logo
TenderUnder Evaluation

26RFP150795K-JAJ Friendship Pump Station Progressive Design/Build

The scope, dates and status of this tender. A free account opens every field.

Fulton County, Georgia "County" This is Phase I of The Friendship Pump Station Progressive Design Build(FPS) . The FPS, which includes the associated force main, will serve the sewer drainage basin between South Fulton Pkwy, Cochran Mill Road, Cedar Grove Road and Rivertown Road. An Additional pump station, known as Cochran Road Pump Station (CRPS), will be built by Minerva USA near 5405 Cochran M

Status
Closed
Sector
Waste Processing and Treatment, Road, Power Transmission, Power Generation (CCGT)
Location
Georgia, United States of America
Updated
3 Nov 2026
Source
Georgia Procurement Registry

ConstructChat

Ask ConstructChat about 26RFP150795K-JAJ Friendship Pump Station Progressive Design/Build

Pick a question to edit it, or write your own.

First answer free · no account

I am a

Tender Information FAQ

Tender Information

3 Q
The tender “26RFP150795K-JAJ Friendship Pump Station Progressive Design/Build” is a tender record in Taiyo, linked to the Waste Processing and Treatment sector. It is issued for works, goods, or services related to Georgia, United States.

Participants

Not available for this record.

Status

Original status

under evaluation

Taiyo status

Closed

Taiyo last update

2026-11-03

Contact

Not available for this record.

Description

Description

Fulton County, Georgia "County" This is Phase I of The Friendship Pump Station Progressive Design Build(FPS) . The FPS, which includes the associated force main, will serve the sewer drainage basin between South Fulton Pkwy, Cochran Mill Road, Cedar Grove Road and Rivertown Road. An Additional pump station, known as Cochran Road Pump Station (CRPS), will be built by Minerva USA near 5405 Cochran Mill Rd, that will convey flows to FPS. Both FPS and CRPS flows will be discharged to the Fulton County Cedar Grove Pump Station and to the Jones Road interceptor sewer where a tee, valve and manifold shall be installed for future connections. The invert Elevation at FPS will be set to allow the gravity system to enter from both northern and western sides of the wet well.

Original sector

Services / Special Projects

Location

Country

United States of America (USA)

State

Georgia

Source

Source

Georgia Procurement Registry

URL

More Details

Record type

Tender

Sector

Waste Processing and Treatment, Road, Power Transmission, Power Generation (CCGT)

Article published date

2026-10-22

More on this tender

Research

Free account

View all details

You are reading the public part. A free account opens the rest:

  • Every detail on this tender
  • News and media coverage
  • Technical research
View all details

Free account · no card · lands you back on this tender