logo

2026 Pierce RD HMA Overlay Proposal

One of 10,000+ tenders Taiyo tracks in Illinois.

Source: Illinois Purchasing Group

Tender
Closed

HMA overlay with other incidental work . Schedule for Single Bid ( For complete information covering these items , see plans and specifications .) Item Number Items Unit Quantity Unit Price Total Bit Materials ( Tack Coat ) Lb 6075 HMA Surface Removal ( Butt Jt ) Sq Yd 271 HMA SC , IL - 9 . 5 , Mix C , N50 Sp To

Status
Closed
Sector
Road
Location
Illinois, United States of America
Updated
3 Nov 2026
Source
Illinois Purchasing Group

ConstructChat

Ask ConstructChat about 2026 Pierce RD HMA Overlay Proposal

Pick a question to edit it, or write your own.

First answer free · no account

I am a

Tender Information FAQ

Tender Information

3 Q
The tender “2026 Pierce RD HMA Overlay Proposal” is a tender record in Taiyo, linked to the Road sector. It is issued for works, goods, or services related to Illinois, United States of America.

Participants

Not available for this record.

Status

Original status

closed

Taiyo status

Closed

Taiyo last update

2026-11-03

Contact

Not available for this record.

Description

Description

HMA overlay with other incidental work . Schedule for Single Bid ( For complete information covering these items , see plans and specifications .) Item Number Items Unit Quantity Unit Price Total Bit Materials ( Tack Coat ) Lb 6075 HMA Surface Removal ( Butt Jt ) Sq Yd 271 HMA SC , IL - 9 . 5 , Mix C , N50 Sp Ton 776 Agg Shoulders , Type B Ton 194 DESCRIPTION OF WORK The work of this section shall consist of placing a 1 ” lift of Hot Mix Asphalt Surface Course , IL - 9 . 5 , Mix “ C ”, N50 , Special and other incidental work on McGirr Road approximately 8 . 0 miles southeast of DeKalb , IL . The total distance of work for this project is 1 . 00 miles . HOT - MIX ASPHALT SURFACE REMOVAL – BUTT JOINT This work shall be done in accordance with Section 406 . 08 of the Standard Specifications . The work shall consist of milling the existing pavement at various locations throughout the project . The Butt Joints on McGirr Road shall be 1 . 0 ” deep tapered to 0 ” over 50 feet . The Butt Joint for side roads shall be 0 ” to 1 . 0 ” tapered over 25 feet terminating at the right of way line . The Butt Joints for the driveways shall be 1 . 0 " deep tapered to 0 ” over 3 feet and terminate at the right - of - way line or as directed by the Engineer . Any and all Temporary Ramps required by the Engineer as per Article 406 . 08 will be considered incidental to this pay item . Method of Measurement - Only that portion of the pavement that has been milled to a minimum depth of ¼ " will be measured for payment . This work , including all milling , hauling and disposal of the millings shall be paid for at the contract unit price per square yard for Hot - Mix Asphalt Surface Removal – Butt Joint . HOT MIX ASPHALT SURFACE COURSE , IL - 9 . 5 , MIX “ C ”, N50 , SPECIAL The work of this section shall consist of placing a 1 ” lift of Hot Mix Asphalt Surface Course , IL - 9 . 5 , Mix “ C ”, N50 , Special over the existing Hot Mix Asphalt on Keslinger Road . Local Quality Assurance / Quality Management QC / QA for HMA will be performed per LR1030 - 2 . Article 406 . 05 Preparation , Priming , and Leveling of HMA - The bituminous materials shall be applied per standard specifications or to the satisfaction of the Engineer prior to placement of the Hot - Mix Asphalt Surface Course , IL - 9 . 5 , Mixture “ C ”, N50 , Special . The Tack Coat shall be placed on any section of roadway no more than five days in advance of the placement of HMA . Article 406 . 14 Basis of Payment - This work shall be paid for at the contract unit price per pound for Bituminous Materials ( Tack Coat ). Hot Mix Asphalt Surface Course , IL - 9 . 5 , Mix “ C ”, N50 , Spcecial shall include Quality Control as per Section 1030 - 2 . PG Grade PG 64 - 22 Design Air Voids 4 % Mixture Composition IL 9 . 5 Friction Aggregate Mixture C Quantities are estimate prepared for the establishment of pay item prices and are the responsibility of the contractor to confirm prior to bidding . Quantities may be increased , decreased , or omitted to satisfactorily complete the project .

Location

Country

United States of America (USA)

State

Illinois

Source

Source

Illinois Purchasing Group

URL

More Details

Record type

Tender

Sector

Road

Article published date

2026-04-29

More on this tender

Research

Free account

View all details

You are reading the public part. A free account opens the rest:

  • Every detail on this tender
  • News and media coverage
  • Technical research
View all details

Free account · no card · lands you back on this tender