logo

2026 LMIG Resurfacing Project

The scope, dates and status of this tender. A free account opens every field.

Source: Georgia Purchasing Group

Tender
Closed

Asphalt paving , milling , patching , striping , traffic loop replacement and all associated work on various City streets within 120 consecutive calendar days and shall include all labor , materials and incidentals necessary to construct the project . A preliminary list of streets will be included in the bid packet

Status
Closed
Sector
Waste Processing and Treatment, Bridge, Water Supply and Storage, Car parking, Cement, Automotive, Road
Location
Georgia, United States of America
Updated
3 Nov 2026
Source
Georgia Purchasing Group

ConstructChat

Ask ConstructChat about 2026 LMIG Resurfacing Project

Pick a question to edit it, or write your own.

First answer free · no account

I am a

Tender Information FAQ

Tender Information

3 Q
The tender “2026 LMIG Resurfacing Project” is a tender record in Taiyo, linked to the Waste Processing and Treatment sector. It is issued for works, goods, or services related to Georgia, United States of America.

Participants

Not available for this record.

Status

Original status

closed

Taiyo status

Closed

Taiyo last update

2026-11-03

Contact

Not available for this record.

Description

Description

Asphalt paving , milling , patching , striping , traffic loop replacement and all associated work on various City streets within 120 consecutive calendar days and shall include all labor , materials and incidentals necessary to construct the project . A preliminary list of streets will be included in the bid packet . The amount of work may increase or decrease , and the preliminary list of streets are subject to change . This project includes some GDOT LMIG funding . The latest GDOT Standard Specifications for Road and Bridge Construction of the Georgia Department of Transportation as amended herein , shall govern the construction of this project . City will hire it is own testing agency . GDOT testing specifications section 400 . 3 . 06 to be followed . Vehicular and Pedestrian Traffic Control following GDOT and MUTCD standards are required . Contractor shall legally dispose milling materials . Roads must be paved 24 hours after milling activities . No parking within the construction limits . Contractor to adjust water / sewer utilities to grade following Gwinnett County DWR standards ( concrete cap ). Regular Work Hours are 8 AM to 5 PM . Some roads are anticipated to be performed at Night ( from 9 PM to 5 AM ). All roads to be performed at night are listed on the bid tab .

Location

Country

United States of America (USA)

State

Georgia

Source

Source

Georgia Purchasing Group

URL

More Details

Record type

Tender

Sector

Waste Processing and Treatment, Bridge, Water Supply and Storage, Car parking, Cement, Automotive, Road

Article published date

2026-05-10

More on this tender

Research

Free account

View all details

You are reading the public part. A free account opens the rest:

  • Every detail on this tender
  • News and media coverage
  • Technical research
View all details

Free account · no card · lands you back on this tender