logo

2026 Pipe Lining Watertown CT

The scope, dates and status of this tender. A free account opens every field.

Source: Connecticut Purchasing Group

Tender
Closed

Work will be scheduled by the Town on an as - needed basis and may include CIPP installation for 12 , 15 ”, 18 ”, 20 ”, and 24 ” storm pipes of various materials . All pipes will be CCTV before work if video is not already available . Pipes are anticipated to be 25 % or less obstructed and typically req

Status
Closed
Sector
Hydro
Location
Connecticut, United States of America
Updated
3 Nov 2026
Source
Connecticut Purchasing Group

ConstructChat

Ask ConstructChat about 2026 Pipe Lining Watertown CT

Pick a question to edit it, or write your own.

First answer free · no account

I am a

Tender Information FAQ

Tender Information

3 Q
The tender “2026 Pipe Lining Watertown CT” is a tender record in Taiyo, linked to the Hydro sector. It is issued for works, goods, or services related to Connecticut, United States of America.

Participants

Not available for this record.

Status

Original status

closed

Taiyo status

Closed

Taiyo last update

2026-11-03

Contact

Not available for this record.

Description

Description

Work will be scheduled by the Town on an as - needed basis and may include CIPP installation for 12 , 15 ”, 18 ”, 20 ”, and 24 ” storm pipes of various materials . All pipes will be CCTV before work if video is not already available . Pipes are anticipated to be 25 % or less obstructed and typically require cleaning ( 1 – 2 hydro jet passes ) and light milling for standard light pipe preparation and cleaning before CIPP installation . The CIPP price will be for rough order of magnitude for mainline pipes and laterals if needed . This will be from catch basins and manholes access points . All lateral connections shall be reinstated using robotic cutter to reinstate all tied in serviced that were lined over . The total number of reinstatements is to be determined once the final jetting and descaling is performed . The estimates included in the bid are for Baldwin St , Belden St , Hillside Ave , and Wilson St . Each project on call that is over $ 100 , 000 . 00 is required to follow prevailing wages according to Connecticut General Statues 31 - 53 , 93 - 392 . The CIPP system should be covered for at least a 10 - year warranty . If additional CCTV ( closed circuit television ) work is required , the Town may authorize these services under the bid items included in the proposal schedule . This inspection will determine the condition of the pipe and be recorded for documentation . The contractor will follow standard compliance including NASSCO , PACP , MACP , LACP , WRc and ISYBAU . Inspection will be performed above the flow line using color video recording . A copy of the recorded video footage will be upload to a program similar to WinCan web as well as a condition report and invoice emailed .

Location

Country

United States of America (USA)

State

Connecticut

Source

Source

Connecticut Purchasing Group

URL

More Details

Record type

Tender

Sector

Hydro

Article published date

2026-03-27

More on this tender

Research

Free account

View all details

You are reading the public part. A free account opens the rest:

  • Every detail on this tender
  • News and media coverage
  • Technical research
View all details

Free account · no card · lands you back on this tender