logo

26 - 62D WEST GATE ELEMENTARY SCHOOL - ROOFING

Sector: Water Supply and Storage • Location: Palm Beach, Palmbeachschools, United States of America

Source: Palm Beach Schools (PALMBEACHSCHOOLS)

Tender
Closed

The School Board of Palm Beach County , Florida invitesCertified Roofing Contractors prequalified by the School Boardpursuant to SREF Chapter 4 . 1 prior to the Bid Due Date to submit a Bid . To be eligible , the vendor must be prequalified for bonding capacity in the amount of the advertised Construction

Status
Closed
Sector
Water Supply and Storage, Wind, Telecommunications, Metal, Commercial, Cement, Residential
Location
Palm Beach, Palmbeachschools, United States of America
Updated
3 Nov 2026
Source
Palm Beach Schools (PALMBEACHSCHOOLS)

ConstructChat

Ask ConstructChat about 26 - 62D WEST GATE ELEMENTARY SCHOOL - ROOFING

Pick a question to edit it, or write your own.

First answer free · no account

I am a

Tender Information FAQ

Tender Information

3 Q
The tender “26 - 62D WEST GATE ELEMENTARY SCHOOL - ROOFING” is a tender record in Taiyo, linked to the Water Supply and Storage sector. It is issued for works, goods, or services related to Palm Beach, Palmbeachschools, United States of America.

Participants

Not available for this record.

Status

Original status

closed

Taiyo status

Closed

Taiyo last update

2026-11-03

Contact

Not available for this record.

Description

Description

The School Board of Palm Beach County , Florida invitesCertified Roofing Contractors prequalified by the School Boardpursuant to SREF Chapter 4 . 1 prior to the Bid Due Date to submit a Bid . To be eligible , the vendor must be prequalified for bonding capacity in the amount of the advertised Construction Budget or evidence bonding capacity in that amount prior to the Bid due date . The School District of Palm Beach County , Florida , will receive ( viaBidNet Direct @ www . bidnetdirect . com ) sealed Bids for : Project Name : WEST GATE ELEMENTARY SCHOOL - ROOFINGPROJECT ADDRESS : 1545 LOXAHATCHEE DRIVEWEST PALM BEACH , FL 33409ITB NO .: 26 - 62DPROJECT NO .: 0481 - 2503ESTABLISHED PROJECT BUDGET FOR CONSTRUCTION : $ 2 , 310 , 000 . 00PROCUREMENT SCHEDULEMANDATORY SITE INSPECTION : APRIL 7 , 2026 at 9 : 00 A . M ., ESTQUESTIONS DUE : APRIL 13 , 2026 , NO LATER THAN 2 : 00 P . M ., EST viaBidNet Direct @ www . bidnetdirect . comFINAL ADDENDUM ISSUED : APRIL 20 , 2026 viaBidNet Direct @ www . bidnetdirect . comBIDS DUE : APRIL 27 , 2026 , NO LATER THAN 2 : 00 P . M ., EST viaBidNet Direct @ www . bidnetdirect . comMANDATORY SITE INSPECTIONEach Bidder must attend a Mandatory Site Inspection at the project location to be eligible to submit a Bid . Site inspection will be held onAPRIL 7 , 2026as scheduled : WEST GATE ELEMENTARY SCHOOL1545 LOXAHATCHEE DRIVWEST PALM BEACH , FL 33409MEET IN FRONT OFFICE AND SIGN INDIRECTIONS : I - 95 to Okeechobee West to Congress Ave . South one block to Westgate Ave . West three blocks to Osceola Dr . South two blocks , school is on left . BID GUARANTEEEach Bid shall be accompanied by a Bid Guarantee in the amount of $ 115 , 500 . 00 . The Guarantee shall be in the form of either a Bid Bond or Cashier ’ s Check payable to The School District of Palm Beach County . All Bidders must be licensed pursuant to Chapter 489Florida Statutes . The successful Bidder will be required to furnish a 100 % Performance Bond . No Bid may be withdrawn after the scheduled closing for receipt of Bids for a period of 60 days . The Board or its designee reserves the right to waive minor technicalities and irregularities in all Bids . Further , in order to protect the integrity of the Award Process , all questions regarding this solicitation must be submitted viaBidNet Direct @ www . bidnetdirect . comNO LATER THAN 2 : 00 P . M ., EST on APRIL 13 , 2026 . Only questions received viaBidNet Direct @ www . bidnetdirect . comby the time and date specified will be answered by Addendum and posted on BidNet Direct . The project is tore - cover existing flat roof with new asphaltic coverboard on buildings 1 ( approximately 77 , 398 SF ) & 2 ( approximately 4 , 856 SF ), with 2 - Ply Soprema Roof System as shown in construction documents & specifications . The project scope includes , but is not limited to : Delegated engineering , including signed and sealed shop drawings and calculations for all items exposed to wind ; field engineer solutions when concealed conditions deviate from or are prohibitive to performing the work as shown in the drawings ; testing and engineering as shown in the drawings and specifications ; selectively sawcut and remove concrete to enlarge openings at primary and secondary scupper locations and create new secondary scupper openings as shown ; remove and replace existing copings , expansion joints , scuppers , conductor heads , downspouts and counter flashings with new as shown ; provide joint sealants ; perform miscellaneous painting ; disconnect , store and reconnect roof equipment as required to perform the work ; temporarily remove lightning protection system recording current condition , re - certify , and re - install , making any necessary repairs or component replacements ; perform camera inspection of the horizontal underground portion of all downspout locations and jet to the nearest catch basin and vacuum debris ; perform miscellaneoustree pruning . Scope of work listed is general in nature . Refer to drawings and specifications for detailed scope information . There is limited as - built information available and portions of what has been observed in the field deviates from the as - built information . For any / all areas where the plans or specifications are silent , conflict , or lack information , the contractor shall base his cost on the more expensive materials and / or methods of completing the work . Metal roofs and walkway covers are not included in the scope of work . ADDITIONAL PROJECT INFORMATION : BALANCE OF LINE : The “ balance of line ” shall include products and services that are not requested in this . Invitation to Bid , but are within the scope of products and services available from the awardee ( s ). The School District reserves the right to add these products and services to the awarded items . Additions shall be submitted as they occur . Deletions and discontinued items shall be reported by bid awarded vendor as they occur . Refer to Additional Information Document . All materials should be based on the School District Specifications , which includes an approved equal . Any existing lightning protection equipment shall be removed and reinstalled . The reinstalled lightning protection system shall be re - certified in accordance with NFPA 780 , UL 96A , and Design and Material Standards Section 26 41 00 . Provide UL Master Label to the owner upon completion . Provide ( Furnish and Install ) extensions / increases , including but not limited to cabling , air terminals , down conductors , ground rods , surge protective devices at switchgear , etc . to the existing system for the re - installed system to work as a complete , operational system upon completion of the work . Security signage is not included in this bid , and shall not be included in the pricing . The Contractor shall be responsible for the repair or replacement , including but not limited to : all surfaces , building elements , fencing , utilities , onsite and offsite elements , sidewalks , grasses , plantings , irrigation , and hardscape disturbed by and / or damaged by construction activities . If required , the Contractor will remove and / or modify chain link fencing , including adding gate ( s ), as needed for site access . Openings in the fence shall be secured at the end of each workday . Fencing is to be restored to equal or better condition upon completion of the work . All work during the summer can be completed during the day or night per the SPA / School approval . The schedule will still have to be worked out with the school as summer activities will be happening on - site . During the school year , work can be performed after the school day is completed but the schedule will have to be coordinated with school staff as there are activities at night . Holidays and weekends can be day or night work however , the Contractor will still need to coordinate with school staff & SPA as activities are sometimes scheduled during these times . All work shall be performed in accordance with the Florida Building Code 2023 , Florida Building Code 2023 8th ed , District Master Specifications , 2023 , and the ANSI / AWWA C210 ‐ 84 . Clean ‐ up and disposal of all debris generated during the Project . Final inspection to ensure compliance with building codes , manufacturer specifications , and project requirements . See more

Location

Country

United States of America (USA)

State

Palmbeachschools

City

Palm Beach

Source

Source

Palm Beach Schools (PALMBEACHSCHOOLS)

URL

More Details

Record type

Tender

Sector

Water Supply and Storage, Wind, Telecommunications, Metal, Commercial, Cement, Residential

Article published date

2026-04-29

More on this tender

Research

Free account

View all details

You are reading the public part. A free account opens the rest:

  • Every detail on this tender
  • News and media coverage
  • Technical research
View all details

Free account · no card · lands you back on this tender