3" Cryogenic Vent Stack with Changeable Terminations
Sector: Hydrogen • Location: United Kingdom
Source: Open Contracting Data Standard (OCDS)
HSE require a 3" vent stack for use with cryogenic hydrogen for an experimental programme. The vent must have interchangeable terminations (miter cut, bullhorn, lambda) which may be on a flanged connection or otherwise joined. The vent stack should be 4 m tall and terminate in a 3" ANSI Class 300 flange. 0.5 m from the top there should be two bosses with ¼" BSP female fittings and another boss wit
- Status
- Bidding
- Sector
- Hydrogen, LNG
- Location
- United Kingdom
- Updated
- 3 Nov 2026
- Source
- Open Contracting Data Standard (OCDS)
ConstructChat
Ask ConstructChat about 3" Cryogenic Vent Stack with Changeable Terminations
Pick a question to edit it, or write your own.
First answer free · no account
Tender Information FAQ
Tender Information
Participants
| Not available for this record. |
Status
Original status | active |
Taiyo status | Bidding |
Taiyo last update | 2026-11-03 |
Contact
| Not available for this record. |
Description
Description | HSE require a 3" vent stack for use with cryogenic hydrogen for an experimental programme. The vent must have interchangeable terminations (miter cut, bullhorn, lambda) which may be on a flanged connection or otherwise joined. The vent stack should be 4 m tall and terminate in a 3" ANSI Class 300 flange. 0.5 m from the top there should be two bosses with ¼" BSP female fittings and another boss with a 7/16" UNJF female fitting. The vent stack must have a maximum allowable working pressure of 40 barg. The vent stack should have a manual drain valve at the bottom of the stack which is spring loaded (normally closed). 1.5 m from the bottom of the vent stack should be a 3" ANSI flange connection and a 1½" ANSI flange connection. Both these flanges must be Class 300. The vent should come with 3 interchangeable termination designs which are on 3" ANSI Class 300 flanges to attach to the top of the vent stack. Suitable gaskets and torque values/calculations for all flanges should be provided. See In-tend for full requirements |
Location
Country | United Kingdom (UK) |
Source
Source | Open Contracting Data Standard (OCDS) |
URL |
More Details
Record type | Tender |
Sector | Hydrogen, LNG |
Article published date | 2026-04-02 |
Research
Free account
View all details
You are reading the public part. A free account opens the rest:
- Every detail on this tender
- News and media coverage
- Technical research
Free account · no card · lands you back on this tender
More Hydrogen tenders in United Kingdom
- LAB1040 AP - Mass Spectrometry & Chromatography Equipment (APUC)
- Procurement of Testing Campaign Using a Packed Bed Flow Reactor – PP-UKIFS - 458
- Peak Scientific Service Agreement
- National Focal Centre (NFC) to Model and Map Air Pollution Impacts on UK habitat
- CSP26809 - Hydrogen Moderator
- CSSD Annual Audit
- High-Precision laboratory-based laser absorption spectrometer
- Expert Networks Long Term Provision
