logo

2026 Selective Roof Replacement for Fremont Elementary School

Closed · Missouri · Last reported Mar 2026

Source: Missouri Purchasing Group

Tender
Closed

Provide all labor and materials to replace the selected roof system for Fremont Elementary School , 2814 N . Fremont Ave ., Springfield , MO 65803 . Scope of Work 2026 Selective Roof Replacement for Fremont Elementary School 2814 N . Fremont Ave ., Springfield , MO 65803 Base Bid : Roof Sections 13 , 14 , 8 Gyp De

Status
Closed
Sector
Metal
Location
Missouri, United States of America
Updated
3 Nov 2026
Source
Missouri Purchasing Group

ConstructChat

Ask ConstructChat about 2026 Selective Roof Replacement for Fremont Elementary School

Pick a question to edit it, or write your own.

First answer free · no account

I am a

Tender Information FAQ

Tender Information

3 Q
The tender “2026 Selective Roof Replacement for Fremont Elementary School” is a tender record in Taiyo, linked to the Metal sector. It is issued for works, goods, or services related to Missouri, United States of America.

Participants

Not available for this record.

Status

Original status

closed

Taiyo status

Closed

Taiyo last update

2026-11-03

Contact

Not available for this record.

Description

Description

Provide all labor and materials to replace the selected roof system for Fremont Elementary School , 2814 N . Fremont Ave ., Springfield , MO 65803 . Scope of Work 2026 Selective Roof Replacement for Fremont Elementary School 2814 N . Fremont Ave ., Springfield , MO 65803 Base Bid : Roof Sections 13 , 14 , 8 Gyp Deck Phenolic Insulation 4 ½ ” – 5 ” Total Thickness ½ ” Wood Fiber ½ ” Buildup Gravel / Tar 3 ½ ” - 4 ” Insulation 1 . Remove drip edge , gutters , downspouts , reglet , scupper boxes , gutters , and any other necessary materials in preparation to receive new roofing system . 2 . Vac gravel from roof / clean and prepare roof to prepare for adhesion of new roofing system . 3 . Remove items as notated on deletion map . 4 . See Cricket Map for cricket installation . 5 . Adhere ½ ” HDF cover board , 50 mil PVC membrane , and any necessary accessories for complete new roof system . 6 . Scuppers , scupper boxes , gutters , and downspouts shall be replaced . Metal color to be bronze and match newer portion of roofing / confirmed my owner . See details on new gutter placement in the Design Details . 7 . Areas of large facia shall be replaced as well . See Design Details . Metal color to be bronze and match newer portion of roofing / confirmed my owner . 8 . Retrofit drains . 9 . Short parapet walls to be encapsulated . See Design Details . Sections between roofs 8 & 13 , 9 & 8 , 13 & 12 , and 11 & 13 . 10 . Reattach ladders that were removed . Ensure appropriate roof protection is under roof mount ladder to protect the membrane . 11 . Roof section 13 that connects to a small modified portion of roofing shall be covered as well . The expansion joint shall be encapsulated with enough membrane to allow movement . 12 . Encapsulate the old wall opening as noted in the Desing Details . 13 . Encapsulate the small triangle on roof 13 as noted in the Design Details . 14 . Ensure new gutter placement is corrected per the Design Details . 15 . Ensure tie in on the metal parapet wall is properly tied in to prevent leaks . 16 . Ensure tie in on parapet windows properly prevents leaks .

Location

Country

United States of America (USA)

State

Missouri

Source

Source

Missouri Purchasing Group

URL

More Details

Record type

Tender

Sector

Metal

Article published date

2026-04-29

More on this tender

Research

Free account

View all details

You are reading the public part. A free account opens the rest:

  • Every detail on this tender
  • News and media coverage
  • Technical research
View all details

Free account · no card · lands you back on this tender