26 - 0229 New Pershing High School Bid Release 2B
The scope, dates and status of this tender. A free account opens every field.
Source: MITN Purchasing Group
SUMMARY PART 1 GENERAL 1 . 01 PROJECT A . Project Name : Pershing HS - DPSCD B . Owner ' s Name : Detroit Public Schools Community District . C . Architect ' s Name : Quinn Evans . D . Additional Project contact information is specified in Section 000103 - Project Directory . E . The Project consists of the construction o
- Status
- Closed
- Sector
- Power Transmission, Power Generation (CCGT), Car parking, Commercial, Automotive
- Location
- MITN, United States of America
- Updated
- 3 Nov 2026
- Source
- MITN Purchasing Group
ConstructChat
Ask ConstructChat about 26 - 0229 New Pershing High School Bid Release 2B
Pick a question to edit it, or write your own.
First answer free · no account
Tender Information FAQ
Tender Information
Participants
| Not available for this record. |
Status
Original status | closed |
Taiyo status | Closed |
Taiyo last update | 2026-11-03 |
Contact
| Not available for this record. |
Description
Description | SUMMARY PART 1 GENERAL 1 . 01 PROJECT A . Project Name : Pershing HS - DPSCD B . Owner ' s Name : Detroit Public Schools Community District . C . Architect ' s Name : Quinn Evans . D . Additional Project contact information is specified in Section 000103 - Project Directory . E . The Project consists of the construction of a one story 100 , 800 SF new High School Building and adjacent site / parking .. 1 . 02 CONTRACT DESCRIPTION A . Contract Type : Multiple prime contracts each based on a Stipulated Price as described in Document 005200 - Agreement Form . 1 . 03 WORK BY OWNER A . Existing Building Demolition : Owner has contracted for demolition of the existing structure on site and removal of its foundations . The site will be backfilled at the removed foundations and filled to existing grade elevation . Work will be completed in a separate bid package . B . Items noted NIC ( Not in Contract ) will be supplied and installed by Owner before Date of Substantial Completion . Some items include : 1 . Movable cabinets . 2 . Furnishings . 3 . Small equipment . 4 . Rugs . 5 . Artwork . 1 . 04 OWNER OCCUPANCY A . Owner intends to continue to occupy adjacent portions of the building site during the entire construction period . B . Owner intends to occupy the Project upon Substantial Completion . C . Cooperate with Owner to minimize conflict and to facilitate Owner ' s operations . D . Schedule the Work to accommodate Owner occupancy . 1 . 05 CONTRACTOR USE OF SITE AND PREMISES A . Construction Operations : Limited to areas noted on Drawings . 1 . Locate and conduct construction activities in ways that will limit disturbance to active high school program . B . Arrange use of site and premises to allow : 1 . Owner occupancy . 2 . Work by Others . C . Provide access to and from site as required by law and by Owner : 1 . Emergency Building Exits During Construction : Keep all exits required by code open during construction period ; provide temporary exit signs if exit routes are temporarily altered . 2 . Do not obstruct roadways , sidewalks , or other public ways without permit . D . Existing building spaces may not be used for storage . E . Utility Outages and Shutdown : 1 . Limit disruption of utility services to hours the building is unoccupied . 2 . Do not disrupt or shut down life safety systems , including but not limited to fire sprinklers and fire alarm system , without 7 days notice to Owner and authorities having jurisdiction . |
Location
Country | United States of America (USA) |
State | MITN |
Source
Source | MITN Purchasing Group |
URL |
More Details
Record type | Tender |
Sector | Power Transmission, Power Generation (CCGT), Car parking, Commercial, Automotive |
Article published date | 2026-04-29 |
Research
Free account
View all details
You are reading the public part. A free account opens the rest:
- Every detail on this tender
- News and media coverage
- Technical research
Free account · no card · lands you back on this tender
