logo

2026 Sycamore RD HMA Overlay Proposal

One of 10,000+ tenders Taiyo tracks in Illinois.

Source: Illinois Purchasing Group

Tender
Closed

The work of this section shall consist of the application of 35 miles of seal coats to various County , Township and Municipality roads . GENERAL CONDITIONS No work to begin prior to June 15 , 2026 and all work is to be completed by July 24 , 2026 . If the work is not completed by the deadline sp

Status
Closed
Sector
Road
Location
Illinois, United States of America
Updated
3 Nov 2026
Source
Illinois Purchasing Group

ConstructChat

Ask ConstructChat about 2026 Sycamore RD HMA Overlay Proposal

Pick a question to edit it, or write your own.

First answer free · no account

I am a

Tender Information FAQ

Tender Information

3 Q
The tender “2026 Sycamore RD HMA Overlay Proposal” is a tender record in Taiyo, linked to the Road sector. It is issued for works, goods, or services related to Illinois, United States of America.

Participants

Not available for this record.

Status

Original status

closed

Taiyo status

Closed

Taiyo last update

2026-11-03

Contact

Not available for this record.

Description

Description

The work of this section shall consist of the application of 35 miles of seal coats to various County , Township and Municipality roads . GENERAL CONDITIONS No work to begin prior to June 15 , 2026 and all work is to be completed by July 24 , 2026 . If the work is not completed by the deadline specified above , the Calendar Day penalty charge per day as specified in Article 108 . 09 shall apply . Except for the DeKalb County roads , all intersections , paved / sealed entrances , mailbox turnouts , and paved / sealed field entrances within the limits of the single seal areas shall be sealed to the Right of Way . All intersections on DeKalb County roads within the limits of the single seal areas shall be sealed to the Right of Way . All intersections and private entrances within the limits of the double seal areas shall be sealed to the Right of Way . All mailbox turnouts and the first 3 feet of field entrances within the limits of the double seal areas shall be sealed . Bituminous Materials shall only be applied when the temperature of the air in the shade is 60 degrees Fahrenheit or above , unless otherwise approved by the Engineer . All county and township roads shall be swept by rotary broom or vacuum swept between 5 and 7 days of being seal coated . PROSECUTION OF WORK The Contractor shall notify the Engineer a minimum of two ( 2 ) working days ( i . e . notice given on Thursday AM for work to begin the following Monday ) prior to the commencement of any work which could be considered as a pay item in the contract . No payment will be made to the Contractor for any pay item work performed without the aforementioned notice being given unless otherwise approved by the Engineer . TRAFFIC CONTROL The County and Township roads to be single sealed may be closed to through traffic , if approved beforehand by the Engineer . If the Contractor elects to close the road ( s ), the closure shall be done in accordance with the applicable traffic standards included in this proposal , and adequate access and protection shall be provided for local residents . Any cost associated with this work or any and all traffic control standards included in this proposal shall be considered incidental to the pay items in this proposal . A - 1 SEAL COAT If the contractor elects to seal the entire road at once ( full width ) they shall be required to use an additional rubber - tired roller to properly seat the aggregate . BITUMINOUS MATERIAL ( FOG COAT ) The material used for the fog coat shall be CSS - 1 . The fog coat shall be applied in two passes , once from each direction , and be applied at a total rate of 0 . 15 gallon per square yard . The seal coat shall be applied to the existing road , the roadway shall then be swept between five and seven days , and then the fog coat shall be applied to the roadway the same day it was swept . All side roads shall be swept and fog coated as well . The contractor shall supply sufficient labor to maintain traffic while the fog coat is applied .

Location

Country

United States of America (USA)

State

Illinois

Source

Source

Illinois Purchasing Group

URL

More Details

Record type

Tender

Sector

Road

Article published date

2026-04-29

More on this tender

Research

Free account

View all details

You are reading the public part. A free account opens the rest:

  • Every detail on this tender
  • News and media coverage
  • Technical research
View all details

Free account · no card · lands you back on this tender