logo

300 SP Tippecanoe Wastewater Equipment PM

Sector: Power Generation (CCGT) • Location: Indiana, United States of America

Source: Indiana Purchasing Group

Tender
Closed

1 . Inspect lift station before any service work is begun . 2 . Pump down wet well completely and inspect condition of piping components . 3 . Remove and dispose of any debris or trash located in the wet well . 4 . Visually inspect the pumps and cords in wet well for signs of wear , insulation breakage ,

Status
Closed
Sector
Power Generation (CCGT), Water Supply and Storage
Location
Indiana, United States of America
Updated
3 Nov 2026
Source
Indiana Purchasing Group

ConstructChat

Ask ConstructChat about 300 SP Tippecanoe Wastewater Equipment PM

Pick a question to edit it, or write your own.

First answer free · no account

I am a

Tender Information FAQ

Tender Information

3 Q
The tender “300 SP Tippecanoe Wastewater Equipment PM” is a tender record in Taiyo, linked to the Power Generation (CCGT) sector. It is issued for works, goods, or services related to Indiana, United States of America.

Participants

Not available for this record.

Status

Original status

closed

Taiyo status

Closed

Taiyo last update

2026-11-03

Contact

Not available for this record.

Description

Description

1 . Inspect lift station before any service work is begun . 2 . Pump down wet well completely and inspect condition of piping components . 3 . Remove and dispose of any debris or trash located in the wet well . 4 . Visually inspect the pumps and cords in wet well for signs of wear , insulation breakage , cord entanglement , and deterioration of bolts , fasteners , or piping . 5 . Measure float placement and reconcile with original construction drawings . 6 . Check operation of all floats ( including alarm floats ). 7 . Inspect control panel . Look for signs of corrosive gas leakage into panel . 8 . Clean all contacts for pitting file , if necessary , and spray with protective coating . Check all screw connections for tightness . 9 . If gas leakage has occurred , then repair damage . Locate source of leakage and correct . 10 . Check voltage at panel entrance and check condition of all fuses and breakers . 11 . Run pumps individually to check rotation , amperage , and pumping capacity . This can be done by measuring the wet well , as pump is running and calculating the GPM . 12 . Run pumps , in lead lag system : Check for voltage in supply line , adjust for power factor correction , and service phase converters , if utilized , at least once per year . Note : similar voltage , amperage , power factor tests SHALL also be conducted at water and wastewater plants , by certified personnel . Make recommendations based on findings . 13 . Check wet well and verify alarm circuit is functioning properly and phone dialer is working ( if station is equipped ). Check that warning lights and other devices are working and protected from the weather . 14 . If pressure tapping is available , take a pressure reading with pumps off , with one pump running , and with both pumps running . Where deemed necessary for better diagnosis , give an estimate to p

Location

Country

United States of America (USA)

State

Indiana

Source

Source

Indiana Purchasing Group

URL

More Details

Record type

Tender

Sector

Power Generation (CCGT), Water Supply and Storage

Article published date

2026-04-08

More on this tender

Research

Free account

View all details

You are reading the public part. A free account opens the rest:

  • Every detail on this tender
  • News and media coverage
  • Technical research
View all details

Free account · no card · lands you back on this tender