logo

23Nw Percussion Lane Road Project

Bids closed Mar 2026 · Pennsylvania · Last reported Mar 2026

Source: Pennsylvania Purchasing Group

Tender
Closed

The Pennsylvania Game Commission ( PGC ) is soliciting electronic Bids to provide access road maintenance on State Game Lands ( SGL ) 024 in Farmington Township , Clarion County . The scope of the project generally includes construction , and related work on approximately 2 , 702 linear feet of new access road acros

Status
Closed
Sector
Water Supply and Storage, Road
Location
Pennsylvania, United States of America
Updated
3 Nov 2026
Source
Pennsylvania Purchasing Group

ConstructChat

Ask ConstructChat about 23Nw Percussion Lane Road Project

Pick a question to edit it, or write your own.

First answer free · no account

I am a

Tender Information FAQ

Tender Information

3 Q
The tender “23Nw Percussion Lane Road Project” is a tender record in Taiyo, linked to the Water Supply and Storage sector. It is issued for works, goods, or services related to Pennsylvania, United States of America.

Participants

Not available for this record.

Status

Original status

closed

Taiyo status

Closed

Taiyo last update

2026-11-03

Contact

Not available for this record.

Description

Description

The Pennsylvania Game Commission ( PGC ) is soliciting electronic Bids to provide access road maintenance on State Game Lands ( SGL ) 024 in Farmington Township , Clarion County . The scope of the project generally includes construction , and related work on approximately 2 , 702 linear feet of new access road across 2 segments , resurfacing and related work on approximately 5 , 670 linear feet of existing roadway across 3 segments . SCOPE OF WORK – SEQUENCE OF CONSTRUCTION Refer to the Technical Specifications for material requirements and construction / installation procedures for the different items of work . A . Section A of Project ( 2 , 638 feet ) A . 1 Provide Soil Erosion and Sedimentation Control BMPs as required and specified and as directed by PGC staff . Implement , maintain , modify , and add controls as required during construction to address and prevent erosion issues . Maintain an updated and current copy of the plan on - site at all times . A . 2 . Grade and shape roads to a minimum 16 - feet wide ditch line to ditch line with a 12 - foot cartway width . Establish centerline crown shape with 6 % cross slopes as specified and as shown on the drawings / details . A . 2 . 1 Clean out and grade ditch lines that direct surface water runoff flow to turnouts or culverts . Reestablish and extend turnouts and culvert tail ditches to direct runoff away from the road and to allow free gravity flow to eliminate ponding . A . 2 . 2 Provide new turnouts and broad - based dips as required and as directed by PGC staff to provide positive drainage and to control and direct stormwater runoff away from roadway . A . 2 . 3 Compact graded and shaped roadway with a 10 - Ton ( minimum ) single smooth drum vibratory roller . A . 2 . 4 Top Roadway with 4 inches of Limestone as directed , Compact graded and shaped roadway with a 10 - Ton ( minimum ) single smooth drum vibratory roller . B . Section B of Project ( 1 , 212 feet ) B . 1 Provide Soil Erosion and Sedimentation Control BMPs as required and specified and as directed by PGC staff . Implement , maintain , modify , and add controls as required during construction to address and prevent erosion issues . Maintain an updated and current copy of the plan on - site at all times . B . 2 . Grade and shape roads to a minimum 16 - feet wide ditch line to ditch line with a 12 - foot cartway width . Establish centerline crown shape with 6 % cross slopes as specified and as shown on the drawings / details . B . 2 . 1 Clean out and grade ditch lines that direct surface water runoff flow to turnouts or culverts . Reestablish and extend turnouts and culvert tail ditches to direct runoff away from the road and to allow free gravity flow to eliminate ponding . B . 2 . 3 Compact graded and shaped roadway with a 10 - Ton ( minimum ) single smooth drum vibratory roller . B . 3 Top Roadway with 4 inches of Limestone as directed , Compact graded and shaped roadway with a 10 - Ton ( minimum ) single smooth drum vibratory roller . C . Section C of Project ( 923 feet ) C . 1 Provide Soil Erosion and Sedimentation Control BMPs as required and specified and as directed by PGC staff . Implement , maintain , modify , and add controls as required during construction to address and prevent erosion issues . Maintain an updated and current copy of the plan on - site at all times . C . 2 . Grade and shape roads to a minimum 16 - feet wide ditch line to ditch line with a 12 - foot cartway width . Establish centerline crown shape with 6 % cross slopes as specified an as shown on the drawings / details . C . 3 . Apply Geotech fabric to roadway . C . 4 . 1 . Use Borrow pit stone to build up 923 LF of road surface 12 - feet wide x 12 inches compacted depth minimum . Maintain centerline crown shape with 6 % cross slopes . Compact with a 10 - Ton ( minimum ) single smooth drum vibratory roller . C . 5 Top Roadway with 4 inches of Limestone as directed , Compact graded and shaped roadway with a 10 - Ton ( minimum ) single smooth drum vibratory roller . C . 5 . 1 Clean out and grade ditch lines that direct surface water runoff flow to turnouts or culverts . Reestablish and extend turnouts and culvert tail ditches to direct runoff away from the road and to allow free gravity flow to eliminate ponding . C . 5 . 2 Provide new turnouts and broad - based dips as required and as directed by PGC staff to provide positive drainage and to control and direct stormwater runoff away from roadway . C . 5 . 3 Compact graded and shaped roadway with a 10 - Ton ( minimum ) single smooth drum vibratory roller . C . 5 . 4 Top Roadway with 4 inches of Limestone as directed , Compact graded and shaped roadway with a 10 - Ton ( minimum ) single smooth drum vibratory roller . D . Section D of Project ( 1 , 779 feet ) D . 1 Provide Soil Erosion and Sedimentation Control BMPs as required and specified and as directed by PGC staff . Implement , maintain , modify , and add controls as required during construction to address and prevent erosion issues . Maintain an updated and current copy of the plan on - site at all times . D . 2 . Grade and shape roads to a minimum 16 - feet wide ditch line to ditch line with a 12 - foot cartway width . Establish centerline crown shape with 6 % cross slopes as specified and as shown on the drawings / details . D . 3 . 1 . Use Borrow pit stone to build up 1779 LF of road surface 12 - feet wide x 12 inches compacted depth minimum . Maintain centerline crown shape with 6 % cross slopes . Compact with a 10 - Ton ( minimum ) single smooth drum vibratory roller .

Location

Country

United States of America (USA)

State

Pennsylvania

Source

Source

Pennsylvania Purchasing Group

URL

More Details

Record type

Tender

Sector

Water Supply and Storage, Road

Article published date

2026-05-09

More on this tender

Research

Free account

View all details

You are reading the public part. A free account opens the rest:

  • Every detail on this tender
  • News and media coverage
  • Technical research
View all details

Free account · no card · lands you back on this tender