logo

3" Cryogenic Vent Stack with Changeable Terminations

Sector: LNG • Location: United Kingdom

Source: Open Contracting Data Standard (OCDS)

Tender
Active

HSE require a 3" vent stack for use with cryogenic hydrogen for an experimental programme. The vent must have interchangeable terminations (miter cut, bullhorn, lambda) which may be on a flanged connection or otherwise joined. The vent stack should be 4 m tall and terminate in a 3" ANSI Class 300 flange. 0.5 m from the top there should be two bosses with ¼" BSP female fittings and another boss wit

Status
Closed
Sector
LNG, Hydrogen
Location
United Kingdom
Updated
3 Nov 2026
Source
Open Contracting Data Standard (OCDS)

ConstructChat

Ask ConstructChat about 3" Cryogenic Vent Stack with Changeable Terminations

Pick a question to edit it, or write your own.

First answer free · no account

I am a

Tender Information FAQ

Tender Information

3 Q
The tender “3" Cryogenic Vent Stack with Changeable Terminations” is a tender record in Taiyo, linked to the LNG sector. It is issued for works, goods, or services related to United Kingdom.

Participants

Not available for this record.

Status

Original status

active

Taiyo status

Closed

Taiyo last update

2026-11-03

Contact

Not available for this record.

Description

Description

HSE require a 3" vent stack for use with cryogenic hydrogen for an experimental programme. The vent must have interchangeable terminations (miter cut, bullhorn, lambda) which may be on a flanged connection or otherwise joined. The vent stack should be 4 m tall and terminate in a 3" ANSI Class 300 flange. 0.5 m from the top there should be two bosses with ¼" BSP female fittings and another boss with a 7/16" UNJF female fitting. The vent stack must have a maximum allowable working pressure of 40 barg. The vent stack should have a manual drain valve at the bottom of the stack which is spring loaded (normally closed). 1.5 m from the bottom of the vent stack should be a 3" ANSI flange connection and a 1½" ANSI flange connection. Both these flanges must be Class 300. The vent should come with 3 interchangeable termination designs which are on 3" ANSI Class 300 flanges to attach to the top of the vent stack. Suitable gaskets and torque values/calculations for all flanges should be provided. See In-tend for full requirements

Location

Country

United Kingdom (UK)

Source

Source

Open Contracting Data Standard (OCDS)

URL

More Details

Record type

Tender

Sector

LNG, Hydrogen

Article published date

2026-03-16

More on this tender

Research

Free account

View all details

You are reading the public part. A free account opens the rest:

  • Every detail on this tender
  • News and media coverage
  • Technical research
View all details

Free account · no card · lands you back on this tender