2026 Ash Tree and Stump Removal ( South Washington St )
The scope, dates and status of this tender. A free account opens every field.
Source: North Dakota Purchasing Group
1 . 1 This project will consist of removing 20 street trees in the ROW as part of an EAB Mitigation Grant the City was awarded . These removals are also part of the City ’ s Emerald Ash Borer Preparedness Plan . All 20 trees being removed are Ash . No work will be permitted on Saturday and Sunday ,
- Status
- Closed
- Sector
- Road, Car parking, Automotive
- Location
- North Dakota, United States of America
- Updated
- 3 Nov 2026
- Source
- North Dakota Purchasing Group
ConstructChat
Ask ConstructChat about 2026 Ash Tree and Stump Removal ( South Washington St )
Pick a question to edit it, or write your own.
First answer free · no account
Tender Information FAQ
Tender Information
Participants
| Not available for this record. |
Status
Original status | closed |
Taiyo status | Closed |
Taiyo last update | 2026-11-03 |
Contact
| Not available for this record. |
Description
Description | 1 . 1 This project will consist of removing 20 street trees in the ROW as part of an EAB Mitigation Grant the City was awarded . These removals are also part of the City ’ s Emerald Ash Borer Preparedness Plan . All 20 trees being removed are Ash . No work will be permitted on Saturday and Sunday , unless specifically requested or approved by the City Forester . 1 . 2 The Contractor shall furnish equipment , tools , materials , and labor for this project . It may also include other city owned properties and private property trees . Methods and manner used in removal and cleanup shall be subject to the approval of the City Forester . 1 . 3 The Contractor shall make every attempt to protect all public and private property adjacent to the work site and along all hauling routes . Any damage to public or private property shall be the sole responsibility of the contractor and shall be repaired to the satisfaction of the owner of the property involved . SPECIFICATIONS 3 . 1 Stumps , including all roots > 3 ” diameter as well as exposed flare roots , shall be ground to a minimum depth of 16 inches ; backfilled with a quality screened topsoil to approximately 6 inches above grade at center of stump hole to allow for settling . 3 . 2 Grindings shall be swept off sidewalk and driveway areas immediately . Any location where grindings have been left longer than five ( 5 ) working days will result in non - payment for that location . |
Location
Country | United States of America (USA) |
State | North Dakota |
Source
Source | North Dakota Purchasing Group |
URL |
More Details
Record type | Tender |
Sector | Road, Car parking, Automotive |
Article published date | 2026-04-08 |
Research
Free account
View all details
You are reading the public part. A free account opens the rest:
- Every detail on this tender
- News and media coverage
- Technical research
Free account · no card · lands you back on this tender
More Road tenders in United States of America
- RFP - Pro-Tem Hearing Examiner
- NEW TIRES RETREADS AND TIRE SERVICES
- Professional Construction Engineering and Inspection CEI Services for the Williamson Boulevard Widening
- Lincoln Avenue Wascher to Killarney Preliminary Engineering Section 220065800PV
- KilleenFort Hood Regional Airport KFHRA Terminal Apron Rehabilitation Phase II
- IFB 947902022JM Screening 10 Asphalt Filter Stone 8 Granite Double Washed
- IFB 914202022AM Street Sweeper Parts and Brooms
- IFB 843402021AB Hay Alfalfa and Wheat Straw for Norfolk Zoo
