logo

2026 Davidson Middle Academy Roofing

One of 2,142 tenders Taiyo tracks in Mitn.

Source: Southgate Community Schools (MITN)

Tender
Closed

Project Description 1 . The BASE BID project work includes roof replacement at Section A , B C , D , E , F and I . Work includes all lift equipment , all fall protection work , the removal of the existing roof membrane , the removal of the existing insulation , removal of the existing metal flashings and edgi

Status
Closed
Sector
Metal, Water Supply and Storage, Commercial
Location
Southgate, Mitn, United States of America
Updated
3 Nov 2026
Source
Southgate Community Schools (MITN)

ConstructChat

Ask ConstructChat about 2026 Davidson Middle Academy Roofing

Pick a question to edit it, or write your own.

First answer free · no account

I am a

Tender Information FAQ

Tender Information

3 Q
The tender “2026 Davidson Middle Academy Roofing” is a tender record in Taiyo, linked to the Metal sector. It is issued for works, goods, or services related to Southgate, Mitn, United States of America.

Participants

Not available for this record.

Status

Original status

closed

Taiyo status

Closed

Taiyo last update

2026-11-03

Contact

Not available for this record.

Description

Description

Project Description 1 . The BASE BID project work includes roof replacement at Section A , B C , D , E , F and I . Work includes all lift equipment , all fall protection work , the removal of the existing roof membrane , the removal of the existing insulation , removal of the existing metal flashings and edging , limited deck repair ( unit price ). Areas A , B , C D , & F will have a nailed base sheet and adhered tapered ISO insulation . Section E will have ISO augured down to the tectum deck and adhered layer of ISO insulation . Section I will have a loose laid rosin and then nailed gypsum board . The new roof system for A , B , C D , F and I shall be a new fully adhered EPDM roof system , new flashings and related sheet metal flashings as indicated on the plans and drawings for the building . Section E will have a fully adhered fleece backed PVC with ribs welded on to appear like a metal roof . Work shall include replacement of rotted or damaged wood blocking ( unit price ), installation of new wood blocking where indicated in the drawings , plumbing work consisting of replacement of all drain bolts , strainers and clamping rings , drain bowl replacement ( unit price ), water testing of roof drains , new pipe supports , and limited HVAC related work if necessary to raise gas lines or to provide electrical disconnects to remove and reinstall exhaust fans . Work also includes installation of new metal edging along perimeter edges of all roof sections , as detailed . Additionally , work shall include working with other Construction trades so as to complete new mechanical equipment renovations as described in the Wakely Drawings dated 1 - 2026 . 2 . The Base Bid project work also includes Section G and H to replace the metal edge detail and strip in the new perimeter flashing to the existing EPDM roofing per drawings . See more

Location

Country

United States of America (USA)

State

Mitn

City

Southgate

Source

Source

Southgate Community Schools (MITN)

URL

More Details

Record type

Tender

Sector

Metal, Water Supply and Storage, Commercial

Article published date

2026-04-29

More on this tender

Research

Free account

View all details

You are reading the public part. A free account opens the rest:

  • Every detail on this tender
  • News and media coverage
  • Technical research
View all details

Free account · no card · lands you back on this tender