300 SP Tippecanoe Wastewater Equipment PM
Sector: Power Generation (CCGT) • Location: Indiana, United States of America
Source: Indiana Purchasing Group
1 . Inspect lift station before any service work is begun . 2 . Pump down wet well completely and inspect condition of piping components . 3 . Remove and dispose of any debris or trash located in the wet well . 4 . Visually inspect the pumps and cords in wet well for signs of wear , insulation breakage ,
- Status
- Closed
- Sector
- Power Generation (CCGT), Water Supply and Storage
- Location
- Indiana, United States of America
- Updated
- 3 Nov 2026
- Source
- Indiana Purchasing Group
ConstructChat
Ask ConstructChat about 300 SP Tippecanoe Wastewater Equipment PM
Pick a question to edit it, or write your own.
First answer free · no account
Tender Information FAQ
Tender Information
Participants
| Not available for this record. |
Status
Original status | closed |
Taiyo status | Closed |
Taiyo last update | 2026-11-03 |
Contact
| Not available for this record. |
Description
Description | 1 . Inspect lift station before any service work is begun . 2 . Pump down wet well completely and inspect condition of piping components . 3 . Remove and dispose of any debris or trash located in the wet well . 4 . Visually inspect the pumps and cords in wet well for signs of wear , insulation breakage , cord entanglement , and deterioration of bolts , fasteners , or piping . 5 . Measure float placement and reconcile with original construction drawings . 6 . Check operation of all floats ( including alarm floats ). 7 . Inspect control panel . Look for signs of corrosive gas leakage into panel . 8 . Clean all contacts for pitting file , if necessary , and spray with protective coating . Check all screw connections for tightness . 9 . If gas leakage has occurred , then repair damage . Locate source of leakage and correct . 10 . Check voltage at panel entrance and check condition of all fuses and breakers . 11 . Run pumps individually to check rotation , amperage , and pumping capacity . This can be done by measuring the wet well , as pump is running and calculating the GPM . 12 . Run pumps , in lead lag system : Check for voltage in supply line , adjust for power factor correction , and service phase converters , if utilized , at least once per year . Note : similar voltage , amperage , power factor tests SHALL also be conducted at water and wastewater plants , by certified personnel . Make recommendations based on findings . 13 . Check wet well and verify alarm circuit is functioning properly and phone dialer is working ( if station is equipped ). Check that warning lights and other devices are working and protected from the weather . 14 . If pressure tapping is available , take a pressure reading with pumps off , with one pump running , and with both pumps running . Where deemed necessary for better diagnosis , give an estimate to p |
Location
Country | United States of America (USA) |
State | Indiana |
Source
Source | Indiana Purchasing Group |
URL |
More Details
Record type | Tender |
Sector | Power Generation (CCGT), Water Supply and Storage |
Article published date | 2026-04-08 |
Research
Free account
View all details
You are reading the public part. A free account opens the rest:
- Every detail on this tender
- News and media coverage
- Technical research
Free account · no card · lands you back on this tender
More Power Generation (CCGT) tenders in United States of America
- RFP - Thurston County Lake Management Districts Submerged Aquatic Vegetation Control
- Coatings for Wet Well and Manholes
- Security Hardware Services
- 23B49SR Marine Science Center Turtle Canopy
- Purchase and Supply of Engine Oil for the McIntosh Reciprocating Engine Project MREP
- Chambers Creek Regional Wastewater Treatment Plant BNR Aeration Basin Airflow Meters
- Se Dixie Highway County Road A1A Utility Relocation Project
- PreQualification of Bidders for Chaboya Improvements
