26 - 0225 Facility Master Plan Series 5 Additions
One of 3,321 tenders Taiyo tracks in MITN.
Source: MITN Purchasing Group
The scope of work shall INCLUDE , but not be limited to , furnishing and installing the following : 1 . All materials , labor , equipment , samples , shop drawings , engineering , layout , supplies , plant , tools , contributions , insurance , taxes , compliance with all agencies ( City , County , State , and Federal as may be requ
- Status
- Closed
- Sector
- Water Supply and Storage, Commercial
- Location
- MITN, United States of America
- Updated
- 3 Nov 2026
- Source
- MITN Purchasing Group
ConstructChat
Ask ConstructChat about 26 - 0225 Facility Master Plan Series 5 Additions
Pick a question to edit it, or write your own.
First answer free · no account
Tender Information FAQ
Tender Information
Participants
| Not available for this record. |
Status
Original status | closed |
Taiyo status | Closed |
Taiyo last update | 2026-11-03 |
Contact
| Not available for this record. |
Description
Description | The scope of work shall INCLUDE , but not be limited to , furnishing and installing the following : 1 . All materials , labor , equipment , samples , shop drawings , engineering , layout , supplies , plant , tools , contributions , insurance , taxes , compliance with all agencies ( City , County , State , and Federal as may be required ) all other services and facilities , and other things necessary for the performance of the work as shown , detailed , and / or implied by the Contract Documents and as defined herein . 2 . Any selective demolition permits required by the City of Detroit shall be the responsibility of this contractor . 3 . All selective demolition and removal of designated portions of the building or structure . 4 . Demolition of Mechanical , Electrical and Plumbing systems to be included . 5 . Protection of all existing elements and systems designated to remain . 6 . Maintain utilities and fire - protection systems during demolition . 7 . Provide temporary weather protection and temporary enclosure as needed including protection from water infiltration . 8 . Design and maintain shoring / bracing . Strengthen supports as required . 9 . Minimize disruption to adjacent walkways , streets , occupied areas . 10 . Remove flooring and adhesive per RFCI Work Practices . 11 . Prepare remaining substrates to receive new finishes per finish schedule and manufacturer installation requirements . 12 . Dispose of materials at EPA ‑ approved landfill . Do not allow accumulation of debris . 13 . Clean adjacent surfaces , structures , and improvements of dust , debris , and residue . |
Location
Country | United States of America (USA) |
State | MITN |
Source
Source | MITN Purchasing Group |
URL |
More Details
Record type | Tender |
Sector | Water Supply and Storage, Commercial |
Article published date | 2026-04-29 |
Research
Free account
View all details
You are reading the public part. A free account opens the rest:
- Every detail on this tender
- News and media coverage
- Technical research
Free account · no card · lands you back on this tender
More Water Supply and Storage tenders in United States of America
- RFP - Thurston County Lake Management Districts Submerged Aquatic Vegetation Control
- Coatings for Wet Well and Manholes
- Sole Source for Wedeco UV BulbsBallets
- Security Hardware Services
- Chambers Creek Regional Wastewater Treatment Plant BNR Aeration Basin Airflow Meters
- Se Dixie Highway County Road A1A Utility Relocation Project
- UNPAINTED SNOW FENCE AND DUNE GRASS NO II
- PreQualification of Bidders for Chaboya Improvements
