2026 Selective Roof Replacement for Fremont Elementary School
Closed · Missouri · Last reported Mar 2026
Source: Missouri Purchasing Group
Provide all labor and materials to replace the selected roof system for Fremont Elementary School , 2814 N . Fremont Ave ., Springfield , MO 65803 . Scope of Work 2026 Selective Roof Replacement for Fremont Elementary School 2814 N . Fremont Ave ., Springfield , MO 65803 Base Bid : Roof Sections 13 , 14 , 8 Gyp De
- Status
- Closed
- Sector
- Metal
- Location
- Missouri, United States of America
- Updated
- 3 Nov 2026
- Source
- Missouri Purchasing Group
ConstructChat
Ask ConstructChat about 2026 Selective Roof Replacement for Fremont Elementary School
Pick a question to edit it, or write your own.
First answer free · no account
Tender Information FAQ
Tender Information
Participants
| Not available for this record. |
Status
Original status | closed |
Taiyo status | Closed |
Taiyo last update | 2026-11-03 |
Contact
| Not available for this record. |
Description
Description | Provide all labor and materials to replace the selected roof system for Fremont Elementary School , 2814 N . Fremont Ave ., Springfield , MO 65803 . Scope of Work 2026 Selective Roof Replacement for Fremont Elementary School 2814 N . Fremont Ave ., Springfield , MO 65803 Base Bid : Roof Sections 13 , 14 , 8 Gyp Deck Phenolic Insulation 4 ½ ” – 5 ” Total Thickness ½ ” Wood Fiber ½ ” Buildup Gravel / Tar 3 ½ ” - 4 ” Insulation 1 . Remove drip edge , gutters , downspouts , reglet , scupper boxes , gutters , and any other necessary materials in preparation to receive new roofing system . 2 . Vac gravel from roof / clean and prepare roof to prepare for adhesion of new roofing system . 3 . Remove items as notated on deletion map . 4 . See Cricket Map for cricket installation . 5 . Adhere ½ ” HDF cover board , 50 mil PVC membrane , and any necessary accessories for complete new roof system . 6 . Scuppers , scupper boxes , gutters , and downspouts shall be replaced . Metal color to be bronze and match newer portion of roofing / confirmed my owner . See details on new gutter placement in the Design Details . 7 . Areas of large facia shall be replaced as well . See Design Details . Metal color to be bronze and match newer portion of roofing / confirmed my owner . 8 . Retrofit drains . 9 . Short parapet walls to be encapsulated . See Design Details . Sections between roofs 8 & 13 , 9 & 8 , 13 & 12 , and 11 & 13 . 10 . Reattach ladders that were removed . Ensure appropriate roof protection is under roof mount ladder to protect the membrane . 11 . Roof section 13 that connects to a small modified portion of roofing shall be covered as well . The expansion joint shall be encapsulated with enough membrane to allow movement . 12 . Encapsulate the old wall opening as noted in the Desing Details . 13 . Encapsulate the small triangle on roof 13 as noted in the Design Details . 14 . Ensure new gutter placement is corrected per the Design Details . 15 . Ensure tie in on the metal parapet wall is properly tied in to prevent leaks . 16 . Ensure tie in on parapet windows properly prevents leaks . |
Location
Country | United States of America (USA) |
State | Missouri |
Source
Source | Missouri Purchasing Group |
URL |
More Details
Record type | Tender |
Sector | Metal |
Article published date | 2026-04-29 |
Research
Free account
View all details
You are reading the public part. A free account opens the rest:
- Every detail on this tender
- News and media coverage
- Technical research
Free account · no card · lands you back on this tender
More Metal tenders in United States of America
- Token Creek Roof Replacements
- HVAC Ice Machine Servicing and Sheet Metal Fabrication
- Jail Courthouse Walkway Project
- RFP 887702021MF Rapid Response Fire Boat for Norfolk FireRescue
- Various Locations Sewer Replacement No. 9 [BID TABULATION]
- Millbrae Warehouse Loading Dock Repair
- Biosolids Digester Facilities - Southeast Treatment Plant T-...
- Electrical (C-10 License), San Francisco, San Mateo, Santa C...
