26 - 48D LAKE SHORE MIDDLE SCHOOL - ROOFING
The scope, dates and status of this tender. A free account opens every field.
Source: Palm Beach Schools (PALMBEACHSCHOOLS)
The School Board of Palm Beach County , Florida invitesCertified Roofing Contractors prequalified by the School Boardpursuant to SREF Chapter 4 . 1 prior to the Bid Due Date to submit a Bid . To be eligible , the vendor must be prequalified for bonding capacity in the amount of the advertised Construction
- Status
- Closed
- Sector
- Road, Water Supply and Storage, Telecommunications, Metal, Residential, Commercial
- Location
- Palm Beach, Palmbeachschools, United States of America
- Updated
- 3 Nov 2026
- Source
- Palm Beach Schools (PALMBEACHSCHOOLS)
ConstructChat
Ask ConstructChat about 26 - 48D LAKE SHORE MIDDLE SCHOOL - ROOFING
Pick a question to edit it, or write your own.
First answer free · no account
Tender Information FAQ
Tender Information
Participants
| Not available for this record. |
Status
Original status | closed |
Taiyo status | Closed |
Taiyo last update | 2026-11-03 |
Contact
| Not available for this record. |
Description
Description | The School Board of Palm Beach County , Florida invitesCertified Roofing Contractors prequalified by the School Boardpursuant to SREF Chapter 4 . 1 prior to the Bid Due Date to submit a Bid . To be eligible , the vendor must be prequalified for bonding capacity in the amount of the advertised Construction Budget or evidence bonding capacity in that amount prior to the Bid due date . The School District of Palm Beach County , Florida , will receive ( viaBidNet Direct @ www . bidnetdirect . com ) sealed Bids for : Project Name : LAKE SHORE MIDDLE SCHOOL - ROOFINGPROJECT ADDRESS : 425 WEST CANAL STREETBELLE GLADE , FL 33430ITB NO .: 26 - 48DPROJECT NO .: 1232 - 2503ESTABLISHED PROJECT BUDGET FOR CONSTRUCTION : $ 4 , 170 , 000 . 00PROCUREMENT SCHEDULEMANDATORY SITE INSPECTION : JANUARY 13 , 2026 at 9 : 00 A . M ., ESTQUESTIONS DUE : JANUARY 19 , 2026 , NO LATER THAN 2 : 00 P . M ., EST viaBidNet Direct @ www . bidnetdirect . comFINAL ADDENDUM ISSUED : JANUARY 26 , 2026 viaBidNet Direct @ www . bidnetdirect . comBIDS DUE : FEBRUARY 2 , 2026 , NO LATER THAN 2 : 00 P . M ., EST viaBidNet Direct @ www . bidnetdirect . comMANDATORY SITE INSPECTIONEach Bidder must attend a Mandatory Site Inspection at the project location to be eligible to submit a Bid . Site inspection will be held onJANUARY 13 , 2026as scheduled : LAKE SHORE MIDDLE SCHOOL425 WEST CANAL STREETBELLE GLADE , FL 33430MEET IN FRONT OFFICE AND SIGN INDIRECTIONS : I - 95 to Southern Blvd . West on SR 80 approx . 40 miles to SR 441 . Turn left & continue to Canal St ., then turn right . School on right . BID GUARANTEEEach Bid shall be accompanied by a Bid Guarantee in the amount of $ 208 , 500 . 00 . The Guarantee shall be in the form of either a Bid Bond or Cashier ’ s Check payable to The School District of Palm Beach County . All Bidders must be licensed pursuant to Chapter 489Florida Statutes . The successful Bidder will be required to furnish a 100 % Performance Bond . No Bid may be withdrawn after the scheduled closing for receipt of Bids for a period of 60 days . The Board or its designee reserves the right to waive minor technicalities and irregularities in all Bids . Further , in order to protect the integrity of the Award Process , all questions regarding this solicitation must be submitted viaBidNet Direct @ www . bidnetdirect . comNO LATER THAN 2 : 00 P . M ., EST on JANUARY 19 , 2026 . Only questions received viaBidNet Direct @ www . bidnetdirect . comby the time and date specified will be answered by Addendum and posted on BidNet Direct . The project scope includes but is not limited to : Re - roofing existing buildings 1 - 7 of Lake Shore Middle School , approximately 156 , 700 SF . The project will involve the removal of the existing roof to the existing metal deck ( metal deck to remain ). Contractor to provide a new roof system on top of the existing metal deck comprised of a minimum r - 20 rigid insulation , 5 / 8 ” plywood sheathing , self - adhering ice & water shield , 30 # felt double underlayment and fabric reinforced shingles ( Basis of design : Tamko XT shingles or approved equivalent ). Remove & replace roof over the existing metal roof deck w / new shingle roof . Prepare existing deck for new roof ( brush / clean apply anti - rust treatment as needed ). Provide pressure treated wood furring around roof edges for raised height of roof insulation . Remove & replace all roofing metals such as drip edges , valley flashings , expansion joints , counter flashings , etc . Remove & replace all gutters w / min . . 040 Kynar finished alum . – approx . 3300 linear ft . total . Remove & replace all downspouts w / min . . 040 Kynar finished alum . – 102 downspouts , approx . 1020 linear ft . total . Paint & patch all stucco / EIFS ( Exterior Insulation & Finish Systems ) walls to match existing where ever affected by roofing work . Remove & replace all roof hatches in - kind & provide new safety rails – ( 3 ) locations . Remove & replace all goosenecks & gooseneck curbs – ( 32 ) locations . Remove & replace all unit ventilators & unit ventilator curbs – ( 8 ) locations . Temporary removal of all exhaust fans – remove & replace all exhaust fan curbs , re - install temporarily removed exhaust fans onto the new curbs – ( 5 ) locations . Provide hurricane tie - downs to all roof equipment . Re - route kitchen exhaust fan conduit through new roof penetration , provide new receptacle and support post @ kitchen exhaust fan – ( 1 ) location . Raise existing plumbing vents as necessary to be 8 ” min . above new roof finish . Reroute existing plumbing vents through new roof penetrations min . 10 ’ away from existing roof intakes ( enclose roof decks @ existing penetrations , patch / paint / repairs ceilings & walls affected by the work ) – ( 7 ) locations . Reroute existing flue vents through new roof penetrations min . 10 ’ away from existing roof intakes ( enclose roof decks @ existing penetrations , patch / paint / repairs ceilings & walls affected by the work ) – ( 1 ) location . Remove abandoned flue vent , provide roof deck enclosure – ( 1 ) locationProvide new raised curb on roof for downspout attachment – ( 2 ) locationsExisting buildings do not have lightning protection . Providing a new lightning protection system is not necessaryADDITIONAL PROJECT INFORMATION : BALANCE OF LINE : The “ balance of line ” shall include products and services that are not requested in this . Invitation to Bid , but are within the scope of products and services available from the awardee ( s ). The School District reserves the right to add these products and services to the awarded items . Additions shall be submitted as they occur . Deletions and discontinued items shall be reported by bid awarded vendor as they occur . Refer to Additional Information Document . All materials should be based on the School District Specifications , which includes an approved equal . Any existing lightning protection equipment shall be removed and reinstalled . The reinstalled lightning protection system shall be re - certified in accordance with NFPA 780 , UL 96A , and Design and Material Standards Section 26 41 00 . Provide UL Master Label to the owner upon completion . Provide ( Furnish and Install ) extensions / increases , including but not limited to cabling , air terminals , down conductors , ground rods , surge protective devices at switchgear , etc . to the existing system for the re - installed system to work as a complete , operational system upon completion of the work . Security signage is not included in this bid , and shall not be included in the pricing . The Contractor shall be responsible for the repair or replacement , including but not limited to : all surfaces , building elements , fencing , utilities , onsite and offsite elements , sidewalks , grasses , plantings , irrigation , and hardscape disturbed by and / or damaged by construction activities . If required , the Contractor will remove and / or modify chain link fencing , including adding gate ( s ), as needed for site access . Openings in the fence shall be secured at the end of each workday . Fencing is to be restored to equal or better condition upon completion of the work . All work during the summer can be completed during the day or night per the SPA / School approval . The schedule will still have to be worked out with the school as summer activities will be happening on - site . During the school year , work can be performed after the school day is completed but the schedule will have to be coordinated with school staff as there are activities at night . Holidays and weekends can be day or night work however , the Contractor will still need to coordinate with school staff & SPA as activities are sometimes scheduled during these times . All work shall be performed in accordance with the Florida Building Code 2023 , Florida Building Code 2023 8th ed , District Master Specifications , 2023 , and the ANSI / AWWA C210 ‐ 84 . Clean ‐ up and disposal of all debris generated during the Project . Final inspection to ensure compliance with building codes , manufacturer specifications , and project requirements . See more |
Location
Country | United States of America (USA) |
State | Palmbeachschools |
City | Palm Beach |
Source
Source | Palm Beach Schools (PALMBEACHSCHOOLS) |
URL |
More Details
Record type | Tender |
Sector | Road, Water Supply and Storage, Telecommunications, Metal, Residential, Commercial |
Article published date | 2026-04-08 |
Research
Free account
View all details
You are reading the public part. A free account opens the rest:
- Every detail on this tender
- News and media coverage
- Technical research
Free account · no card · lands you back on this tender
More Road tenders in United States of America
- RFP - Pro-Tem Hearing Examiner
- NEW TIRES RETREADS AND TIRE SERVICES
- Professional Construction Engineering and Inspection CEI Services for the Williamson Boulevard Widening
- Lincoln Avenue Wascher to Killarney Preliminary Engineering Section 220065800PV
- KilleenFort Hood Regional Airport KFHRA Terminal Apron Rehabilitation Phase II
- IFB 947902022JM Screening 10 Asphalt Filter Stone 8 Granite Double Washed
- IFB 914202022AM Street Sweeper Parts and Brooms
- IFB 843402021AB Hay Alfalfa and Wheat Straw for Norfolk Zoo
