2026-020 Residential Flexibility
The scope, dates and status of this tender. A free account opens every field.
Source: Contracts Finder
The Ofgem Clean Power 2030 Action Plan (CPAP) requires around 10-12GW of consumer led flexibility by 2030, with this value increasing by 2035 with more electric vehicle (EV) uptake and bi-directional charging. Of this target around 3 GW is due to district heating and I&C flexibility, leaving a total of around 7 - 9 GW coming from residential sources, predominantly EV charging.The ability of reside
- Status
- Closed
- Sector
- Power Generation (CCGT), Energy Storage, Electric Vehicles (EVs), Automotive, Residential
- Location
- United Kingdom
- Updated
- 3 Nov 2026
- Source
- Contracts Finder
ConstructChat
Ask ConstructChat about 2026-020 Residential Flexibility
Pick a question to edit it, or write your own.
First answer free · no account
Tender Information FAQ
Tender Information
Participants
| Not available for this record. |
Status
Original status | awarded contract |
Taiyo status | Closed |
Taiyo last update | 2026-11-03 |
Contact
| Not available for this record. |
Description
Description | The Ofgem Clean Power 2030 Action Plan (CPAP) requires around 10-12GW of consumer led flexibility by 2030, with this value increasing by 2035 with more electric vehicle (EV) uptake and bi-directional charging. Of this target around 3 GW is due to district heating and I&C flexibility, leaving a total of around 7 - 9 GW coming from residential sources, predominantly EV charging.The ability of residential customers to provide flexibility is rapidly evolving with an increase in large capacity assets (EVs, heat pumps, batteries), hardware to enable access to flexibility (smart connections), and the development of propositions enabling customers to engage with flexibility services and obtain value. However, the extent to which this can contribute to the 7 - 9 GW of residential flexibility required by 2030 is uncertain. Ofgem therefore requires analysis to be conducted by a supplier to assess the contribution that residential flexibility can make to CP2030 and specifically the effect of residential flex on the cost allocation and recovery review (CARR) programme |
Location
Country | United Kingdom (UK) |
Source
Source | Contracts Finder |
URL |
More Details
Record type | Tender |
Sector | Power Generation (CCGT), Energy Storage, Electric Vehicles (EVs), Automotive, Residential |
Article published date | 2026-03-07 |
Research
Free account
View all details
You are reading the public part. A free account opens the rest:
- Every detail on this tender
- News and media coverage
- Technical research
Free account · no card · lands you back on this tender
More Power Generation (CCGT) tenders in United Kingdom
- Kettlethorpe High School ~ Cleaning Tender
- Civils, Buildings, OHL and UGC Framework – Multi Site
- ALL WALES SPINAL IMPLANTS & CONSUMABLES
- Purchase of CBtect Portable Circuit Breaker Monitoring
- Pay and Display Machine Maintenance and Associated Back-office System, Hardware Upgrades, and PSP Service
- NEPO303 Meter Operator Services
- Provision of Northside School Fire Alarm Renewal
- 357 Fleet Refurbishment and Systems Upgrade
