2026 LMIG Resurfacing Project
The scope, dates and status of this tender. A free account opens every field.
Source: Georgia Purchasing Group
Asphalt paving , milling , patching , striping , traffic loop replacement and all associated work on various City streets within 120 consecutive calendar days and shall include all labor , materials and incidentals necessary to construct the project . A preliminary list of streets will be included in the bid packet
- Status
- Closed
- Sector
- Waste Processing and Treatment, Bridge, Water Supply and Storage, Car parking, Cement, Automotive, Road
- Location
- Georgia, United States of America
- Updated
- 3 Nov 2026
- Source
- Georgia Purchasing Group
ConstructChat
Ask ConstructChat about 2026 LMIG Resurfacing Project
Pick a question to edit it, or write your own.
First answer free · no account
Tender Information FAQ
Tender Information
Participants
| Not available for this record. |
Status
Original status | closed |
Taiyo status | Closed |
Taiyo last update | 2026-11-03 |
Contact
| Not available for this record. |
Description
Description | Asphalt paving , milling , patching , striping , traffic loop replacement and all associated work on various City streets within 120 consecutive calendar days and shall include all labor , materials and incidentals necessary to construct the project . A preliminary list of streets will be included in the bid packet . The amount of work may increase or decrease , and the preliminary list of streets are subject to change . This project includes some GDOT LMIG funding . The latest GDOT Standard Specifications for Road and Bridge Construction of the Georgia Department of Transportation as amended herein , shall govern the construction of this project . City will hire it is own testing agency . GDOT testing specifications section 400 . 3 . 06 to be followed . Vehicular and Pedestrian Traffic Control following GDOT and MUTCD standards are required . Contractor shall legally dispose milling materials . Roads must be paved 24 hours after milling activities . No parking within the construction limits . Contractor to adjust water / sewer utilities to grade following Gwinnett County DWR standards ( concrete cap ). Regular Work Hours are 8 AM to 5 PM . Some roads are anticipated to be performed at Night ( from 9 PM to 5 AM ). All roads to be performed at night are listed on the bid tab . |
Location
Country | United States of America (USA) |
State | Georgia |
Source
Source | Georgia Purchasing Group |
URL |
More Details
Record type | Tender |
Sector | Waste Processing and Treatment, Bridge, Water Supply and Storage, Car parking, Cement, Automotive, Road |
Article published date | 2026-05-10 |
Research
Free account
View all details
You are reading the public part. A free account opens the rest:
- Every detail on this tender
- News and media coverage
- Technical research
Free account · no card · lands you back on this tender
More Waste Processing and Treatment tenders in United States of America
- Coatings for Wet Well and Manholes
- Sole Source for Wedeco UV BulbsBallets
- Chambers Creek Regional Wastewater Treatment Plant BNR Aeration Basin Airflow Meters
- Annual Construction Contract For Utility Replacement 2022A
- FY23 Sewer Rehabilitation
- Fire Station 32 ADA Restroom Improvements
- Foothills Trail East Puyallup McMillin Trailhead Improvements
- Pipeline Trail Phase 1 Project
