2026 Milton Fire Hydrant Replacement
Sector: Water Supply and Storage • Location: Vermont, United States of America
Source: Vermont Purchasing Group
The Town of Milton is seeking qualified contractors to furnish all labor , equipment , tools , traffic control , and incidentals necessary for the removal and replacement of existing fire hydrants throughout the Town ’ s municipal water system as part of the 2026 Fire Hydrant Replacement Project . All fire hydrant
- Status
- Closed
- Sector
- Water Supply and Storage, Road, Government
- Location
- Vermont, United States of America
- Updated
- 3 Nov 2026
- Source
- Vermont Purchasing Group
ConstructChat
Ask ConstructChat about 2026 Milton Fire Hydrant Replacement
Pick a question to edit it, or write your own.
First answer free · no account
Tender Information FAQ
Tender Information
Participants
| Not available for this record. |
Status
Original status | closed |
Taiyo status | Closed |
Taiyo last update | 2026-11-03 |
Contact
| Not available for this record. |
Description
Description | The Town of Milton is seeking qualified contractors to furnish all labor , equipment , tools , traffic control , and incidentals necessary for the removal and replacement of existing fire hydrants throughout the Town ’ s municipal water system as part of the 2026 Fire Hydrant Replacement Project . All fire hydrants , valves , pipe , fittings , and related materials will be supplied by the Town . The selected contractor shall be responsible for installation , excavation , backfill , restoration , and all associated construction activities required to complete the work . Project Scope and Development Expectations The Contractor shall furnish all labor , equipment , tools , traffic control , and incidentals necessary to remove and replace seven ( 7 ) existing fire hydrants within the Town ’ s municipal water distribution system . All hydrants , valves , pipes , fittings , and related materials will be supplied by the Town . The intent of this project is to provide the Town of Milton with fully installed and operational fire hydrants . A list of the hydrants included in this project is provided under the Supporting Documents section of this RFP . The work shall include , but not be limited to , the following : 1 . Coordination • Coordinate with the Town ’ s Water Department for scheduling and shutdowns . • The contractor must contact the Town Water Department to operate all valves pertaining to water main shutdowns . • The contractor must give at least 48 hours notice before any interruptions to the water service so that residents and businesses can be notified of possible disturbances . 2 . Hydrant Removal • Excavate to expose the existing hydrant assembly and lead . • Removal and proper disposal of existing hydrants 3 . Hydrant Installation • Install Town supplied hydrants and associated components in accordance with attached specifications • Set hydrant to final grade in accordance with Town standards • Ensure proper orientation of nozzles and breakaway flange installation 4 . Smart Hydrant Installation • Install one ( 1 ) K - 81 “ I ” Smart Hydrant ( Town - supplied ) on Main Street . • The Contractor is responsible for labor and physical installation only . Final setup , activation , and configuration of the smart technology will be completed by the Town . 5 . Surface Restoration • Backfill and compact excavation in accordance with Town standards . • Restore pavement , sidewalks , gravel shoulders , and lawn areas to preconstruction condition or better . 6 . Project Closeout • Remove all debris and excess materials from the site . |
Location
Country | United States of America (USA) |
State | Vermont |
Source
Source | Vermont Purchasing Group |
URL |
More Details
Record type | Tender |
Sector | Water Supply and Storage, Road, Government |
Article published date | 2026-04-28 |
Research
Free account
View all details
You are reading the public part. A free account opens the rest:
- Every detail on this tender
- News and media coverage
- Technical research
Free account · no card · lands you back on this tender
More Water Supply and Storage tenders in United States of America
- RFP - Thurston County Lake Management Districts Submerged Aquatic Vegetation Control
- Coatings for Wet Well and Manholes
- Sole Source for Wedeco UV BulbsBallets
- Security Hardware Services
- Chambers Creek Regional Wastewater Treatment Plant BNR Aeration Basin Airflow Meters
- Se Dixie Highway County Road A1A Utility Relocation Project
- UNPAINTED SNOW FENCE AND DUNE GRASS NO II
- PreQualification of Bidders for Chaboya Improvements
