logo

2026 Roofing

The scope, dates and status of this tender. A free account opens every field.

Source: MITN Purchasing Group

Tender
Closed

1 . The BASE BID includes roof recovery and / or full replacement work on roofs designated on drawings . 2 . New roof drain connections to existing system to be completed by others . DEMOLITION AND ROOF PREPARATION ( General ) A . Provide and maintain all temporary utilities , enclosures , fencing of construction area

Status
Closed
Sector
Power Transmission, Power Generation (CCGT), Steel, Commercial
Location
MITN, United States of America
Updated
3 Nov 2026
Source
MITN Purchasing Group

ConstructChat

Ask ConstructChat about 2026 Roofing

Pick a question to edit it, or write your own.

First answer free · no account

I am a

Tender Information FAQ

Tender Information

3 Q
The tender “2026 Roofing” is a tender record in Taiyo, linked to the Power Transmission sector. It is issued for works, goods, or services related to MITN, United States of America.

Participants

Not available for this record.

Status

Original status

closed

Taiyo status

Closed

Taiyo last update

2026-11-03

Contact

Not available for this record.

Description

Description

1 . The BASE BID includes roof recovery and / or full replacement work on roofs designated on drawings . 2 . New roof drain connections to existing system to be completed by others . DEMOLITION AND ROOF PREPARATION ( General ) A . Provide and maintain all temporary utilities , enclosures , fencing of construction areas , exterior protection , barricades , caution tape , temporary sanitary facilities , and ground protection as necessary and as required by in the General Conditions . B . Provide and maintain a watertight barrier against moisture entry into the building . The building must remain watertight . C . Provide protection of existing roof surfaces that will be trafficked over from staging point to the area of roof replacement . D . Provide temporary protection over interior finishes during roof installation . Protection shall consist of tarps . 3 . 02 DEMOLITION AND ROOF PREPARATION A . Prior to any demolition or roof preparation , Contractor shall work with the Owner to fully and completely “ map ” the locations of all existing electrical conduit and other clusters of “ wires ” that exist atop the structural steel and are in the raised ribs of the existing steel roof deck . B . Temporarily lift , move , and reset all utility conduits to allow for the scheduled roof replacement . For the purposes of the Base Bid , the work shall include the removal of the old wood blocking and the installation of new treated blocking supports and pipe clamps on a new membrane separator sheet to support the conduits

Location

Country

United States of America (USA)

State

MITN

Source

Source

MITN Purchasing Group

URL

More Details

Record type

Tender

Sector

Power Transmission, Power Generation (CCGT), Steel, Commercial

Article published date

2026-04-29

More on this tender

Research

Free account

View all details

You are reading the public part. A free account opens the rest:

  • Every detail on this tender
  • News and media coverage
  • Technical research
View all details

Free account · no card · lands you back on this tender