20814 363rd Lane , McGregor IHS Septic
The scope, dates and status of this tender. A free account opens every field.
Source: Minnesota Purchasing Group
1 . Install an on - site septic system per the approved septic design provided by Environmental Systems dated 7 / 26 / 24 . Contractor shall ensure a complete and functional system . 2 . Contractor is responsible for removal of the existing mound in its entirety . All materials to be disposed of offsite . 3 . The
- Status
- Closed
- Sector
- Road
- Location
- Minnesota, United States of America
- Updated
- 3 Nov 2026
- Source
- Minnesota Purchasing Group
ConstructChat
Ask ConstructChat about 20814 363rd Lane , McGregor IHS Septic
Pick a question to edit it, or write your own.
First answer free · no account
Tender Information FAQ
Tender Information
Participants
| Not available for this record. |
Status
Original status | closed |
Taiyo status | Closed |
Taiyo last update | 2026-11-03 |
Contact
| Not available for this record. |
Description
Description | 1 . Install an on - site septic system per the approved septic design provided by Environmental Systems dated 7 / 26 / 24 . Contractor shall ensure a complete and functional system . 2 . Contractor is responsible for removal of the existing mound in its entirety . All materials to be disposed of offsite . 3 . The existing tank must remain in place during mound removal , drying and construction of new mound . Contractor shall be responsible for pumping the tank throughout construction . Contractor shall include cost to pump tank 4 times ( completely full ) during the project . Any difference in pumping shall be credited back ; or added if additional pumping can be proven and was necessary due to drying time . 4 . After new mound is in place , the contractor shall have the existing septic tanks pumped and crushed or filled . Contractor shall assume existing tank holds up to 2 , 500 gallons . Contractor shall complete tank abandonment form and submit a copy to the Project Coordinator . 5 . Contractor shall be responsible for obtaining an AItkin County septic permit and coordinating required inspections . 6 . Contractor shall be responsible for contacting the Aitkin County inspector to schedule inspection of scratch , tanks , rock bed and final cover . 7 . Additionally , contractor must give the I . H . S . Engineer and Carla Dunkley , Project Manager , a minimum of 48 hour notice before starting the installation to schedule project site visits to see scratch , tanks and rock bed before covering . 8 . Contractor shall provide an As - Built System drawing for submission to MLBO . 9 . Contractor will not receive final payment until Aitkin County has completed a successful final inspection and issued a Certificate of Compliance ; any punch list items from the Owner or I . H . S . Engineer have been completed ; and Owner has been supplied with full lien waivers for all subcontractors and suppliers . 10 . Contractor is responsible for cutting vegetation and tree removal as required to install the system in accordance to MN Chapter 7080 . Contractor is responsible to cutting trees located within the mound foot print and immediately around the mound , as needed to access the area to construct said mound . Trees shall be cut flush with the ground . Any trees measuring 6 ” or more in diameter shall be cut into 8 ’ sections and hauled to the DNR shed located on Hwy 65 next to the D2 PowWow Grounds . Smaller trees or brush cleared can either be chipped or hauled away for offsite disposal |
Location
Country | United States of America (USA) |
State | Minnesota |
Source
Source | Minnesota Purchasing Group |
URL |
More Details
Record type | Tender |
Sector | Road |
Article published date | 2026-04-29 |
Research
Free account
View all details
You are reading the public part. A free account opens the rest:
- Every detail on this tender
- News and media coverage
- Technical research
Free account · no card · lands you back on this tender
More Road tenders in United States of America
- RFP - Pro-Tem Hearing Examiner
- NEW TIRES RETREADS AND TIRE SERVICES
- Professional Construction Engineering and Inspection CEI Services for the Williamson Boulevard Widening
- Lincoln Avenue Wascher to Killarney Preliminary Engineering Section 220065800PV
- KilleenFort Hood Regional Airport KFHRA Terminal Apron Rehabilitation Phase II
- IFB 947902022JM Screening 10 Asphalt Filter Stone 8 Granite Double Washed
- IFB 914202022AM Street Sweeper Parts and Brooms
- IFB 843402021AB Hay Alfalfa and Wheat Straw for Norfolk Zoo
