32 & 62 P - 2 Pump Rehabilitation
Sector: Water Supply and Storage • Location: Utah, United States of America
Source: Utah Purchasing Group
• Contractor shall execute the work described herein . • The pump and motor are currently operable and may be started for a short period of time ( 15 minutes or less ) to help diagnose problems . • The booster station is NOT equipped with hatchways above each pump / motor assembly for removing the pumps an
- Status
- Closed
- Sector
- Water Supply and Storage, Power Generation (CCGT), Steel, Commercial
- Location
- Utah, United States of America
- Updated
- 3 Nov 2026
- Source
- Utah Purchasing Group
ConstructChat
Ask ConstructChat about 32 & 62 P - 2 Pump Rehabilitation
Pick a question to edit it, or write your own.
First answer free · no account
Tender Information FAQ
Tender Information
Participants
| Not available for this record. |
Status
Original status | closed |
Taiyo status | Closed |
Taiyo last update | 2026-11-03 |
Contact
| Not available for this record. |
Description
Description | • Contractor shall execute the work described herein . • The pump and motor are currently operable and may be started for a short period of time ( 15 minutes or less ) to help diagnose problems . • The booster station is NOT equipped with hatchways above each pump / motor assembly for removing the pumps and motors . There is a 2 - ton crane in the building that may be used once express written consent is given by JVWCD . • The electrical connections and instrumentation for the motor , for this pump , will be disconnected by JVWCD staff . The motor will need to be pulled by the Contractor and will need to be safely and securely left at the site . Once the pump is installed the motor will need to be reinstalled by the contractor . JVWCD staff will connect power and instrumentation . • A thorough disassembly and inspection of the pump shall be performed by the contractor . Contractor will allow the Owner to visit , review and discuss findings while pump is disassembled . • Reconditioning of the pump assembly shall include but not limited to : Replacement of the pump shaft , motor shaft , all line shafts and all couplings . Material shall be 416 stainless steel . Replacement of the line shaft bearings . Installation of new wear rings ( new rings shall be pinned ). Reconditioning of the packing box . Installation of a new packing box bearing and new packing . Exterior of the column pipe shall be sandblasted to a SP10 finish . Two ( 2 ) coats of a potable epoxy coating of not less than 6 mils each shall be applied to the ID and OD . Total overall thickness of coatings shall not be less than 12 mils . The coating color shall match the existing pump color before repairs were performed |
Location
Country | United States of America (USA) |
State | Utah |
Source
Source | Utah Purchasing Group |
URL |
More Details
Record type | Tender |
Sector | Water Supply and Storage, Power Generation (CCGT), Steel, Commercial |
Article published date | 2026-05-02 |
Research
Free account
View all details
You are reading the public part. A free account opens the rest:
- Every detail on this tender
- News and media coverage
- Technical research
Free account · no card · lands you back on this tender
