2026 WATER MAIN IMPROVEMENTS
The scope, dates and status of this tender. A free account opens every field.
Source: Illinois Purchasing Group
For all work included in this contract all the materials , labor , equipment , and incidentals needed to complete the work as described herein shall be included in the cost . This work includes the replacement of approximately 140 feet of water main at the south end of Belter Court . All the water main
- Status
- Closed
- Sector
- Road, Water Supply and Storage
- Location
- Illinois, United States of America
- Updated
- 3 Nov 2026
- Source
- Illinois Purchasing Group
ConstructChat
Ask ConstructChat about 2026 WATER MAIN IMPROVEMENTS
Pick a question to edit it, or write your own.
First answer free · no account
Tender Information FAQ
Tender Information
Participants
| Not available for this record. |
Status
Original status | closed |
Taiyo status | Closed |
Taiyo last update | 2026-11-03 |
Contact
| Not available for this record. |
Description
Description | For all work included in this contract all the materials , labor , equipment , and incidentals needed to complete the work as described herein shall be included in the cost . This work includes the replacement of approximately 140 feet of water main at the south end of Belter Court . All the water main and fittings shall be stamped " MADE fN THE USA ". This project also includes Pavement Maintenance ( crack filling ). The City will provide pH results of the soil testing and a list of the streets that will be cracked filled . The results of the soil sampling will be available when the City receives the results and the crack filling map will be provided to the Contractor at the Preconstruction Meeting . A new fire hydrant shall be added at the south end of the Cul - de - Sac and the existing fire hydrant shall be removed and delivered to the Public Works facility . After the water main is replaced the HMA pavement shall be repaired . |
Location
Country | United States of America (USA) |
State | Illinois |
Source
Source | Illinois Purchasing Group |
URL |
More Details
Record type | Tender |
Sector | Road, Water Supply and Storage |
Article published date | 2026-04-29 |
Research
Free account
View all details
You are reading the public part. A free account opens the rest:
- Every detail on this tender
- News and media coverage
- Technical research
Free account · no card · lands you back on this tender
More Road tenders in United States of America
- RFP - Pro-Tem Hearing Examiner
- NEW TIRES RETREADS AND TIRE SERVICES
- Professional Construction Engineering and Inspection CEI Services for the Williamson Boulevard Widening
- Lincoln Avenue Wascher to Killarney Preliminary Engineering Section 220065800PV
- KilleenFort Hood Regional Airport KFHRA Terminal Apron Rehabilitation Phase II
- IFB 947902022JM Screening 10 Asphalt Filter Stone 8 Granite Double Washed
- IFB 914202022AM Street Sweeper Parts and Brooms
- IFB 843402021AB Hay Alfalfa and Wheat Straw for Norfolk Zoo
