2026 Street Maintenance Program Mill and Overlay
One of 10,000+ tenders Taiyo tracks in Colorado.
Source: Town of Firestone - Colorado
The Work for which the Bid is requested consists of : The work will consist of a 2 ” mill and overlay and all associated work on Arterial Streets , including milling , disposal of material , patching , tack coating , overlay , striping , thermoplastic , and restoration as needed . Street Sweeping as directed by the
- Status
- Closed
- Sector
- Road
- Location
- Firestone, Colorado, United States of America
- Updated
- 3 Nov 2026
- Source
- Town of Firestone - Colorado
ConstructChat
Ask ConstructChat about 2026 Street Maintenance Program Mill and Overlay
Pick a question to edit it, or write your own.
First answer free · no account
Tender Information FAQ
Tender Information
Participants
| Not available for this record. |
Status
Original status | closed |
Taiyo status | Closed |
Taiyo last update | 2026-11-03 |
Contact
| Not available for this record. |
Description
Description | The Work for which the Bid is requested consists of : The work will consist of a 2 ” mill and overlay and all associated work on Arterial Streets , including milling , disposal of material , patching , tack coating , overlay , striping , thermoplastic , and restoration as needed . Street Sweeping as directed by the Town , and Resident Notification is required prior to start of work . This is in addition to a publicly held neighborhood information meeting . List of the roads to be milled and overlayed and approximate lengths :• Firestone Blvd ~ 0 . 72 mile : Frontage Road to Birch St • Jake Jabs Blvd ~ . 36 mile : Firestone Blvd south to endAll existing striping and thermoplastics are to be reinstalled . Traffic control , resident notification , and Stormwater BMP compliance are required . The Top Ranked Contractor is responsible for tracking material used for payment . If the quantities specified in the unit price form are insufficient to complete the work , The contractor shall note that at the bottom of the bid tab under “ Please note any exceptions you take with this bid ”. All Towns Standards and Specifications are to be followed . This is to include the procedures outlined in the Town ’ s Street , Curb , and Gutter Maintenance / Replacement Standards and Specifications to ensure stormwater compliance , including installation and maintenance of stormwater control measures , which can be found here . See more |
Location
Country | United States of America (USA) |
State | Colorado |
City | Firestone |
Source
Source | Town of Firestone - Colorado |
URL |
More Details
Record type | Tender |
Sector | Road |
Article published date | 2026-05-07 |
Research
Free account
View all details
You are reading the public part. A free account opens the rest:
- Every detail on this tender
- News and media coverage
- Technical research
Free account · no card · lands you back on this tender
More Road tenders in United States of America
- RFP - Pro-Tem Hearing Examiner
- NEW TIRES RETREADS AND TIRE SERVICES
- Professional Construction Engineering and Inspection CEI Services for the Williamson Boulevard Widening
- Lincoln Avenue Wascher to Killarney Preliminary Engineering Section 220065800PV
- KilleenFort Hood Regional Airport KFHRA Terminal Apron Rehabilitation Phase II
- IFB 947902022JM Screening 10 Asphalt Filter Stone 8 Granite Double Washed
- IFB 914202022AM Street Sweeper Parts and Brooms
- IFB 843402021AB Hay Alfalfa and Wheat Straw for Norfolk Zoo
