2026 Davidson Middle Academy Roofing
One of 2,142 tenders Taiyo tracks in Mitn.
Source: Southgate Community Schools (MITN)
Project Description 1 . The BASE BID project work includes roof replacement at Section A , B C , D , E , F and I . Work includes all lift equipment , all fall protection work , the removal of the existing roof membrane , the removal of the existing insulation , removal of the existing metal flashings and edgi
- Status
- Closed
- Sector
- Metal, Water Supply and Storage, Commercial
- Location
- Southgate, Mitn, United States of America
- Updated
- 3 Nov 2026
- Source
- Southgate Community Schools (MITN)
ConstructChat
Ask ConstructChat about 2026 Davidson Middle Academy Roofing
Pick a question to edit it, or write your own.
First answer free · no account
Tender Information FAQ
Tender Information
Participants
| Not available for this record. |
Status
Original status | closed |
Taiyo status | Closed |
Taiyo last update | 2026-11-03 |
Contact
| Not available for this record. |
Description
Description | Project Description 1 . The BASE BID project work includes roof replacement at Section A , B C , D , E , F and I . Work includes all lift equipment , all fall protection work , the removal of the existing roof membrane , the removal of the existing insulation , removal of the existing metal flashings and edging , limited deck repair ( unit price ). Areas A , B , C D , & F will have a nailed base sheet and adhered tapered ISO insulation . Section E will have ISO augured down to the tectum deck and adhered layer of ISO insulation . Section I will have a loose laid rosin and then nailed gypsum board . The new roof system for A , B , C D , F and I shall be a new fully adhered EPDM roof system , new flashings and related sheet metal flashings as indicated on the plans and drawings for the building . Section E will have a fully adhered fleece backed PVC with ribs welded on to appear like a metal roof . Work shall include replacement of rotted or damaged wood blocking ( unit price ), installation of new wood blocking where indicated in the drawings , plumbing work consisting of replacement of all drain bolts , strainers and clamping rings , drain bowl replacement ( unit price ), water testing of roof drains , new pipe supports , and limited HVAC related work if necessary to raise gas lines or to provide electrical disconnects to remove and reinstall exhaust fans . Work also includes installation of new metal edging along perimeter edges of all roof sections , as detailed . Additionally , work shall include working with other Construction trades so as to complete new mechanical equipment renovations as described in the Wakely Drawings dated 1 - 2026 . 2 . The Base Bid project work also includes Section G and H to replace the metal edge detail and strip in the new perimeter flashing to the existing EPDM roofing per drawings . See more |
Location
Country | United States of America (USA) |
State | Mitn |
City | Southgate |
Source
Source | Southgate Community Schools (MITN) |
URL |
More Details
Record type | Tender |
Sector | Metal, Water Supply and Storage, Commercial |
Article published date | 2026-04-29 |
Research
Free account
View all details
You are reading the public part. A free account opens the rest:
- Every detail on this tender
- News and media coverage
- Technical research
Free account · no card · lands you back on this tender
More Metal tenders in United States of America
- Token Creek Roof Replacements
- HVAC Ice Machine Servicing and Sheet Metal Fabrication
- Jail Courthouse Walkway Project
- RFP 887702021MF Rapid Response Fire Boat for Norfolk FireRescue
- Various Locations Sewer Replacement No. 9 [BID TABULATION]
- Millbrae Warehouse Loading Dock Repair
- Biosolids Digester Facilities - Southeast Treatment Plant T-...
- Electrical (C-10 License), San Francisco, San Mateo, Santa C...
