , removal , abandonment or protection of buried underground utilities as specified . 2 . 1 . 7 . 1 The cost to remove trees that are necessary to remove in order to facilitate demolition , or additional debris , should be included in the bid . 2 . 1 . 7 . 2 Use of explosives is strictly prohibited . Do not burn demolished materials . 2 . 1 . 7 . 3 Except for items or materials indicated to be reused , salvaged , or otherwise indicated to remain property of the ACLBA or property owner , demolished materials shall become the contractor ’ s property and shall be removed , recycled , or disposed from the project site in an appropriate and legal manner in a State licensed location or landfill . 2 . 1 . 7 . 4 Contractor will be required to provide water , application equipment , and personnel for dust suppression during demolition activities . 2 . 1 . 7 . 5 Contractor shall put in place any necessary protections to protect adjacent properties . 2 . 1 . 7 . 6 Contractor shall be responsible for actions necessary to remedy situations involving material spilled or leaked in transit , or mud or dirt tracked off the site . This includes trucks carrying imported fill or other materials to the site ( i . e . dust generated from trucks entering the site on adjacent roads ). Perform cleanup in accordance with all applicable federal , State , and local regulations at no additional cost to the ACLBA . 2 . 1 . 7 . 7 Temporary Fencing : The successful Respondent ( s ) must entirely enclose the demolition activity area by means of woven wire or snow fence having minimum height of four feet if an open hole is left overnight . Gates must be provided at all points of access , as applicable . Gates must be closed and secured in place at all times when work is not in progress . The fence must be removed and grounds restored to original condition upon completion of the work . 2 . 1 . 7 . 8 Contractor shall comply with all applicable MIOSHA standards . 2 . 1 . 8 Site Restoration : Site restoration shall include general backfilling , leveling and compaction and the installation of topsoil , grass seed and straw . Procedures , methods , materials , and other information regarding excavation and backfill shall be included in the Project Work Plan developed by the contractor . The following information regarding excavation and backfilling shall be included in the Project Work Plan , at a minimum : ( 1 .) Project Schedule ; ( 2 .) List of Subcontractors ; ( 3 .) Description of the methods to be used for each related operation ( i . e ., excavation , transportation , sampling , etc .); ( 4 .) Method to protect any storm sewers , rivers , and conveyances during soil excavation in close proximity of the site ; and ( 5 .) Description of the means , methods , and procedures for site restoration . 2 . 1 . 8 . 1 Backfill Material : Fill material shall be clean and uncontaminated from natural soils ; no material bigger than 3 inches ( unless naturally occurring ) is allowed . Material shall be MDOT Class II sand or MDOT Class III granular fill and shall be free of trash , debris , roots , other organic matter , and contaminants . Contractor shall confirm origin site of fill material and the SLBA may choose to require a material test . Fill material shall not be taken from another project site and relocated to projects within the scope of this RFP . 2 . 1 . 8 . 2 Finished Grade : The final site grade shall be to the existing back of sidewalk level . Two to six inches of topsoil shall be used to reach final grade . The property is not required to be seeded with grass , as construction shall commence shortly after demo is completed . 2 . 1 . 8 . 3 Right - of - way Areas : Contractor is required to repair , in kind or better , any areas of the contractor ’ s access point , such as public roads , sidewalks , or curbs , disturbed as a result of contractor ’ s work at the site . 2 . 1 . 9 Demobilization : Includes all labor , equipment , materials , and incidentals to complete balance of the work under the bidding documents including but not limited to : site demobilization including removing personnel , equipment , supplies , rubbish and incidentals from the project site . 2 . 1 . 10 Time of Work and Completion : The work to be completed pursuant to this Request for Proposal will be scheduled between the hours of 7 : 00 a . m . and 6 : 00 p . m ., Monday through Saturday . No work shall be done between the hours of 6 : 00 p . m . and 7 : 00 a . m . 2 . 1 . 10 . 1 Demolition : The contractor shall commence pre - demo work ( e . g ., submitting notification to the State ) within four ( 4 ) days following receipt of the ACLBA ' s Notice to Proceed . Contractor shall begin as soon as feasible following notification waiting periods and all work activities shall be completed by June 30 , 2026 . The contractor shall not discontinue work for more than five ( 5 ) consecutive calendar days without the prior written approval of the ACLBA . ACLBA may charge the contractor for delays if demolition is not completed on time .

Location

Country

United States of America (USA)

State

MITN

Source

Source

MITN Purchasing Group

URL

More Details

Record type

Tender

Sector

Road, Water Supply and Storage, Energy Storage, Power Transmission, Power Generation (CCGT), Car parking, Commercial, Cement, Automotive, Residential

Article published date

2026-04-29

More on this tender

Research

Free account

View all details

You are reading the public part. A free account opens the rest:

  • Every detail on this tender
  • News and media coverage
  • Technical research
View all details

Free account · no card · lands you back on this tender