logo

32 & 62 P - 2 Pump Rehabilitation

Sector: Water Supply and Storage • Location: Utah, United States of America

Source: Utah Purchasing Group

Tender
Closed

• Contractor shall execute the work described herein . • The pump and motor are currently operable and may be started for a short period of time ( 15 minutes or less ) to help diagnose problems . • The booster station is NOT equipped with hatchways above each pump / motor assembly for removing the pumps an

Status
Closed
Sector
Water Supply and Storage, Power Generation (CCGT), Steel, Commercial
Location
Utah, United States of America
Updated
3 Nov 2026
Source
Utah Purchasing Group

ConstructChat

Ask ConstructChat about 32 & 62 P - 2 Pump Rehabilitation

Pick a question to edit it, or write your own.

First answer free · no account

I am a

Tender Information FAQ

Tender Information

3 Q
The tender “32 & 62 P - 2 Pump Rehabilitation” is a tender record in Taiyo, linked to the Water Supply and Storage sector. It is issued for works, goods, or services related to Utah, United States of America.

Participants

Not available for this record.

Status

Original status

closed

Taiyo status

Closed

Taiyo last update

2026-11-03

Contact

Not available for this record.

Description

Description

• Contractor shall execute the work described herein . • The pump and motor are currently operable and may be started for a short period of time ( 15 minutes or less ) to help diagnose problems . • The booster station is NOT equipped with hatchways above each pump / motor assembly for removing the pumps and motors . There is a 2 - ton crane in the building that may be used once express written consent is given by JVWCD . • The electrical connections and instrumentation for the motor , for this pump , will be disconnected by JVWCD staff . The motor will need to be pulled by the Contractor and will need to be safely and securely left at the site . Once the pump is installed the motor will need to be reinstalled by the contractor . JVWCD staff will connect power and instrumentation . • A thorough disassembly and inspection of the pump shall be performed by the contractor . Contractor will allow the Owner to visit , review and discuss findings while pump is disassembled . • Reconditioning of the pump assembly shall include but not limited to : Replacement of the pump shaft , motor shaft , all line shafts and all couplings . Material shall be 416 stainless steel . Replacement of the line shaft bearings . Installation of new wear rings ( new rings shall be pinned ). Reconditioning of the packing box . Installation of a new packing box bearing and new packing . Exterior of the column pipe shall be sandblasted to a SP10 finish . Two ( 2 ) coats of a potable epoxy coating of not less than 6 mils each shall be applied to the ID and OD . Total overall thickness of coatings shall not be less than 12 mils . The coating color shall match the existing pump color before repairs were performed

Location

Country

United States of America (USA)

State

Utah

Source

Source

Utah Purchasing Group

URL

More Details

Record type

Tender

Sector

Water Supply and Storage, Power Generation (CCGT), Steel, Commercial

Article published date

2026-05-02

More on this tender

Research

Free account

View all details

You are reading the public part. A free account opens the rest:

  • Every detail on this tender
  • News and media coverage
  • Technical research
View all details

Free account · no card · lands you back on this tender