26 - 62D WEST GATE ELEMENTARY SCHOOL - ROOFING
Sector: Water Supply and Storage • Location: Palm Beach, Palmbeachschools, United States of America
Source: Palm Beach Schools (PALMBEACHSCHOOLS)
The School Board of Palm Beach County , Florida invitesCertified Roofing Contractors prequalified by the School Boardpursuant to SREF Chapter 4 . 1 prior to the Bid Due Date to submit a Bid . To be eligible , the vendor must be prequalified for bonding capacity in the amount of the advertised Construction
- Status
- Closed
- Sector
- Water Supply and Storage, Wind, Telecommunications, Metal, Commercial, Cement, Residential
- Location
- Palm Beach, Palmbeachschools, United States of America
- Updated
- 3 Nov 2026
- Source
- Palm Beach Schools (PALMBEACHSCHOOLS)
ConstructChat
Ask ConstructChat about 26 - 62D WEST GATE ELEMENTARY SCHOOL - ROOFING
Pick a question to edit it, or write your own.
First answer free · no account
Tender Information FAQ
Tender Information
Participants
| Not available for this record. |
Status
Original status | closed |
Taiyo status | Closed |
Taiyo last update | 2026-11-03 |
Contact
| Not available for this record. |
Description
Description | The School Board of Palm Beach County , Florida invitesCertified Roofing Contractors prequalified by the School Boardpursuant to SREF Chapter 4 . 1 prior to the Bid Due Date to submit a Bid . To be eligible , the vendor must be prequalified for bonding capacity in the amount of the advertised Construction Budget or evidence bonding capacity in that amount prior to the Bid due date . The School District of Palm Beach County , Florida , will receive ( viaBidNet Direct @ www . bidnetdirect . com ) sealed Bids for : Project Name : WEST GATE ELEMENTARY SCHOOL - ROOFINGPROJECT ADDRESS : 1545 LOXAHATCHEE DRIVEWEST PALM BEACH , FL 33409ITB NO .: 26 - 62DPROJECT NO .: 0481 - 2503ESTABLISHED PROJECT BUDGET FOR CONSTRUCTION : $ 2 , 310 , 000 . 00PROCUREMENT SCHEDULEMANDATORY SITE INSPECTION : APRIL 7 , 2026 at 9 : 00 A . M ., ESTQUESTIONS DUE : APRIL 13 , 2026 , NO LATER THAN 2 : 00 P . M ., EST viaBidNet Direct @ www . bidnetdirect . comFINAL ADDENDUM ISSUED : APRIL 20 , 2026 viaBidNet Direct @ www . bidnetdirect . comBIDS DUE : APRIL 27 , 2026 , NO LATER THAN 2 : 00 P . M ., EST viaBidNet Direct @ www . bidnetdirect . comMANDATORY SITE INSPECTIONEach Bidder must attend a Mandatory Site Inspection at the project location to be eligible to submit a Bid . Site inspection will be held onAPRIL 7 , 2026as scheduled : WEST GATE ELEMENTARY SCHOOL1545 LOXAHATCHEE DRIVWEST PALM BEACH , FL 33409MEET IN FRONT OFFICE AND SIGN INDIRECTIONS : I - 95 to Okeechobee West to Congress Ave . South one block to Westgate Ave . West three blocks to Osceola Dr . South two blocks , school is on left . BID GUARANTEEEach Bid shall be accompanied by a Bid Guarantee in the amount of $ 115 , 500 . 00 . The Guarantee shall be in the form of either a Bid Bond or Cashier ’ s Check payable to The School District of Palm Beach County . All Bidders must be licensed pursuant to Chapter 489Florida Statutes . The successful Bidder will be required to furnish a 100 % Performance Bond . No Bid may be withdrawn after the scheduled closing for receipt of Bids for a period of 60 days . The Board or its designee reserves the right to waive minor technicalities and irregularities in all Bids . Further , in order to protect the integrity of the Award Process , all questions regarding this solicitation must be submitted viaBidNet Direct @ www . bidnetdirect . comNO LATER THAN 2 : 00 P . M ., EST on APRIL 13 , 2026 . Only questions received viaBidNet Direct @ www . bidnetdirect . comby the time and date specified will be answered by Addendum and posted on BidNet Direct . The project is tore - cover existing flat roof with new asphaltic coverboard on buildings 1 ( approximately 77 , 398 SF ) & 2 ( approximately 4 , 856 SF ), with 2 - Ply Soprema Roof System as shown in construction documents & specifications . The project scope includes , but is not limited to : Delegated engineering , including signed and sealed shop drawings and calculations for all items exposed to wind ; field engineer solutions when concealed conditions deviate from or are prohibitive to performing the work as shown in the drawings ; testing and engineering as shown in the drawings and specifications ; selectively sawcut and remove concrete to enlarge openings at primary and secondary scupper locations and create new secondary scupper openings as shown ; remove and replace existing copings , expansion joints , scuppers , conductor heads , downspouts and counter flashings with new as shown ; provide joint sealants ; perform miscellaneous painting ; disconnect , store and reconnect roof equipment as required to perform the work ; temporarily remove lightning protection system recording current condition , re - certify , and re - install , making any necessary repairs or component replacements ; perform camera inspection of the horizontal underground portion of all downspout locations and jet to the nearest catch basin and vacuum debris ; perform miscellaneoustree pruning . Scope of work listed is general in nature . Refer to drawings and specifications for detailed scope information . There is limited as - built information available and portions of what has been observed in the field deviates from the as - built information . For any / all areas where the plans or specifications are silent , conflict , or lack information , the contractor shall base his cost on the more expensive materials and / or methods of completing the work . Metal roofs and walkway covers are not included in the scope of work . ADDITIONAL PROJECT INFORMATION : BALANCE OF LINE : The “ balance of line ” shall include products and services that are not requested in this . Invitation to Bid , but are within the scope of products and services available from the awardee ( s ). The School District reserves the right to add these products and services to the awarded items . Additions shall be submitted as they occur . Deletions and discontinued items shall be reported by bid awarded vendor as they occur . Refer to Additional Information Document . All materials should be based on the School District Specifications , which includes an approved equal . Any existing lightning protection equipment shall be removed and reinstalled . The reinstalled lightning protection system shall be re - certified in accordance with NFPA 780 , UL 96A , and Design and Material Standards Section 26 41 00 . Provide UL Master Label to the owner upon completion . Provide ( Furnish and Install ) extensions / increases , including but not limited to cabling , air terminals , down conductors , ground rods , surge protective devices at switchgear , etc . to the existing system for the re - installed system to work as a complete , operational system upon completion of the work . Security signage is not included in this bid , and shall not be included in the pricing . The Contractor shall be responsible for the repair or replacement , including but not limited to : all surfaces , building elements , fencing , utilities , onsite and offsite elements , sidewalks , grasses , plantings , irrigation , and hardscape disturbed by and / or damaged by construction activities . If required , the Contractor will remove and / or modify chain link fencing , including adding gate ( s ), as needed for site access . Openings in the fence shall be secured at the end of each workday . Fencing is to be restored to equal or better condition upon completion of the work . All work during the summer can be completed during the day or night per the SPA / School approval . The schedule will still have to be worked out with the school as summer activities will be happening on - site . During the school year , work can be performed after the school day is completed but the schedule will have to be coordinated with school staff as there are activities at night . Holidays and weekends can be day or night work however , the Contractor will still need to coordinate with school staff & SPA as activities are sometimes scheduled during these times . All work shall be performed in accordance with the Florida Building Code 2023 , Florida Building Code 2023 8th ed , District Master Specifications , 2023 , and the ANSI / AWWA C210 ‐ 84 . Clean ‐ up and disposal of all debris generated during the Project . Final inspection to ensure compliance with building codes , manufacturer specifications , and project requirements . See more |
Location
Country | United States of America (USA) |
State | Palmbeachschools |
City | Palm Beach |
Source
Source | Palm Beach Schools (PALMBEACHSCHOOLS) |
URL |
More Details
Record type | Tender |
Sector | Water Supply and Storage, Wind, Telecommunications, Metal, Commercial, Cement, Residential |
Article published date | 2026-04-29 |
Research
Free account
View all details
You are reading the public part. A free account opens the rest:
- Every detail on this tender
- News and media coverage
- Technical research
Free account · no card · lands you back on this tender
More Water Supply and Storage tenders in United States of America
- RFP - Thurston County Lake Management Districts Submerged Aquatic Vegetation Control
- Coatings for Wet Well and Manholes
- Sole Source for Wedeco UV BulbsBallets
- Security Hardware Services
- Chambers Creek Regional Wastewater Treatment Plant BNR Aeration Basin Airflow Meters
- Se Dixie Highway County Road A1A Utility Relocation Project
- UNPAINTED SNOW FENCE AND DUNE GRASS NO II
- PreQualification of Bidders for Chaboya Improvements
