2026 Street Maintenance Program Crack and Chip Seal
Sector: Bridge • Location: Firestone, Colorado, United States of America
Source: Town of Firestone - Colorado
The Work for which the Bid is requested consists of : The work will consist of Chip and Crack Sealing on Arterial and Collector Streets , including preparation of road surfacing , patching , the surface treatment , fog seal , striping , thermoplastic and restoration as needed . Street Sweeping as directed by the
- Status
- Closed
- Sector
- Bridge, Cement, Road
- Location
- Firestone, Colorado, United States of America
- Updated
- 3 Nov 2026
- Source
- Town of Firestone - Colorado
ConstructChat
Ask ConstructChat about 2026 Street Maintenance Program Crack and Chip Seal
Pick a question to edit it, or write your own.
First answer free · no account
Tender Information FAQ
Tender Information
Participants
| Not available for this record. |
Status
Original status | closed |
Taiyo status | Closed |
Taiyo last update | 2026-11-03 |
Contact
| Not available for this record. |
Description
Description | The Work for which the Bid is requested consists of : The work will consist of Chip and Crack Sealing on Arterial and Collector Streets , including preparation of road surfacing , patching , the surface treatment , fog seal , striping , thermoplastic and restoration as needed . Street Sweeping as directed by the Town , and Resident Notification is required prior to start of work . This is in addition to a publicly held neighborhood information meeting . List of the roads to be chip sealed and approximate lengths :• Birch St ( CR 11 ) ~ 0 . 49 miles : From Sable Ave south to Town Limits • CR 26 ~ 0 . 93 miles : CR5 to the driveway connecting to the curve on CR 7List of the roads to be crack sealed and approximate lengths :• CR 9 . 5 / I - 25 Frontage Road ~ 1 . 31 miles : All asphalt portions ( Bridge N . to Ronald Reagan )• CR 9 . 5 / I - 25 Frontage Road ~ 1 . 02 miles : All concrete portions • CR 19 ~ 6 . 04 miles : SH66 to CR 18 • CR 26 ~ 0 . 98 miles : East of Colorado / Colorado Blvd to Frontier StAll existing striping and thermoplastics are to be reinstalled . Traffic control , resident notification , and Stormwater BMP compliance are required . The Top Ranked Contractor is responsible for tracking material used for payment . If the quantities specified in the unit price form are insufficient to complete the work , The contractor shall note that at the bottom of the bid tab under “ Please note any exceptions you take with this bid ”. All Towns Standards and Specifications are to be followed . This is to include the procedures outlined in the Town ’ s Street , Curb , and Gutter Maintenance / Replacement Standards and Specifications to ensure stormwater compliance , including installation and maintenance of stormwater control measures , which can be found here . See more |
Location
Country | United States of America (USA) |
State | Colorado |
City | Firestone |
Source
Source | Town of Firestone - Colorado |
URL |
More Details
Record type | Tender |
Sector | Bridge, Cement, Road |
Article published date | 2026-05-07 |
Research
Free account
View all details
You are reading the public part. A free account opens the rest:
- Every detail on this tender
- News and media coverage
- Technical research
Free account · no card · lands you back on this tender
